HomeMy WebLinkAbout1721.4t�
:f10.N NO, STATE FEDERAL. AID PROJ. NO. SHEET NO.
Ip WASH E H S T-7102(2) 5/7
SPARES
- 7�c
�" � ► �
0,4 SIG /,,n S
6 / /
,P
6/3
6
G +3—
COMMON
0,4 S/G NOS
GJJ
R
cli
631
#
A
•— G12
(� 13
G
rer3
COMMON
OR .SIG HDS
6�I
R
# .4, 5
G 2 3
G
COMA?r0/V
0,6 SIG 14D S•�-
A
0 9, /o
G;2 3
G
C dNfYfON
G31
R
•
t/,6
�33
G
• -
685
G
35�
7//
LOW
OA ')E/)
7/6
C
$ PP83 s
�i6
FP,B
7/ 7
G
raw
it PAR's
7?5
•
7.;�' 7
C
OA Coop
#'t
8t3
DETECTION
814
#
818
CALL
•
erg
•
08 COO/'
8�2
/DETECT/ON
60:6
8,14
8�5
8?6
•
8a7
8�®
•
929
•
e OOP DET,
8 3;7
oc)
833
_
57/3
v
5/4
2
5/S
0
5/6
6/?
i
5/ 8
COMMON
5:4110
0,4 S14 HDS
9//
G 0,A S/4 ND S
9 / 3
-11
914
013 s/6 #DS
9; t
0,60 NOS
Q,
9;24
C),
COmmo/V
9/5
SERVICE AC t
50/
•
502
•
�I� I�I�
II� it" I� lz 1 1-1 11 1� I I I�
COO('-/OET 0 5
@C
4
W
�
e
8
8
U
aO,v'T 7.:PJ
o,8
7!5
Q
peo ho A
OA
r
7,?6
7J 7 ppg OR
PPP OA
PPS OA
iivTERCANNECT
TO SAWAL WEST
OR LOOP DET.
o'g LOdp 1::)ET.
5/C
8/G
2/C
PPI4 0,6 U
92 / r-/APE PRE EMP r/o/v
9" OR r1V,1439/5
PEO R
OA
:R
nh�t
V
u
V
•
•
1010
9� F��PE PIPE-EMP'r/GW
9/5
S/C
SVC
6?J R v
G? 7
S/4 No "i/O
SAG ND * 9
@ f3
411�
31C
3/G
.•PRY N 0'
e
tsa�c
•.,r�sTla p �p ''
51q g0'14'
S/G Ho *6
013
08
G.?3
6? 3 G
6?7
S/C
�!8 COOP /SET
013 COAL 'DE7
913
F/RE PRE- EMPT/ON 1 4
OA CE.8.) qr5
F/RE pRE-EMnTroN' q � �
@A (W. /3.) 9l�
NO. REVISION
S,
uuuuKSUaUuuuu
nneennnnnnnn
2
LOOP SET
V ;2 OA
7/6
O g
� 7i5
~ 04
7/6
�J PIPS OA
PP/3 08
�ooP �Er x/
LOOP ,A3
�C
!NTERCONNE"C T TO
S/6 AL EA S T
n
o
•
wwww�u�i
\j\l
�"
V
,6\
fi\
NJ
•
•
e
•
e
11
wwww
n
i3s,
(/I
U.1
v,w�6i
Gl
v
nw�v���
PI-13 OA
OpR @A
001V'r 7?/ PE/D NO i0��4
WALK 7?1 013
0 A
vvv
Ll D ff
pps @i4
CITY OF RENTON
ENGINEERING DEPARTMENT
TRAFFIC SIGNAL INSTALLATION
WIRING SCHEMATIC
N.E. SUNSET BLVD., N.E. IOTH ST. AND
HARRINGTON AVE. N. �
DES' C E M DATE' '
D E� BO FILE NO,
DRAW, G E M
CHECKEV
SCALE__ FIELD b00PC- M6L_
SY APTR. DATE APPROVED OF__7 -