Loading...
HomeMy WebLinkAbout1731.2F-: U) L d' W Z F. I 1 + 00 2 + 00 RIGID STEEL CONDUIT 3 + 00 & CAP BREM ERTON AV E v � U) W 4 Z_ J I = 6 + 00 U F- Q # 3386 F 10+42 N. E. * 3382F 3 3 + 94 4+00 PSPL TX T6 SEE SHEET APPROX. -y I 100' /'oo I o,` # 3384 F �\ I PEDESTAL 3 3 �j `2/7+18 1 P s t- 1405-2 Lo �i OVA 7+00 8 +00 12 + 04 I LL O 4 W Z_ W J-- -- -- -+- -- -- 1 1 + 00 13 + 00 U Q FUTURE # 6 AT 8 + 80 FUTURE �. ---� 36" BRED E'3TON AV. NE CROSS-SECTION REV[ EWED s� APPROVED PUBLIC WORKS DIRECTOR DATE v 4- U) `v�1► A R A41 r WAS i �4NAL E� j �J NORTH .0 0 F EET �Q FLAT LENS COBRA HEAD 250 WATT HPS, 240 V. MEDIUM SEMI CUTOFF III DISTRIBUTION ON 35 DAVIT POLE WITH 6' ARM ® JUNCTION BOX WSDOT J-11a TYPE I 0!/ 21 I C. 3 #4 (36" COVER MINIMUM) O2 1.5" C. 2 #8, 3 #12, 1 #10 GRND. O3 1.5" C. 2 -*8, 1 *10 GRND. 4O 1.5" CONDUIT ONLY I v U) LLI Z_ J LUMINAIRE SCHEDULE LUMINAIRE POLE ARM CIRUIT NO. LOCATION LENGTH NO. 3380F 0 + 70 6 1 3382 F 3 + 94 6 1 3384 F 7 + 18 6' 1 3386F 10+42 6' 1 MOUNT PHOTO ELECTRIC CELL ON LUMINAI RE # 3384 F NU. I ntvisiuN I DATE JD- 21 ENGINEERS 2� 1840 • 130th N.E. Suite 15 Bellevue, Wash. 98005 885,2195 PROJECT /OWNFr WINDSOR PLACE DWG TITLE BREMERTON STREETLIGHTING PLAN SCALE: I" c 20' DRAWN di C.L.F. DRAWING NUMBER DATE: 7-27-88 DESIGN BY: J.D.A. 1405-1 /D 7