Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCO 09s
• •
AIRPORT. Renton Municipal Airport
LOCATION: Renton, Washington
CONTRACTOR: ICON Materials
F
CHANGE ORDER # 9
DATE: 9 -17 -13
GRANT* 3 -53- 0055 -024
This change order was prepared in accordance with FAA Program Guidance Letter 12 -03. A price
analysis was prepared and it is recommended that the FAA accept the analysis as evidence of cost
reasonableness.
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the Engineer:
Item Description Unit Unit Price Quantity Amount
KIDOCMAp110 007 Renton Twa & Signagel'Soutn Taxiway Construction \Change Orders \CO 9.docx
Mobilization (Perimeter Road
1
Rehabilitation)
LS
$7,500.00
1
$7,500.00
2
QC Testing
LS
$1,000.00
1
$1,000.00
3
Construction Survey
LS
$1,000.00
1
$1,000.00
4
Erosion Control
LS
$1,000.00
1
$1,000.00
5
Asphalt Sawcutting
LF
$3.85
80
$308.00
Asphalt Pavement Grinding and
6
Disposal
SY
$3.75
1,300
$4,875.00
7
Adjust Manhole
EA
$700.00
1
$700.00
8
Adjust Catch Basin
EA
$700.00
2
$1,400.00
9
Adjust Valve Box and Cleanouts
EA
$450.00
8
$3,600.00
10
Pavement Preparation
SY
$13.00
200
$2,600.00
HMA Cl. ' /cinch PG 64 -22 (2"
11
overlay)
TON
$80.00
530
$42,400.00
12
Bituminous Tack Coat
TON
$900.00
2
$1,800.00
Fire Hydrant Raised Pavement
13
Marker
EA
$11.00
4
$44.00
14
Paint Striping
LF
$0.50
2,400
$1,200.00
15
Painted Stop Line
LF
$5.00
10
$50.00
16
Painted Crosswalk Line
SF
$35.00
64
$2,240.00
17
Project Temporary Traffic Control
LS
$5,625.00
1
$5,625.00
Subtotal
$77,342.00
State Sales Tax (9.5 %)
$7,347.49
This Change Order Total
$84,689.49
Previous Change Order Amount
$378,568.93
Original Contract Amount
$5,460,424.21
Revised Contract Total
$5,923,682.63
KIDOCMAp110 007 Renton Twa & Signagel'Soutn Taxiway Construction \Change Orders \CO 9.docx
Recommended by
Approved by.
Accepted by.
Accepted by
Engine(/, Reid Middleton, Inc.
Owner, City f ton
Contractor
Federdl AUriation Administration
Date: �1)2.111�
Date:
Date: -g A3
Date: '7h 1Y13
H :00C123ApV0k007 Renton rws & signagek'soutn Taxiway Construction \Change Orders \CO 9.docx
4
CHANGE ORDER # 9
AIP PROJECT NO. 3 -53- 0055 -024
AIRPORT Renton Municipal Airport LOCATION Renton, WA
JUSTIFICATION FOR CHANGE
This justification for change was prepared in accordance with FAA Program Guidance
Letter 12 -03
1. Brief description of the proposed contract change(s) and locations(s).
This change order consists of the following:
1. Pavement repair of Perimeter Road on the east side of the airport from the vicinity of
the intersection with Logan Ave. N. to the vicinity of Gate V -10 (approximately 0.3
miles).
Reid Middleton Memorandum dated August 30, 2013, (attached) documents these
revisions.
2. Reason(s) for the change(s) (Continue on reverse if necessary).
The Taxiway `B' Rehabilitation project consisted of the reconstruction and rehabilitation
of the existing taxiway pavements east of Runway 16 -34. The design and construction of
the project was conducted within two phases. Construction commenced during May 2013
and continues through September 2013. The project anticipated some level of haul road
repair on the Airport Perimeter Road due to construction truck traffic associated with the
Taxiway B improvements. The level of haul road repair necessary prior to construction
was not identifiable. Due to the uncertainty at bid time as to the level of haul road repair
that would be necessary, a force account bid item was set up within the contract, with a
force account place holder value of $75,000.
During the two projects, the perimeter road and Airport office parking lot serving the
airport facility has been subjected to significant truck and trailer traffic from the
construction activities. Although there was some pre- existing pavement distress of the
roadway and parking lot, Airport personnel has observed further deterioration of the
pavement due to prolonged construction traffic, which will affect the service life of the
surfaces. The road and parking lot conditions have deteriorated quicker due to Taxiway
B construction activities and are in need of maintenance to sustain the pavements. The
deterioration is occurring periodically over the full length of the perimeter haul route, and
wide spread within the Airport office parking lot.
This change order includes work items to repair the full length of the perimeter road
utilized for construction haul traffic, and repair the airport office parking lot pavement
subjected to construction activity during installation of the stand by generator system.
H:00Cc 23Ap\l0007 Renton rwa & signaget sourn Taxiway Construction \Change Orders \CO 9.docx
j
The perimeter road and parking lot areas utilized for Taxiway B construction haul traffic,
and identified for repair, is depicted on the airport map included within this change order.
Due to the increase of haul road repair necessary exceeding the established bid item
amount by more than 25 %, payment for the perimeter haul road repair and parking lot
repair (as depicted on the attached map) shall not be paid out under bid item 6 -13, but
shall be paid under items established within this change order.
The work described in this change order is within of the limits of the Shoreline
Exemption defined in the Certificate of Exemption issued by the City of Renton dated
January 3, 2013. This Exemption defines the closest point of work as "64 feet from the
flood wall which is estimated to be the approximate location of the (Cedar River)
OHWM." To complete the work described in this change order, an additional submittal
for a Shoreline Exemption has been prepared and submitted for processing and approval
by the City of Renton. This work can proceed once the Exemption is received.
3. Justifications for unit prices or total cost:
Justification was prepared in accordance with FAA program guidance letter 12 -03.
4. The sponsor's share of this cost is available from: Port Funds
5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based
on the latest wage rate decision? Yes No NA X
6. Has consent of surety been obtained? Yes Not Necessary X
7. Will this change affect the insurance coverage? Yes No X
8. If yes, will the policies be extended? Yes No X
9. Has this Change Order been discussed with FAA Officials?
Yes X No When 09/10/13 With Whom Peter Doyle
H :000 23Apt10007 Renton rwa & signageVSourli Taxiway Construction \Change Orders \CO 9.docx
z �
Renton Airport
Change Order Cost Analysis /Backup for Taxiway B System Rehabilitation — South Portion
Change Order #9
This cost analysis is prepared in compliance with Program Guidance Letter 12 -03. Comparative costs
have been taken from bid prices for other projects, from construction cost guides and from quotes from
suppliers. The quantities to complete each of the activities listed below are small in comparison to the
quantities for a typical project, therefore unit prices for the items listed will be higher than expected for
a large quantity.
Perimeter Road Repair from Logan Ave. N. to Vicinity Gate V -10
This activity consists of the following tasks.
1. Mobilization
The proposed lump sum price of $7,500 for the proposed new bid item for the added work on Perimeter
Road and the Airport Office Parking Lot is approximately 10% of the proposed cost for this work. For
projects of this size and scope, mobilization percentages of 8% to 13% are common. Due to the break in
schedule between performing the Taxiway B construction and this added work, the Contractor will de-
mobilize from the Taxiway B site and re- mobilize when this pavement repair work begins.
2. QC Testing
The proposed lump sum price of $1,000 for the proposed new bid item for the added work on Perimeter
Road and the Airport Office Parking Lot is approximately 1.3% of the proposed cost for this work. For
projects of this size and scope, QC Testing percentages of 0.5% to 1.5% are common.
3. Construction Survey
The proposed lump sum price of $1,000 for the proposed new bid item for the added work on Perimeter
Road and the Airport Office Parking Lot is approximately 1.3% of the proposed cost for this work. For
projects of this size and scope, construction survey percentages of 0.5% to 1.5% are common.
4. Erosion Control
The proposed lump sum price of $1,000 for the proposed new bid item for the added work on Perimeter
Road and the Airport Office Parking Lot is approximately 1.3% of the proposed cost for this work. For
projects of this size and scope, erosion control percentages of 0.5% to 1.5% are common.
5. Asphalt Sawcutting
Review of unit prices for Asphalt Sawcutting indicates that unit prices for street and roadway projects
for comparable quantities of sawcutting range from $3.00 to $6.00 per LF. The total cost for sawcutting
80 LF of asphalt pavement can be expected to range from $240 to $480.
The Contractor's unit price of $3.85 per LF results in a cost of $308.
6. Asphalt Pavement Grinding and Disposal
Review of unit prices for Asphalt Pavement Grinding and Disposal indicates that unit prices ( WSDOT bid
item Planing Bituminous Pavement) within the WSDOT Northwest Region (King County) for comparable
quantities of pavement grinding range from $1.31 to $4.10 per SY. The total cost for 1,300 SY of Asphalt
Pavement Grinding and Disposal can be expected to range from $1,703 to $5,330.
The Contractor's unit price of $3.75 per SY results in a cost of $4,875.
7. Adjust Manhole
Review of unit prices for Adjust Manhole indicates that unit prices within the WSDOT Northwest Region
(King County) for comparable quantities of manhole adjustment range from $260 to $750 per EA. The
total cost for adjusting 1 EA manholes can be expected to range from $260 to $750.
The Contractor's unit price of $700 per EA results in a cost of $700.
8. Adjust Catch Basin
Review of unit prices for Adjust Catch Basin indicates that unit prices within the WSDOT Northwest
Region (King County) for comparable quantities of catch basin adjustment range from $300 to $900 per
EA. The total cost for adjusting 2 EA catch basins can be expected to range from $600 to $1,800.
The Contractor's unit price of $700 per EA results in a cost of $1,400.
9. Adjust Valve Box and Cleanouts
Review of unit prices for Adjust Valve Boxes and Cleanouts indicates that unit prices within the WSDOT
Northwest Region (King County) for comparable quantities of valve box and catch basin adjustment
range from $72 to $480 per EA. The total cost for adjusting 8 EA valve boxes and cleanouts can be
expected to range from $576 to $3,840.
The Contractor's unit price of $450 per EA results in a cost of $3,600.
10. Pavement Preparation
Review of unit prices for Pavement Preparation (application of 1 -foot wide strip of PetroTac) indicates
that unit price from the Ashland Municipal Airport project of 2011 for PetroTac was $18.00 per SY. The
total cost for 200 SY of Pavement Preparation could be expected to be approximately $3,600.
The Contractor's unit price of $13.00 per SY results in a cost of $2,600.
11. HMA Cl. Y2-Inch PG 64 -22
Review of unit prices for HMA Cl. %Z -Inch PG 64 -22 indicates that unit prices within the WSDOT
Northwest Region (King County) for comparable quantities of HMA range from $70 to $95.80 per Ton.
The total cost for paving 530 Tons of HMA Cl. 1/" PG 64 -22 can be expected to range from $37,100 to
$50,774.
The Contractor's unit price of $80.00 per Ton results in a cost of $42,400.
12. Bituminous Tack Coat
The proposed unit price of $900 per Ton for application of Bituminous Tack Coat matches the unit price
established in the contract for the rehabilitation of Taxiway B.
For the estimated quantity of 2 Tons of tack coat, the Contractor's unit price of $900.00 per Ton results
in a cost of $1,800.00.
13. Fire Hydrant Raised Pavement Marker
Review of unit prices for Fire Hydrant Raised Pavement Markers indicates that unit prices within the
WSDOT Northwest Region (King County) for comparable quantities of fire hydrant markers range from
$9.50 to $11.50 per EA.. The total cost for installing 4 EA Fire Hydrant Raised Pavement Markers can be
expected to range from $38 to $46.
The Contractor's unit price of $11.00 per EA results in a cost of $44.
14. Paint Striping
Review of unit prices for Paint Striping indicates that unit prices within the WSDOT Northwest Region
(King County) for comparable quantities of paint striping range from $0.12 to $0.50 per LF. The total
cost for installing 2,400 LF of Paint Striping can be expected to range from $288 to $1,200.
The Contractor's unit price of $0.50 per LF results in a cost of $1,200.
15. Painted Stop Line
Review of unit prices for Painted Stop Line indicates that unit prices within the WSDOT Northwest .
Region (King County) for comparable quantities of stop line striping range from $1.60 to $6.00 per LF.
The total cost for installing 10 LF of Painted Stop Line can be expected to range from $16 to $60.
The Contractor's unit price of $5.00 per LF results in a cost of $50.
16. Painted Crosswalk Line
Review of unit prices for Painted Crosswalk Line indicates that there are no unit prices within the
WSDOT Northwest Region (King County) for comparable quantities of painted crosswalk line. For the
relatively small quantity, a unit price of $25 to $35 per SF may be seen. Accordingly, the total cost for
installing 64 SF of Painted Crosswalk Line could be expected to range from $1,600 to $2,240.
The Contractor's unit price of $35.00 per EA results in a cost of $2,240.
17. Project Temporary Traffic Control
The proposed lump sum price of $5,625 for the proposed new bid item for the added work on Perimeter
Road and the Airport Office Parking Lot is approximately 7% of the proposed cost for this work. For
projects of this size and scope, traffic control percentages of 5% to 13% are common.
Based on these line items, the cost (including SST) for Perimeter Road Repair from Logan Ave. N. to
Vicinity of Gate V -10 can be anticipated to range from $70,021 to $96,409.
Perimeter Road Repair from Logan Ave. N. to Vicinity of Gate V -10 change order price (including SST)
from ICON Materials
$84,689.49
Conclusion: The requested change order amount is a fair and reasonable estimate for addition of a new
work for Perimeter Road Repair from Logan Ave. N. to Vicinity Gate V -10.
H:doc /23ap/10/007 Renton TW B & Signagef south Taxiway Constr /Change Orders /Renton CO #9 Cost Justification.doc.mjc
n
Reid -M iddleton
19S3-2013
728 134th Street SW, Suite 200
Everett, WA 98204
Ph: 425/741 -3800, Fax: 425/741 -3900
MEMORANDUM
To: Mr. Peter Doyle — Federal Aviation Administration Northwest Mountain Region
From: Kurt Addicott, P.E. — Reid Middleton, Inc.
Date: August 30, 2013
File No.: 232010.007
Subject: Renton Municipal Airport — Haul Route Repairs
Background
The Taxiway `B' Rehabilitation project consisted of the reconstruction and rehabilitation of the existing
taxiway pavements east of Runway 16 -34. The design and construction of the project was conducted
within two phases. Construction commenced during May 2013 and continues through September 2013.
The project anticipated some level of haul road repair on the Airport Perimeter Road due to truck traffic
associated with the Taxiway B improvements. The level of haul road repair necessary prior to
construction was not identifiable. Due to the uncertainty at bid time as to the level of haul road repair that
would be necessary, a force account bid item was set up within the contract, with a force account place
holder value of $75,000.
During the projects, the perimeter road and Airport office parking lot serving the airport facility has been
subjected to significant truck and trailer traffic from the construction activities. Although there was some
pre- existing pavement distress of the roadway and parking lot, it has become apparent that the
construction traffic along this roadway has further deteriorated the pavement and affected the service life
of the surface. The road and parking lot conditions have deteriorated quicker due to Taxiway B
construction activities and are in need of maintenance to sustain the pavements. The deterioration is
occurring periodically over the full length of the perimeter haul route, and wide spread within the Airport
office parking lot.
Conclusion and Recommendation
It is recommended that the Airport undertake rehabilitation of the full length of the perimeter road utilized
for construction haul traffic, as well as the airport office parking lot subjected to construction activity
during installation of the stand by generator installation. The perimeter road area utilized for Taxiway B
construction haul traffic, and recommended to be rehabilitated, is identified on the attached airport map.
The recommended rehabilitation of the full perimeter road haul route has an estimated construction value
of $589,000. The recommended rehabilitation of the parking lot damage has an estimated construction
value of $40,000. Reid Middleton recommends undertaking these elements of work and increasing the
value of the contract haul road repair bid item.
Page 1 of 1
LL
O �
= m
n
(Q .0
i ?
N�
C
O
i y
co
O) �
C
'co
d
ca
f0
O
Of
a
It
d+D'vn6� \PU +oYUwvd \SIH MtlOM \V^4�!Y "°1�L Lm \OIOZ \CL \�� wEpp:9 fIOZ /6Z /Po
-
r
r
gp
@
1
;
D
G
W
I
t
!
K�
�
I
I
r f
r r
i
LL
O �
= m
n
(Q .0
i ?
N�
C
O
i y
co
O) �
C
'co
d
ca
f0
O
Of
a
It
d+D'vn6� \PU +oYUwvd \SIH MtlOM \V^4�!Y "°1�L Lm \OIOZ \CL \�� wEpp:9 fIOZ /6Z /Po
4axiway B System Rehabilitation Proje
Renton Municipal Airport — Clayton Scott Field
Renton, Washington
Perimeter Road Rehabilitation (24' Width)
Basic Overlay Approach
Items of Work and Materials Quantity Unit Unit Price I Total Amount
Mobilization
Mobilization
I
LS
$ 10,000.00
$ 10,000.00
Subtotall
$ 10,000.00
Site Control
QC Testing
1
LS
$ 5,000.00
$ 5,000.00
Construction Survey
1
LS
$ 5,000.00
$ 5,000.00
Erosion Control
1
LS
$ 5,000.00
$ 5,000.00
Subtotall
$ 15,000.00
Road Rehabilitation
Asphalt Sawcutting
400
LF
$ 3.00
$ 1,200.00
Asphalt Pavement Grinding and Disposal
6400
SY
$ 15.00
$ 96,000.00
Adjust Telephone Vault
2
EA
$ 750.00
$ 1,500.00
Adjust Manhole
18
EA
$ 500.00
$ 9,000.00
Adjust Catch Basin
2
EA
$ 500.00
$ 1,000.00
Adjust Valve Box and Cleanouts
14
EA
$ 400.00
S 5,600.00
Pavement Preparation
10000
SY
$ 3.00
$ 30,000.00
Bituminous Surface Course (2" Overlay)
2670
TON
$ 85.00
$ 226,950.00
Bituminous Tack Coat
10
TON
$ 1,100.00
$ 11,000.00
Removing Conc. Curb and Gutter
475
LF
$ 8.00
$ 3,800.00
Cement Conc. Traffic Curb and Gutter
475
LF
$ 30.00
$ 14,250.00
Raised Pavement Marker Removal
200
EA
$ 1.00
$ 200.00
Raised Pavement Marker (Large Road Stud)
1
HUND
$ 650.00
$ 650.00
Raised Pavement Marker (WSDOT Type IY)
1
HUND
$ 475.00
$ 475.00
Fire Hydrant Raised Pavement Marker
26
EA
$ 5.00
$ 130.00
Roadway Paint
12000
LF
$ 1.00
$ 12,000.00
Painted Stop Line
125
LF
$ ' 20.00
$ 2,500.00
Painted Traffic Arrow
5
EA
$ 120.00
$ 600.00
Herbicide
23500
SY
$ 2.00
$ 47,000.00
Subtotal!
$ 463,855.00
SUBTOTAL
$ 488,855.00
CONTINGENCY (10 %)
$ 48,885.50
SUBTOTAL
$ 537,740.50
SALES TAX (9.5 %)
$ 51,085.35
TOTAL
$ 588,825.85
ASSUME
$ 589,000.00
AIP #: 3 -53- 005 -023 & -024 Renton Municipal Airport
Project #: 232010.007 Page 1 of 1 Opinion of Cost
ilioTaxiway B System Rehabilitation Project J
Renton Municipal Airport – Clayton Scott Field
Renton, Washington
Airport Office Parking Lot Rehabilitation
Basic Overlay Approach
Items of Work and Materials ----7Quantity Unit Unit Price Total Amount
Mobilization
Mobilization
1
LS
$ 2,000.00
$ 2,000.00
Subtotal
$ 2,000.00
Site Control
QC Testing
1
LS
$ 5,000.00
$ 5,000.00
Construction Survey
1
LS
3%
$ 1,000.00
Erosion Control
1
LS
$ 5,000.00
$ 5,000.00
Subtotal
$ 11,000.00
Road Rehabilitation
Asphalt Sawcutting
100
LF
$ 3.00
$ 300.00
Asphalt Pavement Grinding and Disposal
340
SY
$ 15.00
$ 5,100.00
Adjust Manhole
1
EA
$ 500.00
$ 500.00
Adjust Catch Basin
1
EA
$ 500.00
$ 500.00
Pavement Preparation
100
SY
$ 3.00
$ 300.00
Bituminous Surface Course
100
TON
$ 85.00
$ 8,500.00
Bituminous Tack Coat
I
TON
$ 1,100.00
$ 1,100.00
Removing Conc. Curb and Gutter
50
:, LF
$ 8.00
$ 400.00
Cement Conc. Traffic Curb and Gutter
50
LF
$ 30.00
$ 1,500.00
Roadway Paint
240
LF
$ 1.00
$ 240.00
Herbicide
800
SY
$ 2.00
$ 1,600.00
Subtotal
$ 20,040.00
SUBTOTAL
$ 33,040.00
CONTINGENCY (10 %)
$ 3,304.00
SUBTOTAL
I $ 36,344.00
SALES TAX (9.5 %),
$ 3,452.68
TOTALI
$ 39,796.68
ASSUME
T—$ 40,000.00
AIP #: 3 -53- 005 -023 & -024 Renton Municipal Airport
Project #: 232010.007 Page 1 of 1 Opinion of Cost
Taxiway B System Rehabilitation Project
Renton Municipal Airport — Clayton Scott Field
Renton, Washington
1. View of the Airport
Office Parking Lot
after the installation of
the generator.
2. Damage to West
Perimeter Road.
AIP #: 3 -53- 0055 -023 & -024 Page I of 4 Renton Municipal Airport
Project #: 232010.007 Perimeter Road Photographs
n
New damage near
previously repaired
asphalt surface.
4. View of two trucks
passing along West
Perimeter Road.
AIP #: 3 -53- 0055 -023 & -024 Page 2 of 4 Renton Municipal Airport
Project #: 232010.007 Perimeter Road Photographs
5. Damage along East
Perimeter Road.
6. Damage to East
Perimeter Road
heading east.
AIP #: 3 -53- 0055 -023 & -024 Page 3 of 4 Renton Municipal Airport
Project #: 232010.007 Perimeter Road Photographs
E
7. The intersection
between Logan
Avenue and East
Perimeter Road.
$. Damage to East
Perimeter Road along
an existing pavement
patch.
AIP #: 3 -53- 0055 -023 & -024 Page 4 of 4 Renton Municipal Airport
Project #: 232010.007 Perimeter Road Photographs
UBA History of Item 0230 EASTERN Region
I
Page 1 of 7
News Sump I Conbat Wobdi- 1A18DaT Nano
Unit Bid Analysis History
for Standard Item 3080 A R:1 14 S ON I kO 1.., t✓
in the NORTHWEST Region
To view the detail information for a specfic contract click on Contract Number
Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date
008439
14.0000
465.0000
740.0000
700.0000
Mar 27, 2013
008436
2.0000
250.0000
300.0000
350.0000
Mar 27, 2013
008381.
1.0000
342.0000
600.0000
250.0000
Dec 12, 2012
008236
1.0000
425.0000
400.0000
400.0000
Jan 11, 2012
008140
1.0000
490.0000
500.0000
350.0000
Jun 08, 2011
008128
1.0000
1000.0000
600.0000
550.0000
May 18, 2011
008114
2.0000
345.0000
390.0000
750.0000
Apr 20, 2011
008103
118.0000
625.0000
Apr 06, 2011
0081.01
3.0000
350.0000
350.0000
350.0000
Mar 23, 2011
008053
13.0000
530.0000
325.0000
550.0000
Feb 02, 2011
008077
1.0000
400.0000
500.0000
400.0000
Feb 02, 2011
008052
1.0000
500.0000
370.0000
850.0000
Jan 05, 2011
008055
2.0000
600.0000
500.0000
450.0000
Jan 05, 2011
008051
8.0000
375.0000
625.0000
300.0000
Dec 15, 2010
007945
2.0000
375.0000
550.0000
450.0000
Jun 23, 2010
007936
8.0000
800.0000
800.0000
550.0000
Jun 09, 2010
007921
1.0000
600.0000
450.0000
750.0000
May 05, 2010
007917
3.0000
300.0000
351.8300
300.0000
Apr 14, 2010
007874
2.0000
400.0000
370.0000
300.0000
Jan 27, 2010
007653
56.0000
340.0000
485.0000
400.0000
Jan 14, 2009
007647
1.0000
600.0000
1000.0000
800.0000
Jan 07, 2009
http:// www. wsdot. wa .gov/biz/contaa/uba/ubahist.cf n? &Item = 3080 &xRegion =l 9/12/2013
UBA History of Item 0230
EASTERN Region
Page 2 of 7
007575
6.0000
200.0000
1360.0000
500.0000
Jul 09, 2008
007573
1.0000
350.0000
440.0000
1000.0000
Jun 18, 2008
007532
1.0000
1000.0000
475.0000
600.0000
Apr 30, 2008
007510
1.0000
400.0000
4000.0000
500.0000
Mar 04, 2008
007484
9.0000
450.0000
500.0000
750.0000
Feb 27, 2008
007480
25.0000
450.0000
560.0000
630.0000
Feb 06, 2008
007431
3.0000
600.0000
750.0000
580.0000
Dec 12, 2007
007426
1.0000
790.0000
500.0000
1000.0000
Nov 28, 2007
007411
1.0000
500.0000
350.0000
750.0000
Oct 17, 2007
007337
54.0000
350.0000
500.0000
550.0000
May 09, 2007
007339
1.0000
540.0000
3000.0000
May 02, 2007
007264
2.0000
300.0000
500.0000
400.0000
Feb 14, 2007
007240
5.0000
450.0000
500.0000
500.0000
Jan 18, 2007
007251
1.0000
500.0000
375.0000
500.0000
Jan 18, 2007
007192
29.0000
300.0000
450.0000
700.0000
Aug 16, 2006
007163
1.0000
1000.0000
450.0000
1500.0000
Jun 28, 2006
007157
19.0000
300.0000
750.0000
260.0000
Jun 07, 2006
007113
4.0000
400.0000
300.0000
300.0000
Mar 22, 2006
007064
9.0000
269.0000
700.0000
Jan 19, 2006
007030
28.0000
400.0000
490.0000
500.0000
Nov 30, 2005
006994
6.0000
290.0000
300.0000
650.0000
Jul 13, 2005
007006
1.0000
400.0000
400.0000
400.0000
Jun 29, 2005
006981
3.0000
500.0000
500.0000
1000.0000
May 11, 2005
006941
11.0000
350.0000
325.0000
400.0000
May 11, 2005
006974
8.0000
375.0000
375.0000
550.0000
May 11, 2005
006960
18.0000
300.0000
400.0000
440.0000
May 04, 2005
006932
7.0000
380.0000
375.0000
1250.0000
May 04, 2005
006955
38.0000
450.0000
450.0000
550.0000
Apr 20, 2005
006953
39.0000
360.0000
450.0000
450.0000
Apr 20, 2005
006913
1.0000
500.0000
400.0000
300.0000
Feb 24, 2005
006879
2.0000
500.0000
400.0000
410.0000
Feb 09, 2005
http:// www. wsdot. wa. govfbiz/contaa/uba/ubahist.cfm? &Item = 3080 &xRegion =l 9/12/2013
UBA History of Item 0230 EASTERN Region Page 1 of 10
Nwo I ftarah I Combat VWWT I VWSDCT Homa
Unit Bid Analysis History
for Standard Item 3100 ADJU&1- C -fKC 4 9 SM
in the NORTHWEST Region
To view the detail information for a specfic contract click on Contract Number
Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date
008461
6.0000
525.0000
525.0000
550.0000
Apr 24, 2013
008445
6.0000
450.0000
450.0000
450.0000
Apr 03, 2013
008439
86.0000
465.0000
535.0000
500.0000
Mar 27, 2013
008414
2.0000
300.0000
400.0000
900.0000
Mar 13, 2013
008307
3.0000
600.0000
500.0000
550.0000
May 31, 2012
008290
2.0000
515.0000
465.0000
500.0000
May 23, 2012
008286
1.0000
500.0000
500.0000
866.0000
May 09, 2012
008233
1.0000
960.0000
775.0000
250.0000
Jan 05, 2012
008140
11.0000
300.0000
375.0000
325.0000
Jun 08, 2011
008128
2.0000
500.0000
425.0000
400.0000
May 18, 2011
008142
7.0000
500.0000
420.0000
400.0000
May 18, 2011
008103
104.0000
520.0000
Apr 06, 2011
008099
2.0000
450.0000
360.0000
450.0000
Mar 16, 2011
008086
2.0000
144.4500
250.0000
375.0000
Mar 02, 2011
008077
1.0000
400.0000
250.0000
250.0000
Feb 02, 2011
008053
14.0000
530.0000
370.0000
458.0000
Feb 02, 2011
008052
1.0000
500.0000
370.0000
850.0000
Jan 05, 2011
008055
2.0000
600.0000
500.0000
450.0000
Jan 05, 2011
008035
1.0000
530.0000
Nov 17, 2010
007962
2.0000
300.0000
400.0000
450.0000
Jul 14, 2010
007945
1.0000
500.0000
565.0000
450.0000
Jun 23, 2010
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 3100 &xRegion =l 9/12/2013
UBA History of Item 0230 EASTERN Region Page 1 of 6
Sarah Cantsat WBOOT i 1MSDOT Hong
Unit Bid Analysis History
for Standard Item 6243 #D-Tag r MLLJS" FOX 4NO Ct C-1 106175
in the NORTHWEST Region
To view the detail information for a specfic contract click on Contract Number
Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date
008457
3.0000
500.0000
400.0000
380.0000
Apr 24, 2013
008439
4.0000
360.0000
425.0000
425.0000
Mar 27, 2013
008416
3.0000
870.0000
Feb 21, 2013
008128
2.0000
400.0000
350.0000
325.0000
May 18, 2011
008114
3.0000
245.0000
275.0000
600.0000
Apr 20, 2011
008103
80.0000
420.0000
Apr 06, 2011
008053
17.0000
420.0000
125.0000
480.0000
Feb 02, 2011
008052
8.0000
320.0000
230.0000
700.0000
Jan 05, 2011
008055
3.0000
600.0000
500.0000
350.0000
Jan 05, 2011
008051
15.0000
225.0000
475.0000
280.0000
Dee 15, 2010
007948
1.0000
325.0000
375.0000
375.0000
Jun 09, 2010
007938
5.0000
200.0000
180.0000
269.5900
May 26, 2010
007921
1.0000
600.0000
250.0000
625.0000
May 05, 2010
007920
8.0000
310.0000
270.0000
350.0000
May 05, 2010
007859
2.0000
275.0000
200.0000
152.7500
Jan 27, 2010
007874
8.0000
300.0000
265.0000
225.0000
Jan 27, 2010
007653
68.0000
180.0000
315.0000
300.0000
Jan 14, 2009
007575
4.0000
200.0000
1360.0000
500.0000
Ju109, 2008
007532
1.0000
400.0000
146.0000
560.0000
Apr 30, 2008
007484
13.0000
72.0000
250.0000
350.0000
Feb 27, 2008
007479
1.0000
400.0000
2500.0000
1100.0000
Feb 21, 2008
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfin? &Item = 6243 &xRegion =l 9/13/2013
UBA History of Item 0230 EASTERN Region Page 1 of 13
News I 8asrah I Coniaa! VIrBDOT I 1M8DOT Homy►
Unit Bid Analysis History
for Standard Item 5711 T L AN l AJ6 $11 III V O us `W6 M r✓ A 7-
in the NORTHWEST Region
To view the detail information for a specfic contract click on Contract Number
Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date
008461
3228.0000
2.6700
7.4500
7.5000
Apr 24, 2013
008457
57840.0000
1.9000
4.0000
3.0000
Apr 24, 2013
008438
45140.0000
2.2500
Apr 10, 2013
008423
6100.0000
2.0000
2.7000
4.1000
Apr 03, 2013
008445
33579.0000
2.1000
3.5000
4.0000
Apr 03, 2013
008436
1860.0000
3.2500
3.0000
5.0000
Mar 27, 2013
008439
113742.0000
3.2500
3.2500
3.5000
Mar 27, 2013
008414
698.0000
26.0000
32.0000
24.0000
Mar 13, 2013
008418
400.0000
14.0000
19.0000
12.5000
Feb 21, 2013
008416
1211.0000
11.0000
Feb 21, 2013
008363
1047.0000
6.0000
5.0000
7.9000
Sep 19, 2012
008314
22060.0000
3.0500
6.0000
4.6000
Jun 06, 2012
008307
490.0000
10.0000
12.0000
16.4000
May 31, 2012
008286
14771.0000
3.5000
1.8500
3.0000
May 09, 2012
008271
3230.0000
5.0000
12.2000
Apr 18, 2012
008268
62520.0000
1.8500
1.8400
1.6500
Apr 18, 2012
008269
296.0000
15.0000
16.0000
16.2500
Apr 11, 2012
008258
1628.0000
4.0000
9.1500
6.0000
Mar 28, 2012
008222
8550.0000
2.8000
3.5500
2.2000
Nov 09, 2011
008140
14027.0000
3.4000
2.6500
3.0000
Jun 08, 2011
008142
15271.0000
4.0000
5.7000
5.2000
May 18, 2011
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item =5711 &xRegion =l 9/12/2013
UBA History of Item 0230
EASTERN Region
Page 2 of 13
008141
1800.0000
14.0000
22.2500
17.2000
May 18, 2011
008128
35287.0000
4.0000
2.2000
3.0000
May 18, 2011
008116
5230.0000
8.5000
5.5000
9.0000
Apr 27, 2011
008114
50840.0000
1.7500
1.7000
1.8500
Apr 20, 2011
008112
73040.0000
1.6500
1.2000
1.8000
Apr 13, 2011
008103
93604.0000
1.5000
Apr 06, 2011
008099
4030.0000
3.5000
2.0000
3.2500
Mar 16, 2011
008089
260.0000
13.7000
18.0000
8.0000
Mar 09, 2011
008086
2170.0000
3.7500
4.0000
5.7000
Mar 02, 2011
008053
8230.0000
3.0000
3.7500
4.0000
Feb 02, 2011
008065
1950.0000
4.0000
3.2500
3.7500
Jan 12, 2011
008052
29150.0000
2.5000
2.0000
2.8000
Jan 05, 2011
008055
14860.0000
2.3500
3.3000
2.7000
Jan 05, 2011
008051
25920.0000
2.5000
2.8500
2.7000
Dec 15, 2010
008048
1010.0000
12.0000
12.0000
15.0000
Dec 08, 2010
008035
42650.0000
2.0500
Nov 17, 2010
008012
3190.0000
5.0000
3.0000
2.2000
Oct 20, 2010
007962
5450.0000
5.1500
3.5000
4.0000
Jul 14, 2010
007945
48713.0000
1.8500
3.5000
2.4000
Jun 23, 2010
007936
4940.0000
5.0000
7.0000
5.1500
Jun 09, 2010
007948
261.0000
14.0000
16.0000
17.2700
Jun 09, 2010
007938
6452.0000
2.5000
2.0000
1.3700
May 26, 2010
007921
43410.0000
1.5000
2.1000
2.3500
May OS, 2010
007941
147.0000
30.0000
28.0000
20.0000
May 05, 2010
007920
2745.0000
5.0000
2.1000
6.0000
May 05, 2010
007847
995.0000
5.0000
18.0000
16.0000
Apr 14, 2010
007917
2923.0000
3.5000
2.0500
5.0000
Apr 14, 2010
007916
5060.0000
5.0000
3.4200
5.0000
Apr 14, 2010
007911
1047.0000
5.0000
8.1400
6.0000
Mar 31, 2010
007875
74.0000
65.0000
25.0000
48.7100
Feb 03, 2010
007859
6609.0000
2.8500
2.1000
1.3100
Jan 27, 2010
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 5711 &xRegion =l 9/12/2013
UBA History of Item 0230 EASTERN Region Page 4 of 13
z
007531 980.0000
007526 10230.0000
007524 8990.0000
007484 10432.0000
007479 18970.0000
007485 4410.0000
007469 7010.0000
007480 81530.0000
007460 12980.0000
007431 2535.0000
007439 37480.0000
007424 270.0000
007411 42720.0000
007405 2960.0000
007358 320.0000
007354 510.0000
007353 850.0000
007342 312.0000
007337 31019.0000
007320 4400.0000
007315 2070.0000
007317 1119.0000
007298 320.0000
007267 979.0000
007262 355.0000
007272 1601.0000
007264 670.0000
007265 88305.0000
007242 6866.0000
007263 2246.0000
7.0000
3.8000
3.1500
2.7500
3.0000
3.0000
2.5000
2.5000
8.0000
5.0000
2.1000
20.0000
2.6000
2.0000
26.5000
12.0000
13.0000
20.0000
4.5700
5.0000
10.8000
8.0000
9.0000
10.0000
11.0000
6.0000
10.0000
2.5000
2.7500
15.2500
13.0000 11.0000
3.0000 3.5000
3.0000 4.7000
2.1000 2.0000
5.9000
1.6000 3.5000
2.2500 2.5000
7.0000 8.5000
6.8500 6.9000
3.0000 2.5000
25.0000 19.0000
3.7500 5.0000
5.0000 4.0000
18.0000 15.0000
24.0000
25.0000 19.0000
6.3500 4.9000
4.5000 8.0000
8.0000 10.0000
15.0000 9.0000
6.0000 6.0000
5.5000 7.0000
14.0000 20.0000
5.0000 6.0000
8.0000 8.0000
3.3000 3.2500
3.5000 2.3000
10.0000
Apr 23, 2008
Apr 16, 2008
Apr 09, 2008
Feb 27, 2008
Feb 21, 2008
Feb 13, 2008
Feb 13, 2008
Feb 06, 2008
Jan 24, 2008
Dec 12, 2007
Nov 28, 2007
Nov 07, 2007
Oct 17, 2007
Sep 06, 2007
Jun 20, 2007
May 23, 2007
May 23, 2007
May 09, 2007
May 09, 2007
May 02, 2007
Apr 18, 2007
Apr 11, 2007
Mar 28, 2007
Mar 21, 2007
Mar 14, 2007
Mar 07, 2007
Feb 14, 2007
Feb 07, 2007
Feb 07, 2007
Jan 31, 2007
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item =5711 &xRegion =l 9/12/2013
Unit Bid Analysis - Standard Items Report Page 1 of 1
j
_ Nrws sureh Confect VVBDOT VADOT Ho ji
Bid Item Unit Price Tabulation Standard Items
Region: Northwest Contracts awarded from 9/16/2008 thru 9/16/2013
3-17-UNWOU-S. TACK C,04-7r
Standard
Item Unit of
Number Measure Item Description
5340
TON
ASPHALT FOR FOG SEAL
5340
TON
ASPHALT FOR FOG SEAL
5340
TON
ASPHALT FOR FOG SEAL
5340
TON
ASPHALT FOR FOG SEAL
5340
TON.
ASPHALT FOR.FOG SEAL
5340
TON
ASPHALT FOR FOG SEAL
5340
TON
ASPHALT FOR FOG SEAL
5340
TON
ASPHALT FOR FOG SEAL
NWR AVERAGE LOW BID is $896.35
State AVERAGE LOW BID is $611.94
Total records found: 8
Job
Contract
Planned Low Second Third
Number
Number
AD Date Quantity
Bid Bid Bid
08AO09
007621
10/6/2008 3.50
$1,150.00 $2,500.00 $1,150.00
08A022
007630
10/27/2008 4.35
$2,750.00 $1,750.00 $1,200.00
09A011
007738
4/13/2009 1.97
$1,250.00 $1,800.00 $1,200.00
09A023
007856
11/16/2009 1.70
$1,225.00 $1,224.00 $1,350.00
1OA005
007902
2/16/2010 4.06
$665.00 $800.00 $4,500.00
1OA019
008048
1118/2010 36.60
$595.00 $585.00 $450.00
1OA061
008116
3/21/2011 0.70
$1,200.00 $5,000.00 $2,000.00
12AO03
008271
3/19/2012 0.43
$4,500.00 $6,500.00 $0.00
Copyright WSDOT © 2001 Traffic & Roads I Site Index I Contact WSDOT I WSDOT Business I WSDOT Home
http:// www. wsdot. wa .gov/biz/contaa/uba/sreport.cfm 9/16/2013
UBA History of Item 0230 EASTERN Region Page 1 of 8
i�Mvre &arch Contest W8OOT I MODOT Flame
Unit Bid Analysis History
for Standard Item 5767
?� MA d. %2 PG 6 4 -2 2
in the NORTHWEST Region
To view the detail information for a specfic contract click on Contract Number
Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date
008461
3416.0000
77.0000
77.5000
80.0000
Apr 24, 2013
008457
6210.0000
69.2500
88.0000
100.0000
Apr 24, 2013
008438
4630.0000
77.0000
Apr 10, 2013
008445
4850.0000
70.5000
70.0000
76.0000
Apr 03, 2013
008423
610.0000
93.0000
95.0000
88.0000
Apr 03, 2013
008439
13230.0000
77.0000
77.0000
84.0000
Mar 27, 2013
008436
380.0000
95.0000
100.0000
100.0000
Mar 27, 2013
008414
1242.0000
138.0000
120.0000
115.0000
Mar 13, 2013
008416
760.0000
132.0000
Feb 21, 2013
008418
5696.0000
80.0000
78.0000
79.0000
Feb 21, 2013
008403
160.0000
140.0000
166.0000
146.0000
Jan 24, 2013
008' )97
35.0000
370.0000
325.0000
250.0000
Jan 09, 2013
008381
626.2000
136.0000
137.0000
135.0000
Dec 12, 2012
008379
764.0000
102.0000
82.0000
100.0000
Nov 15, 2012
008363
5645.0000
67.0000
65.0000
74.7500
Sep 19, 2012
008314
2223.0000
108.5000
120.0000
130.0000
Jun 06, 2012
008307
190.0000
130.0000
125.0000
115.0000
May 31, 2012
008290
4918.0000
78.0000
84.2000
85.0000
May 23, 2012
008286
15517.0000
65.0000
66.0000
68.0000
May 09, 2012
008268
7520.0000
63.0000
70.6000
66.0000
Apr 18, 2012
008269
370.0000
102.0000
107.0000
110.0000
Apr 11, 2012
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 5767 &xRegion =l 9/13/2013
UBA History of Item 0230 EASTERN Region
008258 308.0000 145.0000 120.0000 103.0000
008236 625.0000 98.0000 105.0000 110.0000
008222 10127.0000 68.0000 68.0000 68.0000
0081.70 309.0000 93.0000
008140 50450.0000 57.0000 55.0000 56.0000
008142 3509.0000 80.0000 80.0000 74.5000
008141 7540.0000 88.0000 79.5000 90.3000
008128 77876.0000 55.0000 71.0000 50.0000
008130 1160.0000 130.0000 139.1000 135.0000
008116 10003.0000 68.5000 70.0000 69.0000
008114 5860.0000 68.0000 68.0000 72.0000
008112 8574.5000 62.0000 58.0000 67.0000
008103 10580.0000 78.0000
008101 1065.0000 77.0000 80.0000 80.0000
008099 1423.0000 75.0000 75.0000 80.0000
008089 270.0000 82.9500 82.0000 83.0000
008086 4389.0000 79.7200 78.0000 80.5000
008077 7300.0000 58.5000 62.0000 70.0000
008053 8024.0000 60.0000 63.0000 62.0000
008060 2045.0000 67.0000 67.0000 72.0000
008065 5304.0000 65.9000 65.9000 66.0000
008055 2999.0000 70.0000 70.0000 73.3000
008052 3891.0000 80.0000 75.0000 77.0000
008051 2720.0000 76.0000 78.8500 95.8000
008035 4410.0000 69.7500
008012 3680.0000 64.0000 65.2500 65.0000
007962 4815.0000 75.0000 67.0000 71.0000
007968 184.0000 112.0000 125.0000 125.0000
007945 25624.0000 60.5000 59.0000 60.0000
007936 25468.0000 61.0000 59.9000 59.9000
007948 6830.0000 61.0000 62.0000 68.0000
Page 2 of 8
Mar 28, 2012
Jan 11, 2012
Nov 09, 2011
Jun 22, 2011
Jun 08, 2011
May 18, 2011
May 18, 2011
May 18, 2011
May 04, 2011
Apr 27, 2011
Apr 20, 2011
Apr 13, 2011
Apr 06, 2011
Mar 23, 2011
Mar 16, 2011
Mar 09, 2011
Mar 02, 2011
Feb 02, 2011
Feb 02, 2011
Jan 12, 2011
Jan 12, 2011
Jan 05, 2011
Jan 05, 2011
Dec 15, 2010
Nov 17, 2010
Oct 20, 2010
Jul 14, 2010
Jun 30, 2010
Jun 23, 2010
Jun 09, 2010
Jun 09, 2010
http:// www. wsdot. wa. govfbiz/contaa/uba/ubahist.cfm? &Item = 5767 &xRegion =l 9/13/2013
URA History of Item 0230 EASTERN Region Page 1 of 12
t NMon I s.arah I Contact vM800r I wsoor Hong.
CONTRACT A AWARD
Unit Bid Analysis History
for Standard Item 6882 r[R' 0 ��IW T' Rll�i s)5p
in the NORTHWEST Region
To view the detail information for a specfic contract click on Contract Number
Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date
008508
1.7000
550.0000
650.0000
682.5000
Jul 24, 2013
008457
0.5400
600.0000
700.0000
500.0000
Apr 24, 2013
008439
7.6600
550.0000
325.0000
425.0000
Mar 27, 2013
008436
4.8000
300.0000
300.0000
380.0000
Mar 27, 2013
008414
1.3000
750.0000
870.0000
750.0000
Mar 13, 2013
008416
18.4000
200.0000
Feb 21, 2013
008418
1.0000
405.0000
390.0000
380.0000
Feb 21, 2013
008381
0.8000
437.0000
425.0000
600.0000
Dec 12, 2012
AA
10,20
g,Kg
I /as'd
008307
40
0.00
1020.0000
950. 000
1150.0000
May 31, 2012
008290
9.5000
350.0000
350.0000
400.0000
May 23, 2012
008286
9.0800
380.0000
225.0000
250.0000
May 09, 2012
008211
1.7400
1200.0000
2100.0000
1050.0000
Sep 08, 2011
008170
0.7400
575.0000
Jun 22, 2011
008142
0.4000
320.0000
330.0000
320.0000
May 18, 2011
008128
524.0000
165.0000
170.0000
165.0000
May 18, 2011
008114
87.9000
225.0000
160.0000
145.0000
Apr 20, 2011
008103
13.0000
182.0000
Apr 06, 2011
008099
2.5200
285.0000
320.0000
285.0000
Mar 16, 2011
008055
7.0000
185.0000
350.0000
185.0000
Jan 05, 2011
008052
2.0000
450.0000
320.0000
470.0000
Jan 05, 2011
008051
34.1600
160.0000
160.0000
165.0000
Dec 15, 2010
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 6882 &xRegion =l 9/12/2013
UBA History of Item 0230 EASTERN Region
Page 1 of 10
4
Nava S"rah I Contact WWOT I WSDOT H�na
Unit Bid Analysis History
for Standard Item 6806 Ml rJ r L UE
in the NORTHWEST Region
To view the detail information for a specfic contract click on Contract Number
Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date
008508
4160.0000
1.1000
0.8000
0.8500
Jul 24, 2013
008457
22605.0000
0.2500
0.3000
0.2000
Apr 24, 2013
008438
24150.0000
0.1600
Apr 10, 2013
008423
17220.0000
0.3000
0.3000
0.3000
Apr 03, 2013
008439
49870.0000
0.1500
0.2200
0.1500
Mar 27, 2013
008436
1500.0000
1.0000
1.2500
1.0000
Mar 27, 2013
008414
9570.0000
0.4000
0.5000
0.4000
Mar 13, 2013
008397
174.0000
3.5000
3.1500
3.0000
Jan 09, 2013
008381
120.0000
1.1000
1.0500
1.2500
Dec 12, 2012
008384
1300.0000
1.0000
2.2000
2.0000
Nov 07, 2012
008363
6435.0000
0.3500
0.3000
0.3000
Sep 19, 2012
008314
200880.0000
0.1100
0.1500
0.2500
Jun 06, 2012
008290
6230.0000
0.5000
0.5000
0.6000
May 23, 2012
008286
44150.0000
0.2500
0.1500
0.1500
May 09, 2012
008271
45950.0000
0.2000
0.2000
Apr 18, 2012
008269
1330.0000
1.0000
1.0000
0.9500
Apr 11, 2012
008258
12160.0000
0.1500
0.2800
0.1200
Mar 28, 2012
008222
13380.0000
0.2500
0.2600
0.2500
Nov 09, 2011
008223
1500.0000
1.1500
1.1500
1.2500
Nov 02, 2011
008170
875.0000
1.2500
Jun 22, 2011
008141
7730.0000
0.2500
0.4000
0.3200
May 18, 2011
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 6806 &xRegion = l 9/12/2013
UBA Histor
ti
008128
008130
008116
008113
008112
008103
008099
008089
008077
008053
008065
008060
008052
008051
008048
008035
008012
007962
007968
007949
007951.
007938
007940
007941
007920
007916
007917
007911
007902
007875
007873
y of Item 0230 EASTERr
95250.0000 0.1400
2400.0000 0.4500
84745.0000 0.1400
13140.0000 0.5000
43000.0000 0.1600
23114.0000 0.2000
2542.0000 0.5000
1503.0000 1.1500
12220.0000 0.3500
9000.0000 0.2500
14280.0000 0.1300
3600.0000 0.7500
14970.0000 0.2500
760.0000 0.5000
85060.0000 0.1500
13660.0000 0.2500
7760.0000 0.3000
18560.0000 0.2500
2910.0000 0.2500
2910.0000 0.2200
7880.0000 0.3000
19285.0000 0.1800
2000.0000 0.2500
630.0000 1.6000
23935.0000 0.2000
2300.0000 0.5000
4056.0000 0.2500
5240.0000 0.2700
115140.0000 0.1500
6490.0000 0.2000
2280.0000 0.5000
1 Region
0.1500
0.4800
0.1400
0.3500
0.1500
1.0000
0.6000
0.3500
0.2600
0.1300
0.4800
0.5000
0.4500
0.1400
0.2900
0.2500
0.2200
0.3000
0.2800
0.2500
0.2500
1.6000
0.2000
0.5300
0.2300
0.5300
0.2000
0.2000
0.5000
0.1500
1.0000
0.1400
0.3200
0.2200
0.5000
0.5000
0.5000
0.2800
0.1500
0.5000
0.2600
0.5500
0.1400
0.3000
0.2500
0.5000
0.2500
0.2500
0.1800
0.3000
2.0000
0.2500
0.3500
0.3000
0.2700
0.1200
0.2100
0.5000
Page 2 of 10
May 18, 2011
May 04, 2011
Apr 27, 2011
Apr 20, 2011
Apr 13, 2011
Apr 06, 2011
Mar 16, 2011
Mar 09, 2011
Feb 02, 2011
Feb 02, 2011
Jan 12, 2011
Jan 12, 2011
Jan 05, 2011
Dec 15, 2010
Dec 08, 2010
Nov 17, 2010
Oct 20, 2010
Jul 14, 2010
Jun 30, 2010
Jun 03, 2010
Jun 03, 2010
May 26, 2010
May 12, 2010
May 05, 2010
May 05, 2010
Apr 14, 2010
Apr 14, 2010
Mar 31, 2010
Mar 10, 2010
Feb 03, 2010
Jan 27, 2010
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 6806 &xRegion =l 9/12/2013
UBA History of Item 0230 EASTERN Region Page 1 of 2
r
Nay Search I Contact 1MSCOT I tMSDOT Home
CONTRACT AD & AWARD
Unit Bid Analysis History
for Standard Item 6858
in the NORTHWEST Region
S i O L,I N C
To view the detail information for a specfic contract click on Contract Number
Contract Planned Qty Low Bid 2nd Bid 3rd Bid Bid Open Date
008423
32.0000
16.2500
17.0000
15.0000
Apr 03, 2013
008271
100.0000
5.0000
6.0000
4.0000
Apr 18, 2012
008130
24.0000
10.0000
10.7000
15.0000
May 04, 2011
008116
203.0000
5.0000
5.0000
5.0000
Apr 27, 2011
007920
430.0000
3.0000
2.0000
2.2500
May 05, 2010
007911
60.0000
3.5000
4.7300
4.0000
Mar 31, 2010
007859
007342
007242
007127
006992
006665
006702
006543
006523
006294
006090
70.0000 5.0000 5.0000 5.0900
57.0000 2.0000 2.0000 2.2500
232.0000 3.0000 3.3000 3.2500
44.0000 2.7000 3.0000 3.0000
55.0000
5.0000
4.0000
4.0000
99.0000
1.6000
5.0000
5.0000
41.0000
5.0000
4.0000
5.0000
25.0000 11.0000
73.0000 3.5000 4.0000 4.0000
297.0000 2.2800 2.0000 2.0000
24.0000 10.0000 10.0000
Jan 27, 2010
May 09, 2007
Feb 07, 2007
Apr 26, 2006
Jun 15, 2005
Apr 14, 2004
Jan 14, 2004
Apr 02, 2003
Mar 26, 2003
Mar 20, 2002
May 09, 2001
WSDOT Home I Unit Bid Analysis / Standard Item Table Inquiry
Send Questions or comments about this page to Proiect Development.
Washington State Department of Transportation.
Page last updated September, 1996
Data is updated monthly
hq: / /www. wsdot. wa. gov /biz/contaa/uba/ubahist.cfm? &Item = 6858 &xRegion =l 9/12/2013
UBA History of Item 0230
EASTERN Region
Page 3 of 8
007949
184.0000
125.0000
171.0000
156.0000
Jun 03, 2010
007938
18720.0000
69.0000
72.0000
70.0000
May 26, 2010
007940
220.0000
95.0000
90.0000
105.0000
May 12, 2010
007941
312.0000
86.0000
86.0000
90.0000
May 05, 2010
007921
4460.0000
62.0000
73.0000
73.5000
May 05, 2010
007920
17447.0000
64.0000
60.8500
62.1000
May 05, 2010
00791.6
4440.0000
84.0000
88.1000
84.0000
Apr 14, 2010
007847
15921.0000
77.0000
100.0000
80.0000
Apr 14, 2010
007917
1854.0000
66.0000
73.9300
70.0000
Apr 14, 2010
007919
46.0000
170.0000
171.0000
181.0000
Apr 07, 2010
007911
1650.0000
83.0000
87.1500
85.0000
Mar 31, 2010
007870
2990.0000
88.0000
90.0000
88.0000
Feb 10, 2010
007875
3115.0000
77.0000
79.0000
80.5100
Feb 03, 2010
007859
12112.0000
61.8000
61.5800
64.2600
Jan 27, 2010
007874
6260.0000
75.0000
80.6500
77.0000
Jan 27, 2010
007856
3634.0000
75.0000
74.6100
80.0000
Dec 16, 2009
007860
320.0000
164.7500
165.0000
Dec 16, 2009
007843
3570.0000
88.2000
84.0000
91.0000
Nov 18, 2009
007801
270.0000
300.0000
220.0000
250.0000
Ju122, 2009
007781
40.0000
350.0000
Jun 24, 2009
007775
82.0000
110.0000
235.0000
156.2500
Jun 10, 2009
007752
11931.0000
65.0000
68.0000
70.0000
Jun 10, 2009
007753
12400.0000
69.0000
67.0000
May 28, 2009
007754
250.0000
100.0000
82.0000
120.0500
May 20, 2009
007765
310.0000
110.0000
135.0000
110.0000
May 20, 2009
007738
10471.0000
66.0000
70.0000
70.0000
May 06, 2009
007742
323.0000
100.0000
130.0000
150.0000
Apr 29, 2009
007741
315.0000
115.0000
130.0000
142.0000
Apr 29, 2009
007717
1210.0000
81.5000
81.0000
90.0000
Apr 15, 2009
007699
351.0000
135.0000
141.0000
135.0000
Mar 25, 2009
007671
11030.0000
73.0000
71.0000
71.0000
Mar 11, 2009
http:// www. wsdot. wa. gov/biz/contaa/uba/ubahist.cfm? &Item = 5767 &xRegion =l 9/13/2013
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
AIRPORT IMPROVEMENT PROGRAM
CONTRACT CHANGE ORDER NO, 2 or SUPPLEMENTAL AGREEMENT NO.
AIRPORT S03 Ashland Nfuniepal Airport DATE 8 -23 -2011
LOCATION Ashland Oregou AP PROJECT N0, 3- 41- 0002 -09
CONTRACTOR Knife River Materials
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the engineer:
Item
No. Description Unit Unit Price Quantity Amount
+ I=AA- F-ligible Items 1 through 3 T _
1
Petro Tac Fabric at Cracks in Overlay Area
LF
$2,00
1 I 90
®W
$2,160.00
= i080Sr--�7l
2
Unsuitable Excavation
CY
$10.00
3855.36
$38,553.60
3
Quarry Spalis
TN
$16.00
5160.17
$82,562.72
FAA-Eligible Subtotal
Date
$123,276.32
Non- Eligible Items 4 through 6
_
~�4
Replacement P -154 at Overexcav Areas
CY
$30.00
577
$17,310.00
Y 5
Rehandle P -154 at Overexcav Areas T
LS
$1,371.27
1
$1,371.27
6
Additional QC - resting
LS
$2,000.00
1
$2,000.00
Non - Eligible Subtotal
$20,681.27
- ^ All Items Total
$143,957,59
Previous Change Order s Total
$27,640.00
Revised Contract Total
$1,457,566.59
The time provided for completion in the contract is unchanged. This document shall become an
amendment to the contract and all provisions of the contract will apply.
Recommended by:
Engineer /
Date
Approved by:
0w ndv : !
Date
Accepted by:
r NAG( 0. ROSS
.... CHARM
�...0`antractor t VUEE €STWUR
Date
Cuncun•ed by:
Stag Aeronautics (if appjlcabl�}
Date
Approved by:
Federal Aviation Administration
Date
Cd/l t15(�S 1 ON 7-0 -V`sY
12, 1 (.0
k 19.at0 sv
120 sV
05y