Loading...
HomeMy WebLinkAbout1730.1Z)TREET LIIGHTIING AND SlIGNAL INTERCONNECI CONSTRUCTION NOTES WIRING AND CONDUIT SCHEDULE INSTALL DESCRIPTION OI Provide Trench (21x 31 ) 8► Select Ba c kf ill I Traffic Signal Interconnect (Conduit to have 24 inches of Cover) Cable 3-Pair See Detail sheet Install aluminum Davit - Style light standard Lighting Conductor 2- 8c (40 MTG, height ) at approximate location shown Interconnect Cable 6-Pair 0 Install street light service cabinet >3 Lighting Conductor 2-8c Coil enough conductor at base of wood pole to Interconnect Cable 3-Pair reach existing luminaire. Puget Power will connect luminaire and install riser conduit. l_ighting Conductor 2-8c OSawcut , removal 8 replacement of 1811 of sidewalk per bid items schedule A (approximately 185 L.F.1 Lighting Conductor 2-6c with grown d GENERAL NOTE The contractor shall provide al I Li ai son between this project and p s p & 1 co . , and be re sponsi ble for all connections to service seconory, , The contractor shall adhere to p s p 5 1 standards and regulations . The contractor is to provide joint trench for Puget Power8 Light Co. and Group W Cable Co . Ea c h Uti lily shol I install their own conduits All trenching 1. x 2i with 2 411 cover unless otherwise shown. See- Detail sheet. 7 Traffic Signal Interconnect Cable 6 -Pair I- I' Conduit PVC Schedule 40 I--1�2�Conduit PVC Schedule 40 1-1�2 Conduit PVC Schedule 40 I-I/I„ 2 Conduit PVC Schedule 80 Use Existing Conduit 1-1Ill /2 Conduit PVC Schedule 40 11 I-I%2 Conduit PVC Schedule 40 Use Existing Conduit SEE Typical Detail sheet for standard Lighting Installation LEGEND 0®0 Street Light Standard 81 Luminaire (400 Watt Sodium vapor) Conduit ( New ) Conduit ( Existing ) ® Service Cabinet, Street Lighting ® Junction Box ( New) See Detail Sheet 0 Junction Box (Existing) O Puget Sound Power B Light Service Service Location DIETERIQH POST 1000H • DPOO118D FIELD BOOK-. SHEET CF 13 r