1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER.
2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED
ON THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING
CONSTRUCTION.
3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED
AND IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO
INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE
SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION
IS COMPLETED AND POTENTIAL FOR ON- SITE EROSION HAS PASSED. THE
IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO
EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE
PERMITTEE.
4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING
ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE
CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
CONDITIONS DICTATE, THE PERMITTEE SHALL ANTICIPATE THAT MORE EROSION AND
SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE
SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF
CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS
ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND WATER
QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
5. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES
NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION
OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
6. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT
DISTURBED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT
UNWORKED FOR MORE THAN TWELVE (12) HOURS, SHALL BE COVERED BY MULCH,
SODDING, OR PLASTIC COVERING.
7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER
WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE, ALL DISTURBED AREAS
MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER
APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN
QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS
OF APRIL THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED, HOWEVER,
WHENEVER IT IS IN THE INTEREST OF THE PERMITTEE, BUT MUST BE AUGMENTED
WITH MULCHING, NETTING, OR OTHER TREATMENT APPROVED BY THE CITY OF
RENTON, OUTSIDE THE SPECIFIED TIME PERIOD.
8. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE
DEPTH EXCEEDS 6 INCHES, A FENCE, A MINIMUM OF 3 FEET HIGH IS REQUIRED,
WITH 3:1 SIDE SLOPES.
9. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 24' X 50' X 8" OF 4- TO 6-
INCH QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS
AND EGRESS TO THE CONSTRUCTION SITE.
PLASTIC COVERING:
1. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL MEET
THE REQUIREMENTS OF THE STATE STANDARD SPECIFICATIONS SECTION 9-14.5.
COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING
2. SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL
DIRECTIONS. ALL SEAMS SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH AND
THERE SHALL BE A LEAST A 12 INCH OVERLAP OF ALL SEAMS.
CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED
3. BETWEEN NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY
ESTABLISHED.
WHEN THE COVERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN PLACE
4. UNTIL THE NEXT SEEDING PERIOD.
PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES IN
5.01RDER TO PREVENT SURFACE WATER FLOW BENEATH SHEETS.
PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED ENDS.
6.
MULCHING:
1. MULCH MATERIALS USED SHALL BE HAY OR STRAY AND SHALL BE APPLIED AT
THE RATE OF 75 TO 100 LBS PER 1000 SQ FT ® 2 INCHES THICK.
2. MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER THAN
2:1.
3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH
CANNOT BE SEEDED BECAUSE OF THE SEASON.
4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1.
American
Engineering
Corporation
Engineers Planners Surveyors
4032 148th Ave. N.E.
Redmond, WA 98052
PHONE (425) 881-7430 Fax (425) 881-7731
N 0 z File path & Name
P:\2003\0312\Engineering\Dwq\E0312ESNDl.dwq 9/29/2005 3:012 / PM PDT
SECTION 15, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
PROTECT INLET5 DURIMG
SEEDING:
CON5TRUCTION. K.EE P 5EC31-
MENT OUT OFT14E SWRM
DRAINAGE SYSTEM. 115E WAlF-
1. SEED MIXTURE SHALL BE PER TABLE 8.4, AND SHALL BE APPLIED AT THE RATE OF
CIRCLE f3EUIMD CURD INLET5
120 LBS PER ACRE.
OuRwG STREET COIJSTRUCTIOM.
MODiP`( PROTECTION AS CON-
2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION
5TI2UGTIom PwGk_=SSES.
AND OTHER MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT
STRUCTURE.
CJRCttl11R SUAPE i51JOT E5SENTIAL-
VA12Y SWAPS TOFfT ORANJACAE AREA
3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF THE
AND TE2P44M. 015SEWE ID CIJEGICTRAP EFfIUENCY AND MODIFY AS
SEED BED WILL BE NECESSARY. (E.G., GEOTEXTILES, JUTE MAT, CLEAR PLASTIC
NECE55ARY TO IN5UQI! WISFACTORY
COVERING).
TIZAPPINC-a OF5IDIMENT, CAM BEE.
'15011�WgZb
ADAPTED INLET.
4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS
FflAnrlE GOVE MIIJIMUM DEPTii_I
GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS AND
SEDIMENT BASINS
I19LTEP- FAWfC MAXIMUM DEPTU-2'
--- F
5. THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE
ROUGHENING. PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE
SLOPE.
6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIER'S RECOMMENDATIONS.
AMOUNTS USED SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES
AND WETLANDS.
SEED MIXTURE
1. SEED SHALL NOT BE USED IN AREAS SUBJECT TO CONSTRUCTION TRAFFIC.
2. CHANNELS AND BIOFILTERS HAVE SEPARATE CRITERIA FOR VEGETATIVE ARMORING.
THIS PRACTICE MY BE APPLIED IN ALL AREAS OF 5% OR LESS SLOPES AND IN
3. STEEPER AREAS (UP TO 10% SLOPES) FOR A MAXIMUM HORIZONTAL DISTANCE OF
100 FEET. USE MULCH OR NETTING OR OTHER TREATMENTS FOR STEEPER AND
LONGER SLOPES.
NAME
PROPORTION
BY WEIGHT
PERCENT
PURITY
PERCENT
GERMINATION
REDTOP AGROSTIS ALBA
10%
92
90
ANNUAL RYE LOLIUM MULTIFLORUM
40%
98
90
CHEWING FESCUE
40%
97
80
(FESTUCA RUBRA COMMUTATA)
(JAMESTOWN, BANNER, SHODOW OR KOKET)
WHITE DUTCH CLOVER (TRIFOLIUM REOPENS)
10%
1 96
90
TOPSOIL THAT WILL BE TEMPORARILY STOCKPILED:
1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED
DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31.
2.IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED.
TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN
3. THE SUBGRADE IS EXCESSIVELY WET, OR WHEN CONDITIONS EXIST THAT MAY
OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR
SEEDING.
PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE
4. MAINTAINED ACCORDING TO THE APPROVED PLAN.
MAX. -
5LAPE 1:1
CLM OUr MEN MEktr 15
W MLOW GRATE,
5E.CTION LEAVE OUT 15LOGK TEMPOPMLY
WSEItr TILE Wliti hmzF-- 50ZEE1.1
AND C, 9AW-L T7 T1EIZ... Kfr:P F :C _
DWAiERED.
CATCH BASIN/INLET/
SEDIMENTATION TRAP - TYPE C
N.T.S
2:1 SLOPES
j A B 2"-4" ROCK
Apo
L
oQa
��► -1 I i I I I� � fi 1-111-11-
-�I=^-
L = THE DISTANCE SUCH THAT POINTS ! I (I
A AND B ARE OF EQUAL ELEVATION i =1
ROCK MUST COMPLETELY COVER THE
BOTTOM AND SIDES OF THE DITCH
FILTER FABRIC MATERIAL 60" WIDE ROLLS.
USE STAPLES OR WIRE RINGS TO ATTACH
FABRIC TO WIRE.
2" BY 2" 14 GA. WIRE FABRIC
OR EQUIV.
FILTER FABRIC
MATERIAL "
6
2"BY2"BY14GA.
2' -0"
WIRE FABRIC OF
EQUIV. 2�_0"
5' -0"
PROVIDE 3/4"
- 1.5" WASHED
5' 0"
BURY BOTTOM OF
GRAVEL BACKFILL IN TRENCH
1 "
2'- 6" FABRIC MATERIAL
AND ON BOTH
SIDES OF FILTER
_-6' MAX IN 8" BY 12"
FENCE FABRIC
ON THE
g" MIN.
TRENCH
SURFACE.
2" BY 4" WOOD POST
ALT: STEEL
FENCE POSTS.
RECOMMENDED FOR APPROVAL
BY: DATE:
BY: DATE:
! BY: / AJ A
-.� DATE:
i
BY.' .� '� DATE: /p, 4I-105-
NOTES:
1. FOR SHEET RUNOFF OR FOLLOWING DISCHARGE FROM A SEDIMENT TRAP OR POND.
2. MAXIMUM SLOPE STEEPNESS PERPENDICULAR TO FENCE LINE IS 1:1.
3. MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE OF 100 FT.
4. IF 50% OR LESS OF THE SOIL, BY WEIGHT, IS FINE PARTICLES SMALLER THAN THE
U.S. STANDARD SIEVE NO. 200, THE EOS SHOULD BE EQUAL TO OR SMALLER
THAN THE SIEVE SIZE THAT 85% OF THE SOIL CAN PASS THROUGH.
5. THE TRENCH SHALL BE BACKFILLED WITH 3/4" MINIMUM DIAMETER WASHED
GRAVEL.
6. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR
USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY
STABILIZED.
7. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL
AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS SHALL BE
MADE IMMEDIATELY.
NSA
FILTER FABRIC FENCE DETAIL
STANDARD DWG. NO. BR21
N.T.S
32�0
EXISTING
GROUND
15' MIP
EXISTING GROUND
>_ ~
�00Li
Ld
�
R/N/ wmWw
> w 0 >
Fr:DoQ
12" 00wf)-
Lni.J invv vv v�rr� e
RAMP OR SITE ACCESS
ROAD
♦i� �f
N 10
1. USE 4" TO 8" QUARRY SPALLS OR CRUSHED ROCK FOR
SURFACING AS SHOWN, MATERIAL WITH 'FINES' IS NOT
ACCEPTABLE.
100' MINIMUM LENGTH SHALL BE LENGTHENED AS
2. THE
NECESSARY TO INSURE MATERIAL IS NOT TRACKED INTO THE
PUBLIC RIGHT-OF-WAY.
•�-. ■14 .
l,`l I •
SEE ROAD & STORM PLANS
FOR MAX. SLOPE
l' V
SUBGRADE
2.0%
71
1' MIN.
DEPTH
TOE OF CUT ALONG ROAD
TEMPORARY INTERCEPTOR SWALE DETAIL
N.T.S
SURFACE AREA DETERMINED
AT TOP OF WEIR
EL. 403.0 1' MIN.
,L 3.5'- 5'
�y 1.5' MIN.
+ 1 FLAT BOTTOM EL. 399.0
NOTE: TRAP MAY BE FORMED BY BERM OR BY
PARTIAL OR COMPLETE EXCAVATION
CROSS-SECTION
4' MIN.
EL. 404.0
1' MIN. OVERFLOW
c� 1 MIN_
3/4"-1.5" 2"-4" ROCK RIPRAP
WASHED GRAVEL
GEOTEXTILE
DISCHARGE TO STABILIZED
CONVEYANCE, OUTLET OR
LEVEL SPREADER
•
err=ter-r ��-r�rTr�_i i i i v
GEOTEXTILE I _ _I I (-� �I' WASHED GRAVEL ZONAL
EXPIRES O4-05-200$.
TRAP OUTLET
TESC NOTES & DETAILS