HomeMy WebLinkAboutAirfield Pavement Management Plan.8AIRFIELD PAVEMENT MANAGEMENT PLAN
BASED ON
BASED ON
BASED ON
FAA/AIP GRANT
FAA/AIP GRANT
FAA/AIP GRANT
AVAILABILITY
AVAILABILITY
AVAILABILITY
TOTAL COSTS
PAVEMENT ID
AREA, SY
1988 - 1989
1990
1991
1992 - 1993
6 YEAR
RUNWAY
119600
PCC joint reseal;crack
Seal cracks
PCC joint reseal; AC
seal, storm drain, fabric
overlay on AC pvt,
overlay, rwy marking
rwy marking
$275,600
$2,869
$1,276,758
$1,555,227
WEST RAMP
70000
Seal cracks
Seal cracks
AC overlay
Seal cracks
AND
$5,000
$12,686
$258,686
$14,665
$291,037
TAXIWAY A
TAXIWAY B
12100
AC Overlay with fabric,
Seal cracks
Seal cracks
Slurry seal
slotted drain
$207,000
$3,540
$3,540
$24,200
$238,280
TAXIWAY C
1900
Seal cracks
Seal cracks
Fabric & AC overlay
$1,000
$738
$13,794
$15,532
TAXIWAY D
1000
AC overlay and storm
Seal cracks
Seal cracks
drain
$20,000
$275
$825
$21,100
TAXIWAY E
1300
Seal cracks
Seal cracks
Reconstruct
Seal cracks
$400
$313
$18,676
$938
$20,327
TAXIWAY F
1200
Reconstruct with storm
Seal cracks
Seal cracks
drain
$23,500
$938
$938
$25,375
TAXIWAY G
1300
Seal cracks
Slurry seal
Reconstruct
$300
$2,600
$11,400
$14,300
Page 13 A of _L 3