Loading...
HomeMy WebLinkAbout1787.13� V 0 Q z�m0 � m U 2/'- 7ka 20 `- Co %4" lrD'- 75/8„ l 7 L O k4" l2 7%g" 2 l0 ,. 2 � lO 12 L 7 5/8 I (Pavement Seat) ( Pavement Seot) d' tz v l'�r2' /��jz' l'0 Dio. Blockout For Future Utilities. n 6i �t- 2 - O Dio. Ho% for !d/a%r LinLined w/ Paper Bond � U iyp. (See Note A) Breaker ondFilled d d I A iv/ Concrete 6"Min. -hick ess C rY ) 0 # 4 /49 ( Typ.) P (D 4t4 /4 I o v N l '*4 147 0 I I I See Sheet 23 For- 2" r W #4 I52 At- C? 53 (See Sheet 28 )- iSpo.@ q46 :2'43/' l l' Co"Dia. Blockout For Future Llt1'1,F'ties. Lined iv/ Paper Bond Breaker on d Filled w/ concrete G"Min. Thickn ess (Typ.) Grout -Pod and Beoring _Detoi l C Typ.) 13 #4 /��@ l'O"= /210'r 3, Ike" 13Spa. @ 1=o"= 13' 0` 2/'- 0 ►, 2-8 38 Sets of 2'0- 4 2-0 Min. splice 13 #,g 014q@ l =O" = /2' 0" 13 Spa. @ l ' O 13' 0" PIER I ELEVATION Looking Aheod on Stotioning and Normal to < Pier Slab ReinF. notshown For clorl•ty Dimensions shown ore measured at back oFpovemenrseat Note A: lnstoll synthetic closed cell sponge rubber in opening between waterline and opening in diophrogm. Cement - sponge rubber to concrete surface. (Pavement Seot ) B Bridge 2 , Co /, C„ ¢r /' 9"Dia. Hole For WoterLine -- Typ. (See Note A ) r _I I i 3'/e" Future lie"Aspholt C L v Overloy -� NV I Qj U W \i Jk N 0 N IWO O N 0 v N q-' Pier / 2" 3Spo.@O" 2" '`#6 _- Top Slab ReinF. 04 /g9 I (See Sheet 3/ � Approach Slob w/ "Asphalt Overlay 4 /484 l44 (See Detai / o� I —*4 or#4 l4 7 f ten% I tn N *4 l42 --- Sotfom Slob ReinF - I (See Sheet 3o ) I I / "x co" Premolded Joint ! Filler (Ful/ Length)----��i I /" Expanded Polyslgene I /0, /o°' over entire urea between diophrogm and pier wall St iWoter Line #S Transv. @ /'O" #S Longit. @ /O" LE) 10 � Q Co" 4" \_'8 L ongi"t, @ /O" ( Full Length, Stroight jvl Std. Hook ot- Pavement Seat) DETAIL D Top bars sholl be epoxy-coored 12 Pier 3 Top Slob ReinF. (See Sheet 3/ ) a I — aD 5---rrrr -+-T-s �; • I OU See ,Detai I D i /Sl I (Sp/l*ced W 8611`om Slob Bors 5 GS ) I� I I I /`9"Dia. Hole For Water Line Slob ReinF. (See Sheets 30 � 3/ ) O 48154o#8/SS #8 /53 SECTION A St- Pi er 3 3 Spa. 5" 2� 0„ #4 152 #4 156 �*4 l49 a °5 Approach Slob Iv/ Ike"Aspholt Overlay \I l" Thick Premolded Joint Filler C Full Length) DOT FORM 221-011 Revised 9/82 /7 7