CHANGE ORDER # 8
AIRPORT:Renton Municipal Airport DATE: 7-30-13
LOCATION.Renton,Washington GRANT#:3-53-0055-023
CONTRACTOR:ICON Materials
This change order was prepared In accordance with FAA Program Guidance.Letter 12-03.A price
analysis was prepared and it is recommended that the FAA accept the analysis as evidence of
cost reasonableness.
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the Engineer:
Item# Description Unit Unit Quantity Amount
Price
Install Neutral Bars in 200 and 400 Amp
1 Panels L.S. $4,823.58 1 $4,823.58
I
Subtotal $4,823.58
State Sales Tax(9.5%) $458.24
This Change Order Total $5,281.82
Previous Change Order Amount $76,515.12
Original Contract Amount $2.364,463.61
Revised Contract Total $2,446,260.55
Recommended by., Date: (�
Engine , Reid Middleton, Inc.,
Approved by: �ju_ �� Date:
Own r,0 enton
Accepted by.•� Date:
Co tractor, ICO to ial /
Accepted by. Date: v
deral Aviation Administration
N:IDOC123/;pl>0100713eraton nvr a sry,,agek Nate Taxiway Const\Change Orders\CO 8.docx
CHANGE ORDER# 8
AIP PROJECT NO. 3-53-0055-023
AIRPORT Renton Municipal Airport LOCATION Renton, WA
JUSTIFICATION FOR CHANGE
i
This justification for change was prepared in accordance with FAA Program Guidance
Letter 12-03
1. Brief description of the proposed contract change(s)and locations(s).
-This change order consists of the following:
Installation of a neutral bar on the 200 Amp and 400 Amp electric panels installed as
part of this project.
This change order includes a request for a 14 calendar day time extension.
2. Reason(s) for the change(s) (Continue on reverse if necessary).
At the completion of installation of the 200 and 400 Amp electrical panels, the
installation was inspected by the City's Electrical inspector. The inspector
commented that before final approval for the panels can be provided,a neutral bar
must be installed in each of these panels. These components were not part of the
original design and require a change order to pay for parts, labor, and
installation. This work will require de-energizing the Airport Tower after Tower
operations have ceased for the evening(e.g.—night work). Accordingly,the COP
also includes the cost of crew travel(from Ellensburg) and a motel rooms. The work
will occur over one night(currently scheduled for the night of August 8). This
Change Order Proposal compensates the electrical he
for bringing the two
panels into compliance with the City's Electrical Code requirements.
3. Justifications for unit prices or total cost:
Justification was prepared in accordance with FAA program guidance letter 12-03.
4. The sponsor's share of this cost is available from: Port Funds
5. If this is a supplemental agreement involving more than$2,000, is the cost estimate
based on the latest wage rate decision? Yes No NA X
6. Has consent of surety been obtained? Yes Not Necessary X
7. Will this change affect the insurance coverage? Yes No X
8. If yes, will the policies be extended? Yes No X
9. Has this Change Order been discussed with FAA Officials?
Yes X No When 07/24/13 With Whom Peter Doyle
H:00CMApV 101007 Pentan _1W B Signaae\'Notfih Taxiway Const\Change Orders\CO 8.docx
1
ICON �i&ials
1308`Weaflne Ave. SE
Pacific. WA 98047
( 06) 7 =320 Fax(206) 375-0319
Q1*
�tivvv a.�c+��naxer�als�cam
Cost Detail with Categories
Project Name: Taklway 8 System Rehabilitation Customer: City Of Renton
Job Number: 512309 Billing Address: 3555 NE 2ND STREET
Bid As: PRIME Renton,WA 98056
Estimator: David Gent Phone: 425-430=7400
ProjectAddress: .Renton Municipal Airport, Renton,WA Contact:
Complation.Date:
i
Unit Total
Description Quantity UM Direct Cost Direct Cost UnWPrice Total Prite •MU%o
7#1 094to,8-Cotvico Change Order 1.001:5 $4,306.77 $4,306:77 $4,823.58 :#4,823:58 MOM
02nstatl l Neutral Bats In 400
And 200:Amp.Paneis
igt f4ull2men t serial Subcontracted Trucking Miscellaneous E111s
Unit: $0.00 $0.00 $0.00 $4,306.77 $0.00 $0.00 $0:00
Total: $0.00 $0.00 $0.00 $4,306.77 $0.00 $0.00 $0100
CEC-7/17/2013 12:12 PM:ICON Markup on Subcontracted Work 12%_$516.81+Subcontracted work$4,306.77 .
Total with Markup.$4,823.58
OS. Colvico 1.00 LS $4,306.77 $4,306.77 ]obCosW
7/17/201312:14:55 PM Rage i of,-2
i N RIM , • �
Percent of Percent`of
Amount Direct Cost Amount Indirect Cost
Labor $0.00 0.00% Labor. $0.06 0.1010%
Equipment Owned: $0.00 0.00% Equipment Owned: $400 1000/0
Equipment i'tented:. $0.00 0.00%0 Equipment Rented: $0.00 0.0 %
Materials Owned $0.00 0.000/0 Materials Owned: $0:00 0.00%
Materials Purchased: $0:00 0.000/0 Materials Purchased: $0:00 0.000W
Subcontracted: $4,306.77 100.00% Subcontracted: $0:00 0100%
Trucking Owned: $0.00. 0.00% Trucking Owned: $0:00 0.00410:
TruckingAired: $0.00 0.00% Trucking Hired: $0.00 0:00%.
Miscellaneous: $0.00 0.00% Miscellaneous: $060 0.000/0:
Plug: $0:00 0.000/0 Plug: $0:00 Ot OPW
Direct cost: $4,306.77 Indirect Cost: $0.00
I • ,
i
Percent of
Amount Bid Price
TotaL Direct Cost- $4,306.77 89.29%
Total DC`Adds/Cuts: $0.00 0:00%
Total Indirect Cost: $0.00 0.00%
Total Bond: $0.00 0.000/0
Total-Overall Cost: $4,306.77 89.290/0
Total Overhead: $0.00 0.00%
Total Profit:. $516.81 10:71%
Total Margin: $516.81 10.71%
Total Bid Price:. $4,823.58
7/17,j2013 12:14:55:PM Taxiway B System Rehahilbbon Page'2.of 2;
r
2812 N. Pittsburg Phone: (509) 536.1875
Spokane, WA 99207 Fax=.(509)534.3551
Dater JULY 12 ,2013
To: Icon Materials
Attention: Chuck Coffey
Reference: City of Renton Taxiway B System Rehabilitation
Subject:. Design Directive#
Change Order#10 Install.Neutral bars in 400 amp and 200 amp Panels.
Colvico Electricians $ 4306.77
Total $ 4306.77
Excludes:
1.) Tax
Contract Time Extension: Colvico Inc. will require a 14 calendar day extension to the
contract.
If you have any questions regarding the above information,please feel free to contact me
immediately.
Respectfully submitted,
Greg McBride
Estimator/Project Manager
Colvico Inc-
.
Email: gmebride @colvicoinc.com
PH: 509-201-0232
Washington Contractor's License COLVII*13.4D6
i
JOB NAME:CITY-OF RENTON TAXIWAY B REHABILITATION CO#10
Change Pro osal Request#10 Install Neutral Bars in 400 amp and 200 amp Panels.
ITEM --- - --- QTY.- --UNIT PR. EXT. PR.- _ -LAB UNIT EXT. LAB --
400 Amp. Neutral bar i 1 $ 137.00 $ 137.00 8 8 —
200 Amp Neutral bar 1 $ 52.00 $ 5100 6 6
0 $ - $ - 0 0 _ .-_....__....
Travel 2 $ 100.00. $ 200.00 8 16
Mote[ - -2 $ 100.00 $ 200.00 0 0
0 $ - $ - 0 0
0 $ - $ - 0 0
0 $ - $ 0 — p
COORDINATION 1 $ - $ - 4 4
Coordination material 0 $ -
- is for travel fuel --..._.0__$._..._ - ._, $ _: 0 0 _.._.__._.
0, $ - $ _ i 0 0 -
EQUIPMENT 0 $ - $ - _ 0 ^0
3!4 TON:PICK-UP 4X4 2 $ 98.61 $ 197.22 - 0 0
0 $ - $ 0 _ 0
............__..._
0! $ - $ - 0 0
0 $ . $ - 0 0
o $ - -
$ o 0
_--..-.._........._.__. _....... - _0 -$ $ _._.._._... - 0 - .._.. ...._.0
0 $ - $ - 0 0 -
- -.............._... __ - _ _ - -............
-
----- ----_0.. $ - $ - 0
MATERIAL TOTALS ( � $ 786.22
LABOR TOTAL HOURS --- 0
34
LABOR $'PER_HOUR
LABOR TOTAL $ 2,550:.00
QUOTES
TESTING
MOBILIZATION $ -
I
GARBAGE HAULO.FP
STORAGE
PER DIEM
PERMIT
TAX
--.....-.............:_..- -
SUB TOTALS ___ $ 3,336.22
Overhead 12% $ 400.35
Sub total T-----------��-�- �- ---�— $ 3.,736.57
Profit 13./0 ' $
---
° ------ 485.75
JOB TOTAL.__.__ ---- -.__.......------- $ .4,222.32 ---- - ---__---
-----._
BID BOND 2% 84.45 _
$
Job Total _ $ 4,306.77
r
Renton Airport
Change Order Cost Analysis/Backup for Taxiway B System Rehabilitation—North Portion
Reconstruction and Airfield Signage Modifications
Change Order#8
This cost analysis is prepared in compliance with Program Guidance Letter 12-03. Comparative costs
have been taken from bid prices for other projects,from construction cost guides and from quotes from
suppliers. The quantities to complete each of the activities listed below are small in comparison to the
quantities for a typical project,therefore unit prices for the items listed will be higher than expected for
a large quantity.
1) Install Neutral Bars in the 400 and 200 Amp Panels
This activity consists of the following tasks.
• 400 Amp Neutral Bar and 200 Amp Neutral Bar
Review of the unit prices for these two neutral bars indicates that unit prices are within industry norms.
Prices from Square D catalog for 200 amp and 400 amp components have a list price of$132. Typical
total costs for the two neutral bars can be expected to be approximately$264. The Contractor's cost for
these bars is$189.
• Travel
Travel cost represents the estimated cost of fuel for two vehicles for this additional site visit. Each
round trip is approximately 215 miles. Using the current government allowable mileage allowance of
$0.565 per mile,the allowable cost for two vehicles is$243.
For the estimated cost from the Contractor is$200.
• Motel
Motel (per diem)cost represents the cost for two employees to stay at a hotel for one night each. The
current government allowable per diem rate is$71 per day. Using the allowable per diem rate,the
allowable cost of per diem for two employees is$284. The Contractor's cost for motel is$200.
• Coordination
Contractor coordination with Airport staff resulted in one additional round trip site visit by the Electrical
Subcontractor to the project site from the project office in Ellensburg. The Contractor estimates 4 hours
for coordination effort.
• Labor
The labor effort matches the contractor's effort to accomplish this task. The labor rate of$75 closely
matches the labor rate of$77.91 from the 2012 Friday Harbor Airport project.
•. Equipment
Equipment rates were established using the 2003/2004 NECA Tool and Equipment Schedule. On-site
durations match field observations. Equipment total charge of$98.61 per vehicle is lower than the
billing rates from the February 2013 NECA rates schedule.
Replacement of Sign#2 and#3 change order price from ICON Materials $4,823.58
Conclusion: The requested change order amount is a fair and reasonable estimate for Installation of the
400 Amp and 200 Amp Neutral Bars
H:doc/23ap/10/007 Renton W B&Signage/'North Taxiway Constr/Change Orders/Renton CO#8 Cost Justification.doc.mjc
:
NQ Factory Assemb Common Features QtleOPZae a
A Class 16�/Refer to:Catalog i640CT0701 by.Schneiaer Ei- tii
Pane{boards www.schnelAer-electrlc.u:
Sub-feed Lugs Table 9.38: NO Main.Neutrai Conductors-Required Size i
• NOTE: Available on main lug interiors only,10,or 39. and Quantity {
Table 9.29: Sub-feed Wire Range Per Phase
100/125 (2)1/0!u!r At (2)#4,-300kcm0
• 225 .. : ((2)410 Cu or(2)300 kcmll AI (2)114 300 kcmil
100 one#6 210
At or Cu one fib 2/O At or Cu 5128.. 400 A (�)3!O Ckan�All k (')�l0 300�cmt°!
225 one 110-350 komil AI or Cu .one 1/0.350 kcmil AI or Cu 5128. (2 600 kcmil Cu - u. (. 991
• �2 750kanilAl
400 one 1/0 750 kcmll Cu only one 1/0.750 kcmil Cu Dory $164. Note: Neutral conductors must,oe of size and quantity per table above.
Table 9:30: Sub-feed Lug Cabinet Data Table 9.39:-,Metal Directory Frames
r r } kl Replaces standard plastic stick-on directory pouch 140
18
30 MH32MH38 MH50 -
42 - MH44 MH50 Table 9:40: Hinged Door-in-Door Trims"
72 - MH50 MH62 •.. ••.
84 - MH56 MH68
Hinged Door-in-Door Trim has piano hinge down one side. 64
Inner door has a lack,outer doer Is retained with screws
Feed-through Lugs Hinged Door-in-Door with OuterpootLodeinplaceofscrews 836
Table 9.31:. Feed-through Lugs
Table 9.41: Weatherproof or Ousttight Cabinets-Type 3R,6,
100 A TP2/0A O 344
225 A AI or Cu 344, Note:600 A LC ma n dreu t breaker NQ panelboards are not.
available with a weatherproof end ure(Use t-Une)400 A il or twb 1/050 kcmil AI or Cu 826. �and 600 A NO panelboards with sub-feed circuit breakers are
600 A 1 AI or Cu a 826. 151
not avallaMe with a weatherproof enclosure{Use.I C[r e).
- - -
Table 9.32: Feed-through Lug Cabinet Data 400 A NO See 9. 8 are age 9.1ewith a subteed titeaker up to'
150 A.See Table 928 on page 9.71
�: , . ,, . rr • p' Factory, g
Fable 9.42:: Optional Facto Assembled" u s
for Main Lug Interiors
• is i� t�'��i'�.r,.
30 38 50 50 62 62 68
42 38 " 50 56 ' 68 ; 62 80 Aluminum 148. 1
Compression Lugs 58. 58. .
72 50 62 68 80 74 - Copper Meofianicel Lugs 70.: 1
108. 148. .
84' 56 68 68 1 80 i 80 - Copper Compresslon Lugs 70: 108. 148. 1
• 8.75 In.deep box,ship fully assembled only:
Table 9.43: Optional Factory A.ssembled Lugs
{` Table 9.33: Ground Bars for Main Circuit Breaker Interiors
ism
P
Equipment Ground Bar 38'
Copper Ground Bar(add to Equipment Ground Bar price) 52. Aluminum Compression Lugs 58. 98. 148: 1,
# IreulatecUlsolated Ground Bar 86• Copper Mechanical Lugs 70. 108. 148. 1
(add to Equipment Ground Bar price) Copper Compression Lugs I 70.I 108:I 148. f
Table 9.34' Name Plates _ N,ote;,_Optional lugs are not available for O frame main or OOB $
cirsuitbreakers,
Standard white facelblac k letter laminated bakeine, Table 9.44: $urgelogicT"'Hard Bus SAD-Model IMA■
1 in.x 3.5 in.,adhesive backed or screw mountable with 78•
screws in a bag assembly(price includes engraving) ,
128. 17992.
r •r �' r
Table 9.35: Copper Bus Bars 100 10130. 11970. 11
120 10764. 12548. 1
- )k
!!!!] 160 12172. 13807.400 A,225 A,250 A Tbm.dard - 240 17822. 20583.600 A _
■ SPD units add 18 in,of box:height in NO panelboards
Table 9.36: Copper Neutrals
- Table 9.45: Surgelogic sPD Options
10000 A 132: Surge�Counter Standard '
Dry i5o -CIS
Standard _
Table 9.37: 200%Rated Neutrals Remote Monitor
=onen#6:-2t0kcmIIAI0rCuperlug Note: Additional factory modifications',See Digesfpage 9-38.
100 AA • 566. -
225 AA one#6 350 kcmil At or Cu per lug 7 •
40O AA 'one#1/0-750'komil Al or Cu per lug or 950. -
two 1/0 300 kcmt per lug
A Two incoming neutral lugs per panel
Discount ©2012 Schneider
9-12 PE1 Schedule All Rights R