Loading...
HomeMy WebLinkAboutAirfield Pavement Management Plan.10AIRFIELD PAVEMENT MANAGEMENT PLAN BASED ON BASED ON FAA/AlP GRANT FAA/AIP GRANT AVAILABILITY AVAILABILITY TOTAL COSTS PAVEMENT ID AREA, SY 1994 - 1996 1997 - 1999 2000 - 2002 2003 - 2005 2006 - 2008 20 YEAR RUNWAY 119600 Seal cracks Seal cracks, Seal cracks AC overlay on AC Seal. cracks, Isolated patching pavement Isolated patching $2,869 $53,100 $17,220 $580,004 $53,100 $2,261,520 WEST RAMP 70000 Seal cracks Seal cracks Seal cracks Seal cracks Seal cracks AND $24,803 $20,138 $6,713 $20,138 $24,803 $387,632 TAXIWAY A TAXIWAY B 12100 Seal. cracks Seal cracks Seal cracks $3,540 $3,540 $3,540 $248,900 TAXIWAY C 1900. Seal cracks Seal cracks Seal cracks Isolated patches, Seal cracks Slurry seal $2,213 $2,213 $1,475 $1,445 $2,213 $25,089 TAXIWAY D 1000 Seal cracks Seal cracks Seal cracks Isolated patches, Seal cracks Slurry seal $825 $825 $550 $995 $825 $25,120 TAXIWAY E 1300 Seal cracks Seal cracks Seal. cracks Seal cracks Seal cracks $938 $938 $938 $938 $938 $25,015 TAXIWAY F 1200 Seal cracks Seal cracks Seal cracks Seal cracks Seal cracks $938 $938 $938 $938 $938 $30,063 TAXIWAY G 1300 Seal cracks Seal cracks Seal cracks $938 $938 $938 $17,113 Page Jac of _13 __