HomeMy WebLinkAboutContract No 1 Gene L Coulon Memorial Beach Park.3�� STAGE ONE
00GO
NTRPG .�xJS'?ii
N oku
CONS ; , - _
i
A5
�—
NOTES - STAGE ONE
A. Maintain continuous public access to existing park outside of construc-
tion fence and maintain full access to boat launch and interim boat
launch parking.
B. Install temporary roads as shown by tone on drawing. (See
Demolition Plan, Sheets #6& 7.)
2 STAGE TWO
-f ------
o�TRPGT
0
0'� GXIrJ?71 'A
.
;/ ♦ CEOLL
l --�
y
oNs RUC----------------
TION
NOTES
A. Perform demolition, grading, planting revisions of parking
areas, and all other work required to prepare new stream bed
with minimum disruption of park use.
(See Section 01010- Summary of Work)
B. Conform to all Washington State Department of Fisheries requirements
(see Section 01010).
- f
¢` I�
Eli -
,a 1
.... . ... ... .
100,
\ N.
\ \ _-- --------
.n
IN,
�.� .. `ems .... , � \'\ '\ �,. `7_C _ _ s:�r+, �
_
+�AtN�mtKN� �7b� I _
\ RE
_ NL F N
C
\ J \ \
E (T MAIN)
:
J \ \
LIMIT OF CONTRACT \ \ \ ` —' — _ LIMIT OF CONTRACT
\ — \ — —.
•\,\ ''\'\,` _ --•-•-•-•-.-.-------.�.......��...�....... ...s.�.�.�.� .\ .� •-•-•---• �-�. �. �. �.� T.. �.............
�
STAGE THREE NOTES STAGE FOUR .NOTES
3,/
o STREAM RELOCATION SEQUENCE (SEE SECTION n1.n1.0 FOP TIME T�RTTnmO
No
A. Complete remainder of construction contract.
A. Remove lakeside earth plug to allow lake water into new stream bed. B. Tone indicates approximate area of new paving. (See layout plans_j_
B. Remove earth plug from head of new stream bed, establish stream in
new bed, and place earth plug at head of existing stream.!
-GENERAI NOTE:
C. Fill mouth of existing stream.
D. Fill existing stream as required to install. access road (See Grading THESE DRAWINGS ARE IN T ENDED ONLY TO PRESENT A DIAGRAMMATIC WORK SEQUENCE STATF. OF
Plan) . Provide access road as shown by tone on drawing and eve .i:;Tt3MD
double chainlink gate (See Layout Plan) REFER TO APPROPRIATE PLANS FOR COMPLETE CONTRACT REQUIREMENTS.,,,
LAND A