Loading...
HomeMy WebLinkAbout1722.1:oW \, \11 "f -1 0 - 70 D __j _' ''p 0 10 1 F� 27 SIGNALIZATION, ILLUMINATION and CHANNELIZATION 40[�EKP �0 \�j 0 GENERAL NOTES 1. THE CITY SHALL PROVIDE THE FOLLOWING EQUIPMENT: A) SIGNALIZATION: 1) ALL VEHICLE SIGNAL HEADS WITH MOUNTING BRACKETS AND BACKPLATES, 2) ALL PEDESTRIAN SIGNAL HEADS WITH MOUNTING HARDWARE. 3) ONE FULL -ACTUATED CONTROLLER WITH TYPE P-1 CABINET. B) ILLUMINATION: 1) ALL STREET LIGHT POLES, EXCEPT THE TWIN -TRUSS, 40' M.H. POLE, ANCHOR BOLTS AND ASSOCIATED POLE HARDWARE. 2) ALL LUMINAIRES, LAMPS, AND PHOTO ELECTRIC CELLS. 2. THE CONTRACTOR SHALL INSTALL A PULL WIRE (#12 THW) IN EVERY SIGNAL CONDUIT RUN, INCLUDING THE INTERCONNECT CIRCUIT. 3. ALL FOUNDATIONS SHALL BE AS INDICATED ON THE STANDARD PLANS, ATTACHED PLANS, AND CONFORM TO THE FOLLOWING: FOUNDATION FOR: STANDARD PLAN NO. DEPTH OF FOUNDATION SIGNAL POLE 25' MAST ARM J-21d 6' - 0" 30' MAST ARM J-21d 6' - 0" 35' MAST ARM J-21d 7' - 0" 40' MAST ARM J-21d 7' - 0" STREET LIGHT POLE 25' & 30' M.H. DETAIL SHEET 3' - 0" STREET LIGHT POLE 40' M.H. E-10 4' - 0" CONTROLLER CABINET DETAIL SHEET E-6 AS SHOWN MASTER CONTACTOR J-21b AS SHOWN 4. ALL EXISTING SIGNAL INSTALLATIONS SHALL BE KEPT IN OPERATION UNTIL THE NEW INSTALLATION IS COMPLETE. AT THE DIRECTION AND APPROVAL OF THE ENGINEER, A TEMPORARY SIGNAL SYSTEM SHALL BE INSTALLED AT LOCATIONS REQUESTED BY THE CONTRACTOR WHERE THE EXISTING SYSTEM CANNOT REMAIN IN OPERATION FOR THE ADEQUATE COMPLETION OF THE PROJECT. ALL EXISTING SIGNAL EQUIPMENT SHALL BE REMOVED AND DELIVERED TO THE CITY YARD. 5• ALL JUNCTION BOXES SHALL BE TYPE 1 UNLESS OTHERWISE SHOWN ON THE PLANS. UAB PROJECT Ns 8—l-102(16) •r / �A �111 r ®• !�m'!Illtlllll"j111 ill'I ull� � IIIII IIIIIIIIIIIIIII ' � plllllil! dl Ild I I rlllll IIIII : 1�•��� � 11111111111111111"� -� N III ' II!III � IIU�IIIII �� . ! !IIIIlII��N .__" Ipllllh pll 11111111111111 1111 -IIIII i miIIIIIIII 1 111111! '111U!Illiilll• IIIIIIIIII �11111111 IIIII Illllb dl ;flllll` IIIIIIIihlllllllllll IIfni LEGEND TRAFFIC SIGNAL POLE & VEHICLE SIGNAL HEADS PEDESTRIAN SIGNAL HEAD PEDESTAL POLE OR PEDESTRIAN POST WITH PUSHBUTTON & SIGN CONTROLLER CABINET JUNCTION BOX CONDUIT STREET LIGHT POLE DOUBLE ARM STREET LIGHT POLE STREET LIGHT ON SIGNAL POLE MASTER CONTACTOR PUGET POWER VAULT RIGHT-OF-WAY CURB LINE `fit" F P >�.. of wssk,� •.• ,r • • 'g % S/ONAL T��••�t�' NO. 10416 washinaton FNC:INFFWt A!C'MITFC'TC NANNFK VIIVFVAK NO. o� ENGINEERING DEPARTMENT INDEX SHM NO. DESCRIPTION FUNCTION COVER SHEET 2 { 3 SUMMARY OF QUANTITIES 4 GRADY WAY & RAINIER AVENUE SIGNALIZATION s GRADY WAY & LIND AVENUE SIGNALIZATION 6 INTERSECTION WIRING SCHEDULES SIGNALIZATION 7 STA 41 + 00 TO STA 47 + 00 ILLUMINATION 8 STA 47 + 00 TO STA 53 + 00 ILLUMINATION 9 STA 53 + 00 TO STA 58 + 33 ILLUMINATION 10 ILLUMINATION SCHEDULES 11 TFENC9 SCIIDDULI; 12 STA 3% + Oil TO STA 35 -� :Ai ?�LIZ.ATION t3 STA 35 + 82 TO STA 41 + 00 CHANN'ELIZATION 14 STA 41 + 00 TO STA 47 + 00 CHANNELIZATION Is STA 47 + 00 TO STA 53 + 00 CHANNELIZATION 16 _)TA 53 + OCT? STA 5P + O' CHANrTELT7ATTON CITY OF RENTON ENGINEERING DEPARTMENT DESIGNED DAT'f {FB,• /6,/972 p,LE NO /6 DRA _ cNEcicEo p,�� SCALE P"NL.D �prA REVISION BY ALN•R. DATE AP94ROVED SNEET / OR�_ r