HomeMy WebLinkAboutAirfield Pavement Management Plan.11AIRFIELD PAVEMENT MANAGEMENT PLAN
BASED O1"
BASED ON
FAA/AIP GRANT
FAA/AIP GRANT
AVAILABILITY
AVAILABILITY
TOTAL COSTS
PAVEMENT ID
AREA, SY
1994 - 1996
1997 - 1999
2000 - 2002
2003 - 2005
2006 - 2008
20 YEAR
TAXIWAY H
2200
Seal cracks
Seal cracks
Seal cracks
Slurry seal
Seal cracks
$1,125
$1,125
$750
$1,100
$1,125
$7,125
TAXIWAY K
1400
Seal cracks
Seal cracks
Seal cracks,
Seal cracks
Seal cracks
isolated patches
$350
$525
$1,020
$525
$525
$57,470
TAXIWAY L
1500
Seal cracks
AC Overlay
Seal cracks
Seal cracks
Seal cracks
$563
$10,937
$375
$188
$563
$13,362
TAXIWAY M
600
Seal cracks
Seal cracks
Seal cracks,
$225
$150
$450
$18,875
TAXIWAY N
1400
Seal cracks
AC Overlay
Seal cracks
Seal cracks
Seal cracks
$525
$10,209
$350
$175
$525
$12,684
ACCESS TAXIWAY
5800
Seal cracks
AC Overlay
Seal cracks
Seal cracks
Seal cracks
$2,175
$42,291
$1,450
$725
$2,175
$52,929
BOEING BRIDGE
1400
Slurry seal
Seal cracks
Seal cracks,
Seal cracks
Seal cracks
TAXIWAY
isolated patches
$2,800
$1,650
$2,970
$2,475
$2,475
$16,895
TOTAL COST PER 3-YEAR
$43,887
$144,888
$35,836
$614,122
$95,131
$3,199,790
INTERVAL
Page l.k of —L.�_