Loading...
HomeMy WebLinkAboutAirfield Pavement Management Plan.9AIRFIELD PAVEMENT MANAGEMENT PLAN BASED OIL BASED ON BASED ON FAA/AIP GRANT FAA/AIP GR�-T FAA/AIP GRANT AVAILABILITY AVAILABILITY AVAILABILITY TOTAL COSTS PAVEMENT ID AREA, SY 1988 - 1989 1990 1991 1992 - 1993 6 YEAR TAXIWAY H 2200 Seal cracks Seal cracks Seal cracks $400 $375 $1,125 $1,900 TAXIWAY K 1.400 Reconstruct with storm Seal cracks Seal cracks drain $54,000 $175 $350 $54,525 TAXIWAY L 1500 Seal cracks Seal cracks Seal cracks $200 $188 $350 $738 TAXIWAY M 600 Reconstruct Seal cracks Seal cracks $17,600 $225 $225 $18,050 TAXIWAY N 1400 Seal cracks Seal cracks Seal cracks $200 $175 $525 $900 ACCESS TAXIWAY 5800 Seal cracks Seal cracks Seal cracks $1,000 $938 $2,175 $4,113 BOEING BRIDGE 1400 Seal cracks Seal cracks Slurry seal TAXIWAY $900 $825 $2,800 $4,525 TOTAL COST PER YEAR. $607,100 $24,871 $282,890 $1,351,068 $2,265,928 INTERVAL