HomeMy WebLinkAboutAirfield Pavement Management Plan.9AIRFIELD PAVEMENT MANAGEMENT PLAN
BASED OIL
BASED ON
BASED ON
FAA/AIP GRANT
FAA/AIP GR�-T
FAA/AIP GRANT
AVAILABILITY
AVAILABILITY
AVAILABILITY
TOTAL COSTS
PAVEMENT ID
AREA, SY
1988 - 1989
1990
1991
1992 - 1993
6 YEAR
TAXIWAY H
2200
Seal cracks
Seal cracks
Seal cracks
$400
$375
$1,125
$1,900
TAXIWAY K
1.400
Reconstruct with storm
Seal cracks
Seal cracks
drain
$54,000
$175
$350
$54,525
TAXIWAY L
1500
Seal cracks
Seal cracks
Seal cracks
$200
$188
$350
$738
TAXIWAY M
600
Reconstruct
Seal cracks
Seal cracks
$17,600
$225
$225
$18,050
TAXIWAY N
1400
Seal cracks
Seal cracks
Seal cracks
$200
$175
$525
$900
ACCESS TAXIWAY
5800
Seal cracks
Seal cracks
Seal cracks
$1,000
$938
$2,175
$4,113
BOEING BRIDGE
1400
Seal cracks
Seal cracks
Slurry seal
TAXIWAY
$900
$825
$2,800
$4,525
TOTAL COST PER YEAR.
$607,100
$24,871
$282,890
$1,351,068
$2,265,928
INTERVAL