HomeMy WebLinkAboutAirfield Pavement Management Plan.10AIRFIELD PAVEMENT MANAGEMENT PLAN
BASED ON
BASED ON
FAA/AlP GRANT
FAA/AIP GRANT
AVAILABILITY
AVAILABILITY
TOTAL COSTS
PAVEMENT ID
AREA, SY
1994 - 1996
1997 - 1999
2000 - 2002
2003 - 2005
2006 - 2008
20 YEAR
RUNWAY
119600
Seal cracks
Seal cracks,
Seal cracks
AC overlay on AC
Seal. cracks,
Isolated patching
pavement
Isolated patching
$2,869
$53,100
$17,220
$580,004
$53,100
$2,261,520
WEST RAMP
70000
Seal cracks
Seal cracks
Seal cracks
Seal cracks
Seal cracks
AND
$24,803
$20,138
$6,713
$20,138
$24,803
$387,632
TAXIWAY A
TAXIWAY B
12100
Seal. cracks
Seal cracks
Seal cracks
$3,540
$3,540
$3,540
$248,900
TAXIWAY C
1900.
Seal cracks
Seal cracks
Seal cracks
Isolated patches,
Seal cracks
Slurry seal
$2,213
$2,213
$1,475
$1,445
$2,213
$25,089
TAXIWAY D
1000
Seal cracks
Seal cracks
Seal cracks
Isolated patches,
Seal cracks
Slurry seal
$825
$825
$550
$995
$825
$25,120
TAXIWAY E
1300
Seal cracks
Seal cracks
Seal. cracks
Seal cracks
Seal cracks
$938
$938
$938
$938
$938
$25,015
TAXIWAY F
1200
Seal cracks
Seal cracks
Seal cracks
Seal cracks
Seal cracks
$938
$938
$938
$938
$938
$30,063
TAXIWAY G
1300
Seal cracks
Seal cracks
Seal cracks
$938
$938
$938
$17,113
Page Jac of _13 __