SUMMARY OF PROPOSED CHANGE:
CO -1A Rebuild Side Sewers
per EA
The existing side sewers consist of approximately 3 -foot sections of codcrete or clay pipe, and have collapsed
when excavating across them to install the new storm system. This item Is for the work to rebuild the side
sewer connection across the new storm system, when needed. If a side sewer needs to be reconstructed back
to the sewer main, Bid Item 31 will be used instead of this item.
The new side sewer connection will span the storm system trench and may extend several feet beyond the
trench as needed to rebuild and reconnect the side sewer. The work includes all costs for labor, equipment,
materials (including PVC pipe, fittings, elbows, and couplings) needed to rebuild each side sewer.
R.L. Alla provided a cost of $600.00 per each for rebuilding and reconnecting each side sewer.
C0-1B Side Sewer Cleanout Riser
Estimated Cost for Rebuild Side Sewer: $600.00 /EA x 20 EA = $12,000.00
per EA
This item is to provide and install a new side sewer cieanout riser and cover where needed and when directed
by the City. Cleanout Risers will be installed behind the sidewalk or pavement. Cleanout rises shall be per
City Standard Detail 407 and 403.1 (details attached). The work includes all costs for labor, equipment,
materials (including PVC pipe, fittings, couplings, cast iron ring and cover) needed for each Cleanout Riser.
R.L. Alia provided a cost of $250.00 per each for Side Sewer Cleanout Riser.
Estimated Cost for Side Sewer Cleanout Riser: $250.00 /EA x 8 EA = $2,000.00
ESTMATED TOTAL CHANGE ORDER COST = $14,000.00
Additional Working Days added to the Contract for this Change Order: none
ORIGINAL CONTRACT AMOUNT
CURRENT CONTRACT AMOUNT
ESTIMATED NET CHANGE
ESTIMATED CONTRACT
THIS ORDER
I
TOTAL AFTER CHANGE
$1,576,245.08
411gRL45.09
$14,000.00
$1,593,245.08
SIGNATURES:
Contractor:
Project Engines
Approved By:
Date: 12- '/$" 3
Date: 12-1,9-1-1
Date: / Y1 'I IS
H: \File Sys\SWP - Surface Water Projects\SWP-27 - Surface Water Projects (CIP)\27 -2306 NE Sth- Edmonds \1012 Change Orders \CO.1 FINAL Sidesewer
Rebulw.doc \DQP
Aj
RECESSED
LIFT POCKET
9" — 11 N.C. SOCKET HD
SCREW 1 X" LONG
(BRONZE OR S.S.)
Yt" z 2" RAISED PADS
KFIlmos ice" n r► l e e to
F1&"i SHrro,%^d n,5
- Topse:I aid sedgy ur
CGr,%vc ki
N 3"
6" CONCRETE
CLASS 3000 SAND OR
EXPANDABLE
FOAM
45' (1/8) BEND
�P
AlO
�--- 45' (1/8) BEND
WATER TIGHT
PLUG
PIPE MATERIAL AS SPECIFIED
BY THE ENGINEER
NOTES:
1. 6" AND 6" CLEANOUTS ON SEWER MAINS SHALL BE EAST JORDAN IRON WORKS, INC.
No. 3698 OR EOUAL CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY.
2. IN UNIMPROVED AREAS, POUR A 1' -0" THICK, 2' -0" SQUARE
CONCRETE. CLASS 3000, PAD AROUND THE RING AND COVER.
is PUBLIC WORKS 8 OR 6 INCH CLEAN -OUT &M' PLAN - m.1
DEPARTMENT FOR SANITARY SEWER MAINS
SEPTEMBER 2011
r Awl
MI-4-11k jtA rod.wdin,S!
rop 5 e: 1 a., d Sea u r
RECESSED G rk ° c k i
LIFT POCKET
N 3"
11 N.C. SOCKET HD 2 -0
SCREW 1 O LONG
(BRONZE OR S.S.) S.)
Yz" z 2" RAISED PADS
♦. 4``
\ \ / 6" CONCRETE
CLASS 3000 SAND OR
EXPANDABLE
FOAM
~- 12 Y4" WATER TIGHT
14" PLUG
2'� 30 1 45' (1/8) BEND —�
0
�1� IIII�
m
ml
2-
�GX,
,�o
45' (1/8) BEND
PIPE MATERIAL AS SPECIFIED
BY THE ENGINEER
NOTES:
1. 8" AND 6" CLEANOUTS ON SEWER MAINS SHALL BE EAST JORDAN IRON WORKS, INC.
No. 3698 OR EOUAL. CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY.
2. IN UNIMPROVED AREAS, POUR A 1' -0- THICK, 2 - -0- SOUARE
CONCRETE, CLASS 3000, PAD AROUND THE RING AND COVER,
PUBLIC WORKS 8 OR 6 INCH CLEAN -OUT SM. PLAN - 403'1