CHANGE ORDER # 4
AIRPORT.- Renton Municipal Airport DATE: 8 -07 -13 -
LOCATION. Renton, Washington GRANT #: 3-53- 0055 -024
CONTRACTOR: ICON Materials
This change order was prepared in accordance with FAA Program Guidance Letter 12 -03. A price
analysis was prepared and it is recommended that the FAA accept the analysis as evidence of
cost reasonableness.
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the Engineer:
Item Description
Additional Erosion Control and
FOD Barrier. Adjust unit bid
price for item 3 -34 (Temporary
Erosion Control — Force
1 Account)
Subtotal
State Sales Tax (9.5 %)
This Change Order Total
Previous Change Order Amount
Original Contract Amount
.Revised Contract Total
Recommended by.,
Approved by:
Accepted by:
Accepted by
Unit Unit Price Quantity Amount
F.A. $17,290.78 1
3r, Reid Middleton, Inc.
Owner,
Aviation Administration
$17,290.78
$17,290.78
$1,642.62
$18,933.40
($- 30,526.97)
$5.460.424.21
$5,448,830.64
Date:
Date:
Date: h3/11
Date: , 3
f-( }GOCWApO01007 Rentat17 TO/ B & Sigoa0e?',so „ti, Taxiway Construction \Change Orders \CO 4.docx
i
I
}
0 - � .0
CHANGE ORDER # 4
AIP PROJECT NO. 3 -53- 0055 -024
AIRPORT Renton Municipal Airport LOCATION Renton, WA
JUSTIFICATION FOR CHANGE
This justification for change was prepared in accordance with FAA Program Guidance
Letter 12 -03
1. Brief description of the proposed contract change(s) and locations(s).
This change order consists of the following:
1. Provide and install WSDOT type concrete barrier along the eastern edge of Phasae
3 and 4.
2. Provide and mount geotextile fabric to the top of the concrete barrier.
3. Deliver and install on Friday, August 2 in coordination with the beginning of
Phase 3 activities.
Items #1 through #3 above will be paid for through current Bid Item No. 3 -34
(Temporary Erosion Control — Force Account).
Design Directive #8 (attached) was issued on August 1, 2013 documenting these
revisions.
2. Reason(s) for the change(s) (Continue on reverse if necessary).
During the Weekly Construction Meeting on July 30, 2013, Boeing staff expressed
concern about protecting 737 aircraft staged in the hardstand areas adjacent to Phases
3 and 4 of the project. They had specific concerns about construction stormwater
impacts and FOD migration during asphalt grinding and concrete panel removal.
Their staff requested installation of a barrier to provide physical separation of the
hardstand from the work areas. In response to this concern, implementation of FOD.
barriers between construction activities and the adjacent ramp are necessary.
Because of the specific request by Boeing of a FOD barrier, this is regarded as a
"Means and Measures" direction that is eligible for compensation beyond the bid item
"Temporary Erosion Control — Force Account ".
Justifications for unit prices or total cost:
Justification was prepared in accordance with FAA program guidance letter 12 -03.
4. The sponsor's share of this cost is available from: Port Funds
5. If this is a supplemental agreement involving more than $2,000, is the cost estimate
based on the latest wage rate decision? Yes No NA X
6. Has consent of surety been obtained? Yes Not Necessary X
7. Will this change affect the insurance coverage? Yes No X
H:iDOC123Ap17MOW Renton TvV B & stgnagel'souffi Taxiway Construction \Change Orders \CO 4.docx
9.. Has this Change Order been discussed with FAA Officials?
Yes X No When 08/01/13 With Whom Peter Doyle
H 00C23ApO0t007 Renton 7'VV 8 & SignageVSotdh Taxiway Construction \Change Orders \CO 4.docx
DESIGN DIRECTIVE
DD Number: S
Owner: Renton Municipal Airport Contract No. 3 -53- 0055 -24
Contractor: ICON Materials
Engineer: Reid Middleton, Inc: Engineer's File No.: 232010.007.005
Project: Taxiway B System Rehabilitation : South Portion Reconstruction
Specification Section: P -160 Para.: _ Drawing Ref: Detail:
At the request of Boeing staff during the Weekly Construction Meeting of 30 -July -2013, the Engineer has directed ICON to
provide additional erosion control and FOD protection to control sediment and FOD migration during Phase 3 and Phase 4
activities in front of the Boeing handstand positions.
The additional erosion control and FOD protection measures agreed to consist of the following:
• Provide and install WSDOT type concrete barrier along the eastern edge of Phases 3 and 4..
• Provide and mount geotextile fabric to the top of the concrete barrier.
• Deliver and install on Friday, August 2 in coordination with the beginning of Phase 3 activities.
This work item shall be paid for under bid item "Tempoary Erosion Control Force Account ". Bid item quantity adjustments per
schedule will be reconciled as part of progress estimate adjustments. Contractor shall submit intended adjustments to individual
bid items for reconciliation with engineer.
Signed by:
RESPONSE (Select one)
No Cost Change Order
XChange Order with Cost Adjustment Anticipated
Date: 8/01/13
Attached is ICON's Cost Proposal for Design Directive #8. The work for this DD
will be performed under Bid Item #334 (Temp Erosion Control Force Account)
Response from: Chuck COffey
Attachments
Date Returned: August 1, 2013
h:\doc\ forms \construction\izone\tequest for interpretation.doc
cc: Owner
Reid liddleton
a (ei E
ICC)� iats
; 1508 Vatenfine Ave. SE
kd
Fad is IVA 98047
(206 5"75-3:200 0 Fax (206) 575 -0319
v iconmaterials.com
Cost: Detail with Categories
Project Name.:
Renton Airport Taxiway "B"
Customer.:
City Of Renton.
lob Number:
513302
Billing Address:
3555 -NE 2ND STREET
Bid As:
PRIME
Direct Cost
Renton, WA 98056
Estimator:
David Gent
Phone:
425430 =7400
Project Address:
Renton, WA
Contact:
$17,290.78
Completion Date:
.300.00 SY
Control Force Account (FOD
$417.00
Soil Stabilization Fabric
300X0 SY
$6.71.
Unit
Total
Description
Quantity UM
Direct Cost
Direct Cost
Unit Price
Total Price MU%
$60.94
135 - 334- Tomp Erosion
1.00 LS
$15,118.76
$15;118.76
$17,290.78
$17,290.78
.300.00 SY
Control Force Account (FOD
$417.00
Peterson Bros:
1.00 LS
$12,690.00
$12,690.00 }obcostlo:
Orginal Install 450' Barrier With
Barrier)
Extended':P'ins $6,865.00
Ldta EquiFnient
Material
Subcontracted
Trucking
Miscellaneous
Unit: $1,739.76 $272.00
.$417:00
$12,690.00
$0,00
$0.00
$000
Total; $1,739.76 $272.00
$417.00
$12,690.00
$0.00
$0.00
$0.00
CEC - 7/31/2013 11:10 AM: ICON Markup as follows:
Labor @299%= $504.S3
Equip: 021 %0 = $57.12
Material@210 /a= $87:57
Subcontracted @12%= $1:522.80
Total- Allowable.Markup $2,172.02
Z Geotextile Fabric
300.00.SY
$8.10
$2,428.76
]obCostID: 50.352
L;ilI41 EouirJment
Material.
Subcontracted
Ituckin.9
Miscellaneous
Ewa
Unit;. $5:80 $0.91
$1.39
$0.00
$0.00
$0.00
$0:00
Total $11739.76 $272.00
$417.00
$0.00
$0.06
$0.00
$0.00'
Soil Stabilization Fabric
300X0 SY
$6.71.
$2,011.76
(18'.75$Y /PH, 2.00 DY)
1 Tn Flatbed.
16.00 HR
$17.00
$272.00
Operator
16.00 HR
$60.94
$975.11
Laborer
16.00 HR
$47.79
$764.65
G Mirafi 140N Woven Fabric
.300.00 SY
$1.39
$417.00
Peterson Bros:
1.00 LS
$12,690.00
$12,690.00 }obcostlo:
Orginal Install 450' Barrier With
Extended':P'ins $6,865.00
Reset Of Conic Barrier Onsite
$5,805.00
7/31/201311:14 :37 AM Pagel or 2.
r
7/3iJ2013 11:14:37 AM Renton Airport Taxiway V Page of 2
Percent of
Percent of
Bid Price
Amount
Direct Cost
,-�
Labor:
$1,139.76
11.51%
Totat DC Adds /Cuts:
Equipment Owned:
$272.00
1.80%
Equipment Rented:
$0.00
0.000/0
Materials Owned;
$0.00
0.000/0 -
0.000/
Materials Purchased;
$417.00
2.76%
$15,118.76
Subcontracted:
$12,690.00
83.940/o
Totau overhead:
Trucking:Owned:
$0.00
0.000/0
Trucking: Hired:
$0.00
0.000/0
Miscellaneous:
$0.00
0.000/0
12.56070
Plug:
$0.00
0.000/0,
$17,290.78
Direct Cost:
$15,118.76
r
7/3iJ2013 11:14:37 AM Renton Airport Taxiway V Page of 2
Percent of
Amount
Bid Price
Total Direct Cost:
$151118.76
87.44%
Totat DC Adds /Cuts:
$0.00
0.00%
Total Indirect Cost:
$0.00
0.00%
Total Bond:
$6.00
0.000/
Total Overall Cost:
$15,118.76
87.44°70
Totau overhead:
$0.00
0.000/0
Total Profit:
$2,172.02
12.560/0
Total Margin:
$2,172.02
12.56070
Total, Bid Price:
$17,290.78
r
7/3iJ2013 11:14:37 AM Renton Airport Taxiway V Page of 2
PMU" FW �C o 144H..
200$ EAST VALLEY HIGHWAY
SUMNER, WASHINGTON 98390
(253) 833 -2644 (253) 863 -8136
FAX (253) $63 -5981
.Contractors # CC -01 :PETERB1187M
Project Nainet RENTON.AIRPORT BARRIER BID DATEh
Item Platt DESCRIPTION
QTy� TOTAL.
1_ 451100 LF; TEMPORARY CONCRETE BARRIER 5 gg5 0p::
APPROX 2, MONTHS RENTAL
SUPPLY EXTENDED BARRIER PINS .FOR:CUSTOMER TO INSTALL FOD FABRIC
2 90.0.00: LP RESET TEMP. CONC: BAR. ON JOBSITE WITRUCJ<S $
.:253- 261 -4440
Email: baWk oldcaslletetaterials.com
TOTAL $ 126:90.O.tl`
"Price doeutot`inaldde.tratfic control-watess specified.
** Prices: include material do iastaUation, bond aad- ingpurance. Beam Guardrail is.available in 12:5' and $:25' leagths. L.
* *Prices, i re good if confract is received within 30 days after award of john after 30 days prices must be.zen'ego,4iated;
.IF ACCEPTED PLEASE SIGN AND FAX BACK TO 253- 863 =5951
NO WORK WILL BE PERFORMED WITHOUT PROPER AUTHORIZATION,
Dale:
Title•
Company Name: Phone::,
Address: Fax:
•
7
Renton Airport
Change Order Cost Analysis /Backup for Taxiway B System Rehabilitation — South Portion
Change Order #4
This cost analysis is prepared in compliance with Program Guidance Letter 12 -03. Comparative costs
have been taken from bid prices for other projects, from construction cost guides and from quotes from
suppliers. The quantities to complete each of the activities listed below are small in comparison to the
quantities for a typical project, therefore unit prices for the items listed will be higher than expected for
a large quantity.
1) Provide and Install Additional Erosion Control and FOD Barrier
This activity consists of the following tasks.
• Rental of Temporary Concrete Barrier
Review of the unit prices for temporary concrete.barrier indicates that unit prices within the WSDOT
Northwest Region (King County) for comparable quantities of barrier range from $10.00 per LF to $20.00
per LF. Total cost for 450 LF of temporary concrete barrier can be expected to range between $4,500
and $9,000.
The Contractor's unit price of $15.30 per LF results in a cost $6,885.
0 Reset Temporary Concrete Barrier on Jobsite with Trucks
Review of unit prices for Removing and Resetting Existing Permanent Concrete Barrier (a comparable
item of work) indicates that unit prices within the WSDOT Northwest Region (King County) for
comparable quantities for removing and resetting concrete barrier range from $3.00 per LF to $8.00 per
LF. Total cost for 900 LF of removing and resetting concrete barrier can be expected to range between
$2,700 and $7,200.
The Contractor's unit price of $6.45 per LF results in a cost of $5,805.
• Geotextile Fabric
Review of unit prices for Construction Geotextile for Soil Stabilization indicates that unit prices within
the WSDOT Northwest Region (King County) for comparable quantities of geotextile fabric have an
average price ranging from $2.00 per Square Yard to $3.00 per Square Yard. The total cost for 300 SY of
geotextile fabric can be expected to range between $600 and $900.
The Contractor's unit price of $1.39 per SY results in a cost of $417.
• Labor
This item is for the labor to mount the geotextile fabric onto the concrete barrier. Labor consists of one
flatbed truck operator and one labor for installation of fabric, removal and reinstallation of the fabric as
part of removing and resetting the concrete barrier, and removal of the fabric at the time the concrete
•
barrier is removed from the site. Estimated manhours for the operator is 16 hours and for the laborer is
16 hours.
The labor rate of $60.94 for the operator and $47.79 for the laborer is less than the labor rate of $77.91
from the 2012 Friday Harbor Airport project.
The Contractor's labor cost for mounting of the geotextile fabric is $1,739.76.
• Equipment
Equipment consists of one flatbed truck to transport the geotextile to and from the project site, and to
move it from the Phase 3 work area to the Phase 4 work area. The Contractor estimates a total time of
16 hours use for performing these tasks with this piece of equipment.
The Contractor's unit price of $17.00 per hours results in a cost of $272.
The total cost for providing and installing additional erosion control and FOD barrier can be expected to
range from approximately $9,800 to approximately $19,000.
ICON's proposal for providing and installing additional erosion control and FOD Barrier
$15,118.76 plus allowable mark -ups
Conclusion: The requested change order amount is a fair and reasonable estimate for providing and
installing additional erosion control and FOD Barrier.
H:doc /23ap/10/007 Renton TW B & Signage /'south Taxiway Constr /Change Orders /Renton CO #4 Cost Justification.doc.mjc
Unit Bid Analysis - Standard Items Report Page 1 of 1
News Search Contact WSDOT I VVSDOT Home
Bid Item Unit Price Tabulation Standard Items
Region: Northwest Contracts awarded from 8/7/2009 thru 8/7/2013
Standard
Item Unit of
Number Measure Item Description
6784
L.F.
REMOVING AND RESETTING
$9.25
$10.00
EXISTING PERMA
1OA022
L.F.
REMOVING AND RESETTING
.6784
$7.00
EXISTING PERMA
6784
L.F.
REMOVING AND RESETTING
$6.50
$4.00
EXISTING PERMA
6784
L.F.
REMOVING AND RESETTING
$7.50
$7.50
EXISTING PERMA
6784
L.F.
REMOVING AND RESETTING
$7.95
$8.00
EXISTING PERMA
6784
L.F.
REMOVING AND RESETTING
$70.00 $72.00
$75.00
EXISTING PERMA
6784.
L.F.
REMOVING AND RESETTING
$8.00
$15.00
EXISTING PERMA
6784
L.F.
REMOVING AND RESETTING
$74.00
12AO13
EXISTING PERMA
6784
L.F.
REMOVING AND RESETTING
$206.80
EXISTING PERMA
NWR AVERAGE
LOW BID is $8.57
State AVERAGE LOW BID is $6.85
Total records found: 9
Job Contract Planned Low Second Third
Number Number AD Date Quantity Bid Bid Bid
1OA008
007948
4/26/2010 112.00
$9.25
$10.00
$8.50
1OA022
007949
5/10/2010!1,450.00
$4.00
$7.00
$6.10
1OA031
007968
6/14/2010 1;450.00
$6.50
$4.00
$7.00
1OA034
008128
4/4/2011 742.00
$7.50
$7.50
0.00
1 OA060
008142
4/25/2011 `745.00 7 '
$7.95
$8.00
$7.95
11 A024
008279
3/26/2012 80.00
$70.00 $72.00
$75.00
11AO09
008379
10/1/2012 874.00
$7.50
$8.00
$15.00
12AO22
008403
12/17/2012 116.00
$70.00 $25.00
$74.00
12AO13
008405
12/17/2012188.00
$7.00
$8.00
$206.80
Copyright WSDOT © 2001. Traffic & Roads I Site Index I Contact WSDOT I WSDOT Business I WSDOT Home
http:// www. wsdot. wa .gov/biz/contaa/uba/sreport.cfm 8/7/2013
Item Detail for Client # 7552
•
Selected DOT Code
DOT Code: 7552
CONSTRUCTION GEOTEXTILE FOR SOIL
STABILIZATION
Quantity: 300
Unit: SQYD
Page 1 of 1
•
CLOSE WINDOW ' PRINT
Detail * ** Ordered by LETTING DATE Ascendina " **
Lettin
Dateg
Contract/Pro'ect
1
Count
Name
❑�
Contractor Name
��a
Quanti
Unit
Price
Ext. Price
Multi -
H & H ENGINEERING
10/3/2012
8372 - 12ZO22
CONSTRUCTION,
225.0000
a
Fs YDCounty
Multi-
RAILWORKS TRACK
10/3/2012
8372 - 12Z022
County
�❑
SYSTEMS, INC.
225.0000
�
FSQYID
��
CONSTRUCTION,
4/3/2013
8444 - 110530
PIERCE:
]�CTIVE
C
761.0000
SQYD
$2.75
$2,092.75
4/3/2013 18444-11
=IQUIGG
BROS., INC.
761.0000
SQYD
$3.00
$2,283.00
4/3/2013 8444 - 11 C530 PIERCE
a
CONSTRUCTION, INC
761.0000
Fs QYD
❑�
ICON MATERIALS, A
4/312013 8444 - 110530 PIERCE
a
DIVISION OF CPM
761.0000
SQYD
$1.50
$1,141.50
A-1 LANDSCAPING AND
4/3/2013 0
8444 - 1105- PIERCE
a
CONSTRUCTION
761.0000
SQYD
$6.00
$4,566.00
4/3/2013 8444 - 110530 PIERCE
CECCANTI, INC.
761.0000
SQYD
$2.00
$1,522.00
4/3/2013 8444 - 110530 PIERCE
TUCCI & SONS, INC.
761.0000
SQYD
$2.00
$1,522.00
TOTAL
5,777.00
=
$2.86
$16,535.25
CLOSE WINDOW I PRINT
Filters Used:
Letting Date: 8/7/2012 - 817/2013
Quantity Range: 225 - 900
http:// www .bidhistory.com/DOTSDETAIL.ASP 8/7/2013
Item Detail for Client # 6781
Page 1 of 4
Selected DOT Code Unit Price Distribution Graph
DOT Code: 6781 s z,
TEMPORARY CONC. BARRIERS <,Msr
�
Quantity: 450 1.4 �F
+cS Fj'"I " j s t g
Unit: LNFT
td � ' � k i� a ••i .r ay S{�f i*bY � P'w,� � ., ,� g��� �, E� �Fli
5 r �
7 1200 � "`r-' k�. � fix., r �4•`6�:v1'"br� � y � � "fix I knWV��a�'��h�
Statlstical Summary 4f U
n Lei x d�Fny7 , y �y t1 �� o r N 0 ¢ 4
,,�y'
��^IIiiw�i FtY"`y �7
�
L7CYApy Fly f�. Y V^y ff y yr, j.)
I,'TµRAM�p:�
`,�'` t�
�,,}F 9i7�'^`�
!7� X r tl Rr
Z4 v4> �+ c`ksfs y y al
s 1 525 x$30 535% RAW'
s e uah�y*` r".lyT'`t�sk �t ��;�•±W ��,
rt' rtr.s a 3 �A1
u�lf�ElYldt`�/11 #57496. s AGE gttty,
.. , *,,ufasr r(ptian F2equlred x , . 4.: .... ,�U�]SCxI Ipt40t1��gklti�i, «ak� ;
CLOSE WINDOW 1 PRINT
Detail * ** Ordered by LETTING DATE Ascending * **
LDateg
8/22/2012
Contract/Project
8345 - 12X311
. County ]Fame
PACIFIC . I[,
—]
I Contractor Name
NCCARSELLA BROS.
Quantity
780.0000
Unit
LNFT
price
$16.50
Ext: Price
$12,870.00
8/22/2012
8345 - 12X31
I PACIFIC
QUIGG BROS., INC.
780.0000
LNFT
$20.00
$15,600.00
8/22/2012
8345 - 12X311
PACIFIC
1
❑
HAMILTON
780.0000
a❑
LNFT
$15.75
$12,285.00
CONSTRUCTION CO.
TAPANI
8/22/2012
8345 - 12X311
PACIFIC
1
UNDERGROUND,
780.0000
LNFT
$17.00
$13,260.00
INC.
MOWAT
8/22/2012
8345 - 12X311
PACIFIC
1
CONSTRUCTION
780.0000
LNFT
$19.00
$14,820.00
COMPANY
H STANDARD
8/22/2012
8345 - 12X311
PACIFIC
780.0000
[LNF]T
$20.00
$15,600.00
PAVIN
PAVING CO.
8/22/2012
8345 - .12X311
PACIFIC
a
....JJI
CASCADE BRIDGE
780.0000
LNFT
$20.00
��
$15,600.00
GRANITE
8/22/2012
8345 - 12X311
PACIFIC
1
CONSTRUCTION
780.0000
LNFT
$29.00
$22,620.00
COMPANY
GRANITE
9/19/2012
8363 - 11A020
SNOHOMISH
1
CONSTRUCTION
500.0000
LNFT
$8.00
$4,000.00
COMPANY
BRIDGE
9/19/2012
`8363 - 11A020
SNOHOMISH
]SELBY
500.0000
LNFT
$22.00
$11,000.00
COMPANY, INC.
9/19/2012
18363 - 11A020
SNOHOMISH
STR UCTURES, .
500.0000
a000
LNFT
$15.00
$7,500.00
9/19/2012
8363 - I IA0291
SNOHOMISH
7
5
hq:// www .bidhistory.com/DOTSDETAIL.ASP 8/7/2013
Item Detail for Client # 6781
Page 2 of 4
http:// www .bidhistory.com/DOTSDETAIL.ASP 8/7/2013
MOWAT
CONSTRUCTION
COMPANY
STRIDER
9/19/2012
8363 - 11A020 SNOHOMISH
1 CONSTRUCTION 500.0000 LNFT $17.00
$8,500.00
CO., INC.
INTERWEST
9119/2012
8363 - 11A020 SNOHOMISH
1 CONSTRUCTION, 500.0000 LNFT $14.00
$100010
INC.
9/19/2012
8363 - 11A020 SNOHOMISH
1 5010000 LNFT $15.00
$710010
CONSTRUCTION, INC
GUY R ATITINSO
9/19/2012
8363 - 11A020 SNOHOMISH
1 500.0000 LNFT $15.00
-$7,500.00
NORTHWEST
9/19/2012
8363 - 11A020 SNOHOMISH
1 CONSTRUCTION, 500.0000 LNFT $7.00
$3,500.00
INC.
9/19/2012 8363 - 11A020
SNOHOMISH
I
C.A. CAREY CORP.
500.0000
LNFT
$15.00
$7,500.00
AIN
9/19/2012 8363 - 11A020
SNOHOMISH
1
500.0000
LNFT
$14.75
$7,375,0
CONMOU T INC.
9/19/2W2 8363 - 11A020
SNOHOMISH
1
500.0000
LNFT
$13.50
$6,75400
CONSTRUCTION &
CARTER &
911912012 8371 - 12A011
KING
1
COMPANY, INC. DBA
425.0000
LNFT
$18.45
$7,841.25
CARTER
919/2012 8371 - 12A011
KING
I
C.A. CAREY CORP.
425.0000
LNFT $1610 $6100.00
MOWAT
9/19/2012 8371 - 12A011
KING
1
CONSTRUCTION
425.0000
LNFT $10.00 $4,250.00
COMPANY
AIN
9/19/2012 8371 - 12A011 .
KING
1
425.0000
LNFT $1410 $5,95010
CONMOU T INC.
INTERWEST
9/19/2012 8371-12A011
KING
1
CONSTRUCTION,
425.0000
LNFT $15.00 $6,375.00
INC.
9/19/2012 8371 - 121011
KING
1
425.0000
LNFT $20.00 $8,500.00
CONSTRUCTION LLC
9/19/2012 8371 - 12A011
KING
I.
LEGACY
CONTRACTING, INC.
4251000
LNFT $14.50 $116150
❑ ❑�
THOMP BROS
3/13/2013 8431 - 110527
CLALLAM
I
ON
856.0000
LNFT $15.00 $12,840.00
SETON
3/13/2013 8431 - 116527
CLALLAM
1
CONSTRUCTION,
856.0000
LNFT $14.74 $12,617.44
INC.
13/13/2013
8431 - 110527
CLALLAM
11
QUIGG BROS., INC.
856.0000
LNFT
$20.00
$17,12100
BRUCH & BRUCH .
3/13/2013
V31-110627
CLALLAM
1
CONSTRUCTION,
856.0000
LNFT
$2210
$18,832.00
INC.
3!13/2013
8431 - 116527
CLALLAM
111
1[
1 856.0000
L
http:// www .bidhistory.com/DOTSDETAIL.ASP 8/7/2013
Item Detail for Client # 6781
0 0
Page 3 of 4
http:/ Jwww .bidhistory.com/DOTSDETAIL.ASP 8/7/2013
PRIMO
CONSTRUCTION,
INC.
03/2013
8431-110527
CLALLAM
1
RAZZ
CONSTRUCTION,
856.0000
LNFT
$14.00
$11,98450
INC.
3/112W3118431
- 110527
CLALLAM
1
ROGNLIN S, INC
856.000011LNFTJ
$10.00
$11560.00
MOWAT
3/13/2013
8414 - 12AO21
KING
1
CONSTRUCTION
780.0000 LNFT
$16.00
. $12,480.00
COMPANY
INI&QW3
8414-12AO21
KING
11
C.A. CAREY CORP.
780.0000 LNFT
$15.00
$11,700.00
MJ HUGHES
3/13/2013
8414 - 12A021
KING
1
CONSTRUCTION,'
780.0000
LNFT $14.00
$10,920.00
INC.
3/13%2013
8414 - 1 2AO2
I KING
1
PEN HALL COMPANY 780.0000
LNFT
$18.00
$14,040.00
LP
3/13/2013
8414 - 12AO21
KING
1
CONSTRUCTSOS
780.0000
LNFT
$35.00
$27,300:00
3/13/2013
8414-12AO21
KING
1
CONTRACTORS, INC. 780.0000
LNFT
$14.50
$11,310.00
TRIMAXX
4/3/2013
8423 - 12A001
SKAGIT
1
CONSTRUCTION, 392.0000
LNFT
$23.00
$9,016.00
INC.
402013
8423-12A001
SKAGIT
I
TAPANI, INC.
3925000
LNFT
$2410
$9,40810
RAM
4/3/2013
8423 - 12A001
SKAGIT
1
CONSTRUCTION
392.0000
LNFT
$18.00
$7,056.00
GENERAL
IMCO GENERAL
4/3/2013
8423 - 12AO01
SKAGIT
1
CONSTRUCTION,
392.0000
LNFT
$7.00
$2,74410
INC.
INTERWEST
4/3/2013
8423 - 12A001
SKAGIT
1
CONSTRUCTION,
392.0000
LNFT
$2310
$991610
INC.
STRIDER
4/3/2013
8423 - 12A001
SKAGIT
1
CONSTRUCTION
392.0000
LNFT
$15.00
$5,880.00
CO., INC.
4/3/2W3
8423 - 12AO01
SKAGIT
1
BROS,INC.
3921000
LNFT
$2110
$8,23210
41/2013
8423 - 12AO01
SKAGIT
1
NCARSELLA BROS,
392.0000
LNFT
$20.40
$7,996.80
KNIK
4/3/2013
8423 - 12A001
SKAGIT
1
CONSTRUCTION
392.0000
LNFT
$60.00
$23,520.00
CO., INC.
KIEWIT
4/3/2013
8423 - 12AO01
SKAGIT
1
INFRASTRUCTURE
392.0000
LNFT
$30.00
$11,76010
WEST CO.
STEELHEAD
4/3/2013
8423 - 12AO01
SKAGIT
1
CONSTRUCTORS,
392.0000
LNFT
$23.00
$9,016.00
INC.
http:/ Jwww .bidhistory.com/DOTSDETAIL.ASP 8/7/2013
Item Detail for Client # 6781
•
•
Page 4 of 4
CLOSE WINDOW PRINT
Filters Used:
Letting Date: 817/2012 - 8/7/2013
Quantity Range: 225 - 900
http://www.bidhistory.coin/DOTSDETAIL.ASP, 8/7/2013
A -1 LANDSCAPING
4/3/2013
8423 - 12A001
SKAGIT
1
AND
392.0000
LNFT
$55.00
$21,560.00
CONSTRUCTION
8474 - 12C526
PIERCE
[IN ARSELLA BROS.
753.0000
LNFT
$1.00
$753.00
�
5/15/2013
8474 - 12C526
PIERCE
p CONTRACTING, INC.
753.0000
LNFT
$19.50
$14,683.50
5/15/2013
8474 - 12C5
I PIERCE
CECCANTI, INC.
753.0000
LNFT
$16.00
$12,048.00
5/15/2013 8474 - 12C5 I PIERCE 1 C.A. CAREY CORP.
753.0000
LNFT
$25.00
$18,825.00
5/15/2013 8474 - 12C526 PIERCE a CONTRACTING, INC.
753.0000
LNFT
$23.00
$17,319.00 I.
TOTAL
34,356.00
$18.13
$622,821..49
CLOSE WINDOW PRINT
Filters Used:
Letting Date: 817/2012 - 8/7/2013
Quantity Range: 225 - 900
http://www.bidhistory.coin/DOTSDETAIL.ASP, 8/7/2013