RELOCATE TAXIWAY LIGHTS, SEE SHEET E-2
GRAPHIC SCALE
20o 0 100 200 ,00
L_............... ._.... .__a i
L-881 PAPI (OR EQUAL)
SEE SHEET E-1
REMOVE VASI SYSTEM, SEE SHEET E-1
( IN FEET )
1 inch = 200 !t
eoo
.._.............. .......
w
REPLACE ROTATING BEACON, SEE SPECS
RUNWAY SAFETY AREA
..............7
L-881 PAPI (OR EQUAL)
SEE SHEET E-1
Architecture
Engineering
Planning
Interiors
215 Columbia
Seattle , WA
98104-1551
(206) 682-1133
FAX 621-8782
1- EXPIRES 12/5/43
RENTON
MUNICIPAL
AIRPORT
LIGHTING AND NAVAID
IMPROVEMENTS
A.I.P. # 3-53-0055-06
- - - AS BUILT
........_�_..._...� � ,_ �- _ Date 418193 By J. MARTIN
r - --"--- REMOVE EXISTING VAST, SEE SHEET E-1
GENERAL NOTES:
1) THE CONTRACTOR SHALL COORDINATE HIS CONSTRUCTION ACTIVITY SO
AS NOT TO IMPEDE AIRPORT OPERATIONS OR SAFETY. THE FAA CONTROL
TOWER SHALL HAVE FINAL APPROVAL ON AIRPORT SAFETY MATTERS.
2) CONTRACTOR SHALL PROVIDE 48—HOURS ADVANCE WRITTEN NOTICE TO
THE ENGINEER PRIOR TO WORK WITHIN THE SAFETY AREA. THE CONTRACTOR
SHALL COMPLETE ALL WORK WITHIN THE SAFETY AREA WITHIN THREE WEEKS
OF THE START OF SAID WORK.
3) ALL TRUCKS AND CONSTRUCTION EQUIPMENT SHALL BE EQUIPPED WITH
AIRCRAFT RADIOS AND AMBER FLASHING LIGHTS.
4) THE RUNWAY SHALL BE CLOSED TO ALL AIRCRAFT OVER 12,500 LBS. AND
WINGSPANS OVER 49 FEET DURING WORK WITHIN THE SAFETY AREA.
5) ALL MEN, VEHICLES AND NON —FRANGIBLE EQUIPMENT MUST BE MOVED OUT
OF THE SAFETY AREA DURING TAKEOFF AND LANDING OPERATIONS BY BOEING
JETS. THE FAA CONTROL TOWER SHALL PROVIDE THE CONTRACTOR WITH 30
MINUTES NOTICE OF SAID OPERATIONS.
6) NO CONSTRUCTION PERSONNEL, VEHICLES OR EQUIPMENT SHALL BE
ALLOWED TO CROSS THE RUNWAY OR TO PASS IN FRONT OF A TAXIING AIRCRAFT.
7) THE CONTRACTOR SHALL ACCESS THE AIRPORT THROUGH A ROUTE DESIGNATED
BY THE ENGINEER. STORAGE OF EQUIPMENT AND/OR SUPPLIES SHALL BE IN
THE AREA DESIGNATED BY THE ENGINEER.
8) THE VASI UNITS SHALL REMAIN IN SERVICE UNTIL THE REPLACEMENT PAPI
UNITS ARE INSTALLED. A 24 HOUR SHUTDOWN OF THE VASI UNITS SHALL BE
PERMITTED. THE CONTRACTOR SHALL PROVIDE THE ENGINEER 48—HOURS ADVANCE
WRITTEN NOTICE OF SAID SHUTDOWN.
9) THE CONTRACTOR SHALL NOT ALLOW ANY DEBRIS TO ENTER THE AIRCRAFT
APRON, TAXIWAYS OR RUNWAY OR TO CAUSE FOREIGN OBJECT DAMAGE (FOD).
10) THE CONTRACTOR SHALL, AT THE END OF WORK EACH DAY, SWEEP THE AREA
OF ANY LOOSE DEBRIS, CLEARLY MARK ANY OBSTRUCTIONS, EQUIPMENT,
EXCAVATIONS AND ANY SAFETY HAZARD.
CONSTRUCTION NOTES:
1) ALL EXCAVATED AND REMOVED MATERIALS SHALL BE HAULED OFF SITE
AND DISPOSED OF IN ACCORDANCE WITH CURRENT ENVIRONMENTAL REGULATIONS.
THE HAULING AND DISPOSAL OF MATERIALS SHALL BE INCIDENTAL TO
OTHER BID ITEMS.
I No. Date By Revision
CONSTRUCTION
SITE PLAN
Sheet No. C 1
Project No. 54290.01
Date 4/1 /1992
Drawn R.C.E. Checked J.J.M.