HomeMy WebLinkAbout1731.3MATCH LINE Sta. 103 + 00
BREMERTON AVENUE N. E.
END OF CONSTRUCTION
MATCH LINE Sta. 103 + 00
LUMINAIRE SCHEDULE
IINAIRE
POLE
ARM
CIRCUIT
NO.
LOCATION
LENGTH
NO.
1387C
105 + 90
6
2
5388C
104 + 32
6
2
5389C
102+74
6
2
5390C
101 + 16
1 6'
2
NORTH
20 0 40
FEET
KEY
FLAT LENS COBRA HEAD 150 WATT HPS, 240 V.
o-0 MEDIUM SEMI CUTOFF III DISTRIBUTION ON 35
DAVIT POLE WITH 6' ARM
® JUNCTION BOX WSDOT J-11c TYPE I
1.5'1C. 2 #8, I # 10 G RND.
04 1.5'1 CONDUIT ONLY
R/ W
25`
N. E. 5TH STREET CROSS-SECTION
REVIEWED:
APPROVED
PUBLIC WORKS DIRECTOR DATE
WASy
C
yMAL
N0. REVISION DATE
JD • 21 ENGINEERS
021 1840 • 130th N. E. Su it e 15
Bellevue, Wash. 98005 885. 2195
PROJECT /OWNF
WINDSOR PLACE
DWG TITI F
_N.E. 5th ST
SCALE 1= 20,
DATE: 7-27-88
STREETLIGHTING PLAN
DRAWN BY. C.L.F; DRAWING NI!MBER
DESIGN BY A 1405 - 2
WORM
Aviv %