HomeMy WebLinkAboutCO 1CHANGE ORDER NO.1 City of Renton — Will Rogers -Wiley Memorial Seaplane Base Maintenance Dredging Project DATE OF ISSUANCE: 12/09113 EFFECTIVE DATE: 12/10/13 OWNER: City of Renton PROJECT NUMBER: CAG -13 -177 CONTRACTOR: American Construction Co. ENGINEER: Coast & Harbor Engineering, Inc. DESCRIPTION: Unrestricted Work Hours & Allowable Equipment Operation Changes for Stop Work Orders REASON FOR CHANGE ORDER: Contract provides for unrestricted use of the in -water dredge work area during the construction work period which starts at 1200 PDT (noon) each working day. The City of Renton has been notified they need to accommodate Boeing 737 departures and arrivals (Runways 34116 respectively) during the construction work period of 1200 to 1400 PDT. This will require restrictions on equipment height be imposed for flight safety and compliance with the Construction Safety and Phasing Plan (CSPP) during these work hours if aircraft are scheduled for departure or arrival. The anticipated flight schedule will be provided by the City of Renton Project Manager to the Contractor daily to provide an estimate of aircraft activity for each working day. The Contractor will be allowed to work during the time period between 1200 to 1400 PDT but may be required to stop work and modify the position of their equipment. If the Contractor is notified that a flight departure or arrival is expected to occur during these work hours, the City will issue one of the following stop work orders: Stop Work Option 1: City will provide 30 minutes advance notice for the Contractor to stop work and then completely remove any over - height equipment from the work area and relocate the equipment to a location compliant with the CSPP for a time period of 30 minutes. Once relocated to a point where all equipment heights are compliant with CSPP elevation restrictions, the Contractor shall notify the City. The Contractor shall then wait for the City to notify them that it is safe to re- mobilize equipment into the work area. Once the Contractor has mobilized completely back into the work area, the Contractor shall notify the City when work has begun. 2. Stop Work Option 2: City will provide 15 minutes advance notice for the dredge to stop work, then swing and lower the crane boom and any other over- height equipment as much as possible (orientating to West). Construction equipment will remain in work area for this option. ADDITIONAL COSTS The stop work window will result in a cost impact to the Contractors work for each occurrence. The following additional costs will be paid by the City for each occurrence when authorized and directed by the City Project Manager. 1. Stop Work Option 1: $1,666 per hour. 2. Stop Work Option 2: $1,745 per occurrence. An email summarizing each request for each stop work order occurrence shall be sent from the City to the Contractor documenting which option and date it was authorized. Each email shall accompany all pay requests that include change order costs. CHANGE IN CONTRACT PRICE: Original Contract Price - $575,313.00 Net Change from previous Change Orders - $0.00 Contract Price prior to this Change Order - $575,313.00 Net Increase /Decrease of this Change Order - CHANGE IN CONTRACT TIME: Original Contract Deadline - Net Change from previous Change Orders - Contract Time prior to this Change Order - December 27, 2013 None None Net Increase/Decrease of this Change Order - Variable (# occurrences) Page 1 of 2 1) $1,666 per hour 2) $1,745 per occurrence Contract Price with all approved Change Orders - Variable (# of occurrences) RECOMMENDED: Coast & rbo gin ► Inc. By: � 2 -1 ill Engineer (Authoriz ignature) APPROVED: America onstructiort C9., By: ,--• ----^ Contractor (Authorized Signature) Contract Deadline with all approved Change Orders - December 27, 2013 Date: Date: te-,Alh�, ACCEPTED: City of ton tt By: �� Date: t 3 Contracting Agency (Authorized Signature) Page 2 of 2