Loading...
HomeMy WebLinkAbout1787.071' 0" 1 /' N g/ O/" �'- �" l'O`" 1'O" C Meosured at � Pier and normol to t Bridge) �I (710491l4" - IS G 31 @ l2" _ l4' O"CTOP) Co" 0 Q L `O 9/`49'14" N — Pier `a Sta. 9+55 m ¢ Bridge /5l l 3p @ l2" _ /4'- O"(Bolt) PLAN Column B notshown Detol'/s symrnetrico/ about (� 6ridge �t Column A l"Premolded Jt FillerTYP.)� I I Elev. 31.93 tn� - -- - - - _ - 25 36 I (Typ. Each Co/umn) C O---�-- - I C Typ. Each Column) JC M DRAWN 37. Vu- S-Ss 0 ° Q v CHECKED ° N R1 4- PROJ. ENGR. v v DIST. ADM.. :j"� — DOT FORM 221-011 DATE A Elev. 24.71 Column /3'-O" 22 Eq. Spa. 0 obt1-0 ._Co 326 3 34 34 wi th Co"Min. Sp/ice 0 Pter Me :< Lo I I i �4 42 .¢ 43 Column �4 Cat Top37 '5' 35 #5(3ro - I� 2 O" � /, ", I Min. Spli c p. CAlternote Splices) TYPICAL COLUMN SECTION � Bridge � 32 m Cur- 3 //O E.F. C Column B to clear Blockout E r ar each Column _ � El e v. 35.2 I _ N i I �� N Q Elev.31.53 .O -1 i 50 (Typ. Each Column) - Lowe r Cross b eam Elev 24.75 I 40 ��� I I ' l3 # JO 38 1 /in ge Bars l O'= l2 O I Co" I CTyp. Eoch Column) I I -�IL I4-4 " 39 "� "" n 4� l-6 Cis l6 -4� @ lI -O = l5 -O End 'vll�O FRONT ELEVATION Shown Looking Ahead on Stationing Elevotions are shown 07' q, of Pier RTOTAL EGION N STATE FED. AID PROJ. NO. SNOT SHEETS 10 WASH BRM -1157 (1) JOB NUMBER 86 W 002 CONTRACT NO. REVISION BY APP'D HIGHWAY DIVISION �f8p®®Af I Feb. 28, 1986 APPROVED Face of Column — Ver/. Bar - Horiz. Bar - -- Tie Bor C 94 34 ) Tie each end oFsplice wwith wire Co"Min. splice) 1.350 Bend with 10"Toil hooke& oround horiz . and ver7: bors. TIE BAR DETAIL �I O Q Q n 0 j \ l0 O k9 O mm m �51 06 V LOC cv m ao Elev. /0.50 ob cU m � . O 0 LO MIF N elev. 13.50 0 O - N �' o Elev. �► Washington State TrAf Department of Transportation ENTRANCO ENGINEERS, INC. BELLEVUE, WA EVERETT, WA t- Pier l'O" l=0' Column /'C" G" Troi/ (Beyond) of 2 I O - F7- Gobions / 2"C/r. (TYP.) �Q 40 0, W �Top of Column Column Pedes7bl #4 Pedest o/ � (Beyond) o Elev. 18.50 Eq. Sp o. SECTION A Pier ra ►ram t- S trip it Sht 30) singe Bor ,t 28 not shown See Sheep 25 For Pile ReinF• Detail and Pile Locorions CITY OF • WELLS AVE. BRIDGE REPLACEMENT BRIDGE BRIDGE SHEET 4 9HFF; 27 OF 35 SHEETS a-/� Revised 9/82