Loading...
HomeMy WebLinkAbout1787.14O v a a � � ro o `, c v j0 m 0 �1 m o� v a a ,v See Section D Sheet 26 -- o � .OQ p <`� 12 ore I a 0 e IK Per- I�Sid5OF5 ed��rl I „Join fid Ed9eP). Filler For rIVeen Slab E�'dU fiLjred jo;s �e,�c I %2��jo, obd Pd�p on A-2> 5 emo Qfili of I� Brid9(See st II ® I Typ. FOF o I ate panel c U I g+3 �m I �N 1'yPe B PcJ CURB HEIGHT TRANSITION LOCATION 9" CURB TO Co" CURB S.IV. Corner IV. IV. Corner 8+56.ro4. (Li:) 8+50.88 (Lt.) 9+ G 1. 8 0 (L-r) 9+ 67. 5Co (Lt. N.E. Corner 9 +G7. 3 / (_Rt) 9+ 73. 57 (Pt) S.E. Corner 8+4-4.99(Rt) J8+38.73 (Rt) Barrier Panel � Ror linr� Rae �' Panels @ �'-o" _ Railing Type _ TYPeB II .__ _ B orrjer an Sidelvalk Ca'-G" Conc_ Jc,in1 n ODI I II pommy o' N� II I I I I PT. 9 f 4/. 08 I I i I I I 10 9J I ¢Bridge and Ro°dWay � I I -----See Section at Barrier on laoll Sheet- - d 2O Rarlr.ng Type A panels C-_—G'-0„ il ConcQarr►er afis i , s'dervarlk C -O L)urnrny join SIDEWALK, BARRIER, AND RAILING TYPE A LAYOUT For Railing Type 8 and C Layout-, See Shee7` 23 Barrier Panel -.---Poured Rubber Sidewalk I I Joint Filler I I m � II � II Barrier II� Panel and II Ror'ling I Type e I -/"x 3/4"x 3„ Premoldecl _loin/ 45/8,( i I Filler. Use Cement Style Lubricant to Ins to /I Roiling Type R S Top of Conc. Borri Top of Side►vo/k- C ee Sheer 23 ) it Ped• Rail and SECTION AT OPEN JOINT 5„ Bolusler IN BARRIER PANEL ,4"ChomFer 4'e ,2 0.D Std. Pipe O„ p ; 0 a p. � V , I -Rai ling Type A o _ rSee Detai/s ttw - ---- �•(�^ " Sheet-) v/ v' li it 3/4"ChomFer f, 0 ,r4 /�9 #@ l/D"CTyp.) II CTYP') /2 St(3. 845/ to 9+67 (Left) i - } St -a. 5+39 to 91- 73- 4 l70 @ l'- O" 9 Anchor Bolt v P) i� p M C Typ.) 4 "Dia. PVC a s: �} 0 I Conduit__ Top boF N = p 00 LQ / \ _Q CD'IC r n CTyp.) 4 " Pe d. Rai l I 'A I� fPosr- W6xk5CMadr'Fied) /or Equivalent LL-il �'4"A-325 Bolt I+ Doweled ro Min. \N „ 5/8-Square into Barrier Ponel ( For Bolus ter—�� Rot tiny Type A End Post TroFFic Connection) Roils - l "Dia. Ho/e-1 TyP CFnd CIaSS AX O /4n Conc. Top slob � a I I- C/ass 6 Steel � Conc. �1 °a' 4 /lo� CS. Iv Corner) N J (!�o C LeFt) �. ►. , � �:,��.r. ,� 4 /Cn6 (NI✓ Corner) .p ;P� g l�l CRi ht)OF • N _ O I O „ 4 /67 CN•E Corner, * 'G& CS. E. Corner) indicetes number end length of bars I - — Class AX �� to be determined b the Con for #4 / 4 e l'-O''(T �" Conc. u r _ _ _ a#� /G2 CS. IN e N.IW. y yP)! �� @ /- O c Typ.i Corners) From the plons ( 2'-o"min. sp/ice) or G /Co3 (N.E. e S.E. Corners) I I I 3„ I 3„ @/- 0 C Typ.) 314',HalF Round Drip Groove SECTION THRU SIDEWALK AND CONCRETE BARRIER 3/4" HOIF Round Drip Groove SECTION THRU BARRIER PANEL "No " STATE FED. AID PROJ. NO. NO. , SHE DRAWN �.r. �Jlt_ 8-gs 10 WASH BRM -1157 (1) CHECKED P-14.7- //- Ss JOB NUMBER PROJ. ENGR. 86 W 002 DIST. ADM.. CONTRACT NO. DATE REVISION BY APP'D 3 /jam wwown rnou 971_n11 1 M 1, h'"W - Conc. Qarri er rA� O (Typ, Railing Type A Panel) — 1 "Dia. Ho/e C Typ. 2 o a o a-- o o In term. Pos r Cyp.) O � 9" 10 -- 5/BMSquare Bars @ Co'l= 41 6" C Balusters r__% 1 1 11 I V r--% L. 1 1-n 1 11 L. L. (,4 Roil and I Baluster I „ O-,2 I �2"C).D l Std. Pipe Q j%8 --- %2x SECTIONS THRU RAILING TYPE A HIGHWAY DIVISION Feb. 2811886 APPROVED Ho/essper- End Post` For Connection to Conc. l3Qrrier) I �LJ L, 'J 4 B lnterm. Post- - End Post` W rDx /5 CModiFred) MC rox /6.3 CMOdiFt'ed) PLAN or Equi volent or Equivo/en1- i -rroFFi c Roils not, shown L Conc. Barrier 6orrier Pone/ 9 YA � Railing TYpeB.. Ror /r'n T e A _ 5 Min. End Ponel Max.,, (See Detoils I ' Sheet 23) Top of Barrier Panel I I -J 3 a /4 A325 Bolt -� Doweled ro"Min. into Sorrier Pane l (2 per End Post) Anchor 8o/t J1 (2perE-ndPost---_-_-_-_ 4 per In term. Post) AT END PANEL_ ELEVATION Angle vories depending on roi/ /oco7`i0n lnterm. Post: -------- - ---__ ---I_4x3x 5/I6 4rr - d StruCturol Tubing I % Dia. Ho/e L Channel SECTION C SECTION E Square AJ — 5/8 x 2 "Bu r/-on — �14 -° Head So/t ail Hex Nut and Cut Wosher each side lnterm. CTyp. For Structural Tubing Connection 7`o Post,) I1 /4�f ----------'/------- Cox 3x%4 r--- ---� ' � Structural Tubing - I I j L 3, 2 x 2'r2'x 11 l%� Dio. dole 4 O O [---j L Structurc7l Tubing l'D/a Hole M O � .�� C Typ. 4Ho/es �J a per lnterm. Post- For u Connection to !— W Co x /5 Conc. (3orrier) / CModiFied)-- Typ Be-) th �TYP I) co„ Ends of Post / - 4 SECTION D SECTION F 111,:J_ �Z� Aim Washington State TrAf Department of Transportation 19 EWRANCO ENGINEERS, INC. BELLEVUE, WA EVERETT, WA + BRIDGE /71f 7 SHEET CITY OF RENTON I I WELLS AVE. BRIDGE REPLACEMENT SHEET 34 OF BRIDGE 35 SHEETS Revised 9/82