HomeMy WebLinkAbout1721.3REGION NO
STATE
FEDERAL AID PROJ. NO.
SHEET NO
10
WASH
HE S - 00 0 S (28)
4 /7
20 0 �20_ 40 60
SCALE IN FEET
:•
MA
0C \
M
I
NE 10t ST
CON STRU CTiON NOTES
OTr
a ffic
signal heads
2,3,7a 8 — Remove existing heads and
install
all 12
inch section heads,
Traffic
signal
heads I a 6 -- Re p lace 12 inch g r e e n ba 11 lens
with
a 12
inch g re en a row lens .
3,
E xisting
t r a f f i c
signal controller Econ D-13000 — Install 3 rd
phase left
turn unit PM —20—BI and one switch pack
5
4 803 and
make operational.
0
Connect
existing
wiring for 3—phase operation . Roadway loops
&
conductors
existing .
`)
Re move
"Le f t T u
rn Must Yield ° sign locoted on end of m ost
a
r m .
M
ng
M
���
_
0U
m
an
MIMMMM
;PED.SIG. 21,r
..
s
M
! i,
23124 & 27
—Mimi
LLJ
� ~c0.l N O &" a 8
rtp` '"®SAC /, `t
UI-1 INA34`s a-0 'lop
A S
17:zl,
DIETERICH POST IOOOH . OPOOI T80
PHASING