Loading...
HomeMy WebLinkAboutAirfield Pavement Management Plan.8AIRFIELD PAVEMENT MANAGEMENT PLAN BASED ON BASED ON BASED ON FAA/AIP GRANT FAA/AIP GRANT FAA/AIP GRANT AVAILABILITY AVAILABILITY AVAILABILITY TOTAL COSTS PAVEMENT ID AREA, SY 1988 - 1989 1990 1991 1992 - 1993 6 YEAR RUNWAY 119600 PCC joint reseal;crack Seal cracks PCC joint reseal; AC seal, storm drain, fabric overlay on AC pvt, overlay, rwy marking rwy marking $275,600 $2,869 $1,276,758 $1,555,227 WEST RAMP 70000 Seal cracks Seal cracks AC overlay Seal cracks AND $5,000 $12,686 $258,686 $14,665 $291,037 TAXIWAY A TAXIWAY B 12100 AC Overlay with fabric, Seal cracks Seal cracks Slurry seal slotted drain $207,000 $3,540 $3,540 $24,200 $238,280 TAXIWAY C 1900 Seal cracks Seal cracks Fabric & AC overlay $1,000 $738 $13,794 $15,532 TAXIWAY D 1000 AC overlay and storm Seal cracks Seal cracks drain $20,000 $275 $825 $21,100 TAXIWAY E 1300 Seal cracks Seal cracks Reconstruct Seal cracks $400 $313 $18,676 $938 $20,327 TAXIWAY F 1200 Reconstruct with storm Seal cracks Seal cracks drain $23,500 $938 $938 $25,375 TAXIWAY G 1300 Seal cracks Slurry seal Reconstruct $300 $2,600 $11,400 $14,300 Page 13 A of _L 3