HomeMy WebLinkAbout1722.1:oW \, \11 "f -1
0 - 70 D __j _' ''p 0
10 1 F� 27
SIGNALIZATION, ILLUMINATION and CHANNELIZATION
40[�EKP �0 \�j 0
GENERAL NOTES
1. THE CITY SHALL PROVIDE THE FOLLOWING EQUIPMENT:
A) SIGNALIZATION:
1) ALL VEHICLE SIGNAL HEADS WITH MOUNTING BRACKETS AND BACKPLATES,
2) ALL PEDESTRIAN SIGNAL HEADS WITH MOUNTING HARDWARE.
3) ONE FULL -ACTUATED CONTROLLER WITH TYPE P-1 CABINET.
B) ILLUMINATION:
1) ALL STREET LIGHT POLES, EXCEPT THE TWIN -TRUSS, 40' M.H. POLE,
ANCHOR BOLTS AND ASSOCIATED POLE HARDWARE.
2) ALL LUMINAIRES, LAMPS, AND PHOTO ELECTRIC CELLS.
2. THE CONTRACTOR SHALL INSTALL A PULL WIRE (#12 THW) IN EVERY SIGNAL
CONDUIT RUN, INCLUDING THE INTERCONNECT CIRCUIT.
3. ALL FOUNDATIONS SHALL BE AS INDICATED ON THE STANDARD PLANS, ATTACHED
PLANS, AND CONFORM TO THE FOLLOWING:
FOUNDATION FOR: STANDARD PLAN NO. DEPTH OF FOUNDATION
SIGNAL POLE
25' MAST ARM J-21d 6' - 0"
30' MAST ARM J-21d 6' - 0"
35' MAST ARM J-21d 7' - 0"
40' MAST ARM J-21d 7' - 0"
STREET LIGHT POLE 25' & 30' M.H. DETAIL SHEET 3' - 0"
STREET LIGHT POLE 40' M.H. E-10 4' - 0"
CONTROLLER CABINET DETAIL SHEET E-6 AS SHOWN
MASTER CONTACTOR J-21b AS SHOWN
4. ALL EXISTING SIGNAL INSTALLATIONS SHALL BE KEPT IN OPERATION UNTIL
THE NEW INSTALLATION IS COMPLETE. AT THE DIRECTION AND APPROVAL OF
THE ENGINEER, A TEMPORARY SIGNAL SYSTEM SHALL BE INSTALLED AT LOCATIONS
REQUESTED BY THE CONTRACTOR WHERE THE EXISTING SYSTEM CANNOT REMAIN IN
OPERATION FOR THE ADEQUATE COMPLETION OF THE PROJECT. ALL EXISTING
SIGNAL EQUIPMENT SHALL BE REMOVED AND DELIVERED TO THE CITY YARD.
5• ALL JUNCTION BOXES SHALL BE TYPE 1 UNLESS OTHERWISE SHOWN ON THE PLANS.
UAB PROJECT Ns 8—l-102(16)
•r /
�A �111
r ®•
!�m'!Illtlllll"j111 ill'I
ull� � IIIII IIIIIIIIIIIIIII
' � plllllil! dl Ild I I rlllll IIIII : 1�•��� �
11111111111111111"� -�
N III ' II!III � IIU�IIIII ��
. ! !IIIIlII��N .__" Ipllllh pll
11111111111111 1111 -IIIII i miIIIIIIII
1 111111! '111U!Illiilll• IIIIIIIIII
�11111111 IIIII Illllb dl ;flllll`
IIIIIIIihlllllllllll IIfni
LEGEND
TRAFFIC SIGNAL POLE & VEHICLE SIGNAL HEADS
PEDESTRIAN SIGNAL HEAD
PEDESTAL POLE OR PEDESTRIAN POST WITH
PUSHBUTTON & SIGN
CONTROLLER CABINET
JUNCTION BOX
CONDUIT
STREET LIGHT POLE
DOUBLE ARM STREET LIGHT POLE
STREET LIGHT ON SIGNAL POLE
MASTER CONTACTOR
PUGET POWER VAULT
RIGHT-OF-WAY
CURB LINE
`fit" F P
>�.. of wssk,� •.• ,r
• • 'g %
S/ONAL T��••�t�'
NO. 10416
washinaton
FNC:INFFWt A!C'MITFC'TC NANNFK VIIVFVAK NO.
o�
ENGINEERING DEPARTMENT
INDEX
SHM NO.
DESCRIPTION
FUNCTION
COVER SHEET
2 { 3
SUMMARY OF QUANTITIES
4
GRADY WAY & RAINIER AVENUE
SIGNALIZATION
s
GRADY WAY & LIND AVENUE
SIGNALIZATION
6
INTERSECTION WIRING SCHEDULES
SIGNALIZATION
7
STA 41 + 00 TO STA 47 +
00
ILLUMINATION
8
STA 47 + 00 TO STA 53 +
00
ILLUMINATION
9
STA 53 + 00 TO STA 58 +
33
ILLUMINATION
10
ILLUMINATION SCHEDULES
11
TFENC9 SCIIDDULI;
12
STA 3% + Oil TO STA 35 -�
:Ai ?�LIZ.ATION
t3
STA 35 + 82 TO STA 41 +
00
CHANN'ELIZATION
14
STA 41 + 00 TO STA 47 +
00
CHANNELIZATION
Is
STA 47 + 00 TO STA 53 +
00
CHANNELIZATION
16
_)TA 53 + OCT? STA 5P +
O'
CHANrTELT7ATTON
CITY OF RENTON
ENGINEERING DEPARTMENT
DESIGNED DAT'f {FB,• /6,/972 p,LE NO /6
DRA
_ cNEcicEo p,�� SCALE P"NL.D �prA
REVISION BY ALN•R. DATE AP94ROVED SNEET / OR�_
r