Loading...
HomeMy WebLinkAbout1787.10* Cut l'#(0 76D and l#CO23 ,Move back /�/l 78 cut 2 #5 coo 2 *4 g4 at each Access Door n ear Pierl. cut- l '��0 73 , l '`k 77 , 2 #S �4 , 2 #4*01 and /,(a 83 ateoch Access Door near Pier 2. 20Qc 3 Opa3 �� Each si de 7i2 I4 S4 --rOp 20 _�� a n Side 73/4� J.`= �- 3 eQsLir d,d9e along �a 3 Sets °F fi IVebs) N CTyp 0 EX o" x 8�- _ q9 TOP 8 p ocs>* Acce //n����, CryP@ 4 , O''and Q ) I 0qq TOP X �'- O" �L o L! 204 god'` oars) n�mD #-5 7 AcceSSD ,b I cryP 0„ 4 04C86 O u = IO3 - 0#4 87 Top Each Side S aces @ 2 1- _— 103 P4 8ro Top Each Side ZD Side Top s of 24 c 9�'8 93 C. sets Sets OF, �„ Sp/ice For Boys) TyP prs £` 2= 7'r-Splice For ° eCoB Inside Edges OF 801tom Slob strut- Typ)�� ° -_ — Top Each Side co Spa. @ 9„ /'Oil=ro' 0„ „ CD - 9 3 Sets of a O o 95 II 0 <t Pie, El I I' D7e- .0 3_O,rn s0414, 0r 11 7 2 —9 5.O'd 1/- 1/4 EndN � 7 ° End C7qD N O Min. Splice 5in nSplicSplice v Min•773 � I III t � \ 00 o O i W U � v S Lice 0 # 0 t1in• P ��-------------- O m u �— # # I ;00p W I =l��e G2 Spa. @G"_ 31� O" ---- 9'-� I -3„ W W # Spll " Co3 chSide 24 CrD4C3ott Eoch Side _ O I� it II I� 7'"5 905 7*5 �9 70 Cog 22 Spo. @ Co 11 / o'1 ❑ ❑ 5 �g O I Recessed Lighting Fixture CTIP .) �5 �5 ❑ ❑��. 45 #_5 Cos #S , 4 #5 67 , 45 �8 Bolt Each " �05-0 I 20'x5 Bo Eo \ ,\ �g 0 (48 Spa. C- Co "- 24'- O # 0 # Qo I Cps S ° ch S�d�- 1 9/ , ' ) ap , 5 �02 got Eo --- - 25 Sets of /0 4 @ l- o <Sfirr Each Side �20 - --- - - _ _ 0 10" "- 3-0 v r Q) # I ✓' �1 Bob Eoch..5i� /03 S aces @ /- O - v� l9 � �_ #�� -�` i5O " ,.. Co 13 . a .:9 r, 2co.=�Eoch 5'd BOTTOM SLAB PLAN 4 Exterior Web 2'q�4 I-35 (ODB - For Drain Hole Location and Detail, see Sheer 29. % O 2° Use jl 4'�x %2" Pour Strip 4P OF 3 aGn 3 - when pouring boltom e 3 5 i / -_ _ I 4 sets s�ir�)E Bridge Top of slab . Remove beFore 4, 0„ 1r4,1 ¢ Bridge 7„ Measure d along ¢ Bridge //8 5 �TEJ or 12.3 5 /20 or /2J (Turn Hook down) --Cons t Joint 15 #5 qo C Bottom Slob :�.d pouring web C ryp. 4 N 3 O locations) °4.1 4 Jot 4" 8" 20 Spaces @ I'-O'� = ZO'-O" �2 Spaces 04" = 20� 8" 4 ll7" Top _. �__.. i i i i x q JOCo Rnt i 4 /12 Tr,n lot 5 94 CTyp)- 4 84 thru 88 (Typ.) 83 (ryp.) �-� D7Coor 'qr/ / 7S � i �r•r•�—��— � I � _,J � ,et// 78 or #ll 79 110 L ►fi--- - 40 Spaces @ obt S"= li 7" AT MIDSPAN �7 0 QQ W o m DRAWN S.T Uu-- g- Ss o Q o CHECKED 10477, a 4.,PROJ. ENGR. v DIST. ADM.. V 00 � � DOT FORM 221-011 Revised 9/82 Strip Detail this Sheet NEAR PIER 2 CryP) � n Const. Joins" iv/ Roughened SurFoce (Typ) 1 I� '_L*5 9 Cryp.) Maio 5 90 ( ryp. ) # 5 Cq4) cv yp xr 73 eoll Cspaced w/ �*/l 72 ) # 77 Batt (Spaced r CROSS SECTION THRU SPAN 1 REGION TOTAL STATE FED. AID PROJ. NO. SHEET SHEETS HIGHWAY DIVISION . Al c 10 WASH BRM-1157 (1) JOB NUMBER 86 W 002 CONTRACT NO. Fen, 2_8,JJ$r0 DATE REVISION BY APP'D APPROVED POUR STRIP DETAIL ( Span l only) 4 /02 U a �� �� / 7 Spoces IS, l O" = l7 O" Div SECTION A Bred e See Top Slab ShP. 31 For — 9 Longi t Slob steel and Stirrups not shown See Cross Sec rion at Sp on / near Pier 2 this Sheet For / \ ` Longitudinal Top 81 notsholi NIV S G S Recessed Lighting / Fix Lure CryP.) /%" rD Spaces @ obt 2' I ky-- l2" co/2r, _ --- --- CROSS SECTION THRU SPAN 2 Adw Washington State Department of Transportation ENTRANCO ENGINEERS, INC. BELLEVUE, WA EVERETT, WA l 8%2' 2 ONAL��' CITY F REND T y WELLS ,VET ,. BRIDGE REPLACEME;NT BRIDGE BRIDGE SHEET 7 SHEET 30 OF 35 SHEETS rq !�7.5-7