Loading...
HomeMy WebLinkAboutAirfield Pavement Management Plan.11AIRFIELD PAVEMENT MANAGEMENT PLAN BASED O1" BASED ON FAA/AIP GRANT FAA/AIP GRANT AVAILABILITY AVAILABILITY TOTAL COSTS PAVEMENT ID AREA, SY 1994 - 1996 1997 - 1999 2000 - 2002 2003 - 2005 2006 - 2008 20 YEAR TAXIWAY H 2200 Seal cracks Seal cracks Seal cracks Slurry seal Seal cracks $1,125 $1,125 $750 $1,100 $1,125 $7,125 TAXIWAY K 1400 Seal cracks Seal cracks Seal cracks, Seal cracks Seal cracks isolated patches $350 $525 $1,020 $525 $525 $57,470 TAXIWAY L 1500 Seal cracks AC Overlay Seal cracks Seal cracks Seal cracks $563 $10,937 $375 $188 $563 $13,362 TAXIWAY M 600 Seal cracks Seal cracks Seal cracks, $225 $150 $450 $18,875 TAXIWAY N 1400 Seal cracks AC Overlay Seal cracks Seal cracks Seal cracks $525 $10,209 $350 $175 $525 $12,684 ACCESS TAXIWAY 5800 Seal cracks AC Overlay Seal cracks Seal cracks Seal cracks $2,175 $42,291 $1,450 $725 $2,175 $52,929 BOEING BRIDGE 1400 Slurry seal Seal cracks Seal cracks, Seal cracks Seal cracks TAXIWAY isolated patches $2,800 $1,650 $2,970 $2,475 $2,475 $16,895 TOTAL COST PER 3-YEAR $43,887 $144,888 $35,836 $614,122 $95,131 $3,199,790 INTERVAL Page l.k of —L.�_