Loading...
HomeMy WebLinkAbout6-3-24.6_-- 3' 2" 91611 Min. with 4 Ft. Wet Well 1_ I 11 011 � 42 /2 Min.- S `011 Bubbler Line Guard 1'- 0" ( See Note 1.) Hinge ----1? '— 8 " Min. SETTING PLAN Air Ducts , rr-=— Manhole Sections Equivalent to 48" Dia. Sanitary Sewer Manhole Modified as Shown Bubbler Line- 3/4" Pipe to Wet We I I ----� „ 1 ENTRANCE TUBE 51 0' w - ------ Station Lifting Loops 1 -, 311 x 12"x 3 / Y" Anchor Plate 4 Ea. 3i4" Anchor Bolts & Buts 8Ea. Mete r Disconnect Switch � 1 —17 Lb. Magnesium Anode Pack One Installed Ea. Side (2 Furnished). M See Note 2& 3 7' -0" Max. 2311+IF 23.201 Mastic Sealer . 1 ; �' ;' . I%2"Entrance Conduit See Note 2813 ; a 3-0 3/8 x 3/4 X 3/4 Tee , - '.�" M J. (T .). _ �---r . Y P JL Isc g � Q L . Ine Loops -L_ routed 411 Dia. C. I. Pipe --- — Li uid r f G q Ladder ;{ 1/ IISum Clean i Sleeve 4 P i. �1 4 _ _ ing Want- � �, � � (TY p.) 8 Influent 0" Pump Disch. o _ Pipe - Mi n• 3/8 °` Ai r Piping Fluorescent Light B ubbler 1 E lev. 13.6 _ Bubbler o ' „' Control Compressors �P i p 1 11 + j • Pane 1 If; r — -- - ore o ran Inspect � '; - - Note - _ � T- ---- Chart ._. �' P --�_- -- t An Sum - ` _ 1_ I !f,Pump P 7 Oglql Y Sea 1 81-9 Line toej _ Blower Wet Well Wail , 5- 0Dehum o r` 7±. idif ier (2) Base Seams — 8 I 18.4 � / I ©� t. i e,. Suction n 11 _ r'� TYP. Concrete Grout I'-105/ "�� �j ��� �� =� I oil, ��� ^ Suction Line u`(Rod Under Station 6 ' ` r. j' �� r. ct� M� 1� k l Note M.J. tT ) �, See N e 2 Y P. d - -1� Sump Pump 311 ,6.7 - - (.V� TYPICAL. WET WELL ELEVATION Elevating Blocks (See Installation Instructions) See Note 2 CROSS SECTION) Concrete Foundation See Note 2 To Transformer Vault Notes '.— ________ I. Bubbler Line Guard (L--• 3" X 3" 2. See Engineer's Plans & Specifications for Details of Wet Well, Concrete Foundation, Grout Under Station and Electrical Service. 3. Service Pole, Disconnect Switch, & Meter to be Installed at Transformer Site Approx. 100` from Lift Station. Contractor to Coordinate with P S.P & L. & Park Contractor on Power Supply. 4" Suction 41t Discharge Valves 11 ommon )ischarge IB2 .Pumps n-e Specs. STATION PLAN SEWAGE LIFT STATION FOR LAKE WASHINGTON BEACH PARK a . MICROFILMEd