Loading...
HomeMy WebLinkAbout54290.01.2TRA _ .... RELOCATE TAXIWAY LIGHTS, SEE SHEET E-2 GRAPHIC SCALE 20o 0 100 200 ,00 L_............... ._.... .__a i L-881 PAPI (OR EQUAL) SEE SHEET E-1 REMOVE VASI SYSTEM, SEE SHEET E-1 ( IN FEET ) 1 inch = 200 !t eoo .._.............. ....... w REPLACE ROTATING BEACON, SEE SPECS RUNWAY SAFETY AREA ..............7 L-881 PAPI (OR EQUAL) SEE SHEET E-1 Architecture Engineering Planning Interiors 215 Columbia Seattle , WA 98104-1551 (206) 682-1133 FAX 621-8782 1- EXPIRES 12/5/43 RENTON MUNICIPAL AIRPORT LIGHTING AND NAVAID IMPROVEMENTS A.I.P. # 3-53-0055-06 - - - AS BUILT ........_�_..._...� � ,_ �- _ Date 418193 By J. MARTIN r - --"--- REMOVE EXISTING VAST, SEE SHEET E-1 GENERAL NOTES: 1) THE CONTRACTOR SHALL COORDINATE HIS CONSTRUCTION ACTIVITY SO AS NOT TO IMPEDE AIRPORT OPERATIONS OR SAFETY. THE FAA CONTROL TOWER SHALL HAVE FINAL APPROVAL ON AIRPORT SAFETY MATTERS. 2) CONTRACTOR SHALL PROVIDE 48—HOURS ADVANCE WRITTEN NOTICE TO THE ENGINEER PRIOR TO WORK WITHIN THE SAFETY AREA. THE CONTRACTOR SHALL COMPLETE ALL WORK WITHIN THE SAFETY AREA WITHIN THREE WEEKS OF THE START OF SAID WORK. 3) ALL TRUCKS AND CONSTRUCTION EQUIPMENT SHALL BE EQUIPPED WITH AIRCRAFT RADIOS AND AMBER FLASHING LIGHTS. 4) THE RUNWAY SHALL BE CLOSED TO ALL AIRCRAFT OVER 12,500 LBS. AND WINGSPANS OVER 49 FEET DURING WORK WITHIN THE SAFETY AREA. 5) ALL MEN, VEHICLES AND NON —FRANGIBLE EQUIPMENT MUST BE MOVED OUT OF THE SAFETY AREA DURING TAKEOFF AND LANDING OPERATIONS BY BOEING JETS. THE FAA CONTROL TOWER SHALL PROVIDE THE CONTRACTOR WITH 30 MINUTES NOTICE OF SAID OPERATIONS. 6) NO CONSTRUCTION PERSONNEL, VEHICLES OR EQUIPMENT SHALL BE ALLOWED TO CROSS THE RUNWAY OR TO PASS IN FRONT OF A TAXIING AIRCRAFT. 7) THE CONTRACTOR SHALL ACCESS THE AIRPORT THROUGH A ROUTE DESIGNATED BY THE ENGINEER. STORAGE OF EQUIPMENT AND/OR SUPPLIES SHALL BE IN THE AREA DESIGNATED BY THE ENGINEER. 8) THE VASI UNITS SHALL REMAIN IN SERVICE UNTIL THE REPLACEMENT PAPI UNITS ARE INSTALLED. A 24 HOUR SHUTDOWN OF THE VASI UNITS SHALL BE PERMITTED. THE CONTRACTOR SHALL PROVIDE THE ENGINEER 48—HOURS ADVANCE WRITTEN NOTICE OF SAID SHUTDOWN. 9) THE CONTRACTOR SHALL NOT ALLOW ANY DEBRIS TO ENTER THE AIRCRAFT APRON, TAXIWAYS OR RUNWAY OR TO CAUSE FOREIGN OBJECT DAMAGE (FOD). 10) THE CONTRACTOR SHALL, AT THE END OF WORK EACH DAY, SWEEP THE AREA OF ANY LOOSE DEBRIS, CLEARLY MARK ANY OBSTRUCTIONS, EQUIPMENT, EXCAVATIONS AND ANY SAFETY HAZARD. CONSTRUCTION NOTES: 1) ALL EXCAVATED AND REMOVED MATERIALS SHALL BE HAULED OFF SITE AND DISPOSED OF IN ACCORDANCE WITH CURRENT ENVIRONMENTAL REGULATIONS. THE HAULING AND DISPOSAL OF MATERIALS SHALL BE INCIDENTAL TO OTHER BID ITEMS. I No. Date By Revision CONSTRUCTION SITE PLAN Sheet No. C 1 Project No. 54290.01 Date 4/1 /1992 Drawn R.C.E. Checked J.J.M. Scale 1' =200' Binding Order