HomeMy WebLinkAboutCO 16)r C. 0. #yam' ✓n L j CITY OF RENTON Page 1 of 1 Public Works Department CHANGE ORDER NO. 17 CONTRACT CHANGE ORDER AGREEMENT CONTRACT: South Lake WA Roadway Improvements (Garden Ave. Widening) CAG -12 -021 CONTRACTOR: DATE: ICON Materials May 2, 2013 SUMMARY OF PROPOSED CHANGE: Reason /Justification: The Contractor incurred delays as a result of staked curb and gutter grades at the NE corner of Lake WA blvid /N. Park Dr. not matching up to existing conditions. The issue was discovered after forms for the curb had been installed. As a result, scheduled paving was delayed and subsequent switch from Stage 1 configuration to Stage 2 configuration, delaying a scheduled utility boring across Garden Ave. N. Delays in setting up Stage 2 configuration resulted in paving and permanent striping delays. Contract Change: Lump sum for all labor, equipment and coordination to compensate for the costs incurred by delaying the pouring of the curb and gutter at the NE comer of Lake WA Blvd /N. Park Dr. Eight (8) additional working days are requested to compensate for the delays. This change order resolves all issues with regard to delays associated with construction of the curb and gutter in the NE corner and reimburses the Contractor for all costs associated with such delays. Add the following quantities to existing bid item Dlan quantities in the schedule of prices. Item Approx Units Description Unit Price Amount No. Quantity 116A I 1 I LS IGrade Changes Delay $ 3,759.95 1 $ 3,759.95 Subtotal: $ 3,759.95 Washington State Sales Tax (9.5 %): $ 357.20 Total this Change Order (Subtotal Plus Sales Tax): $ 4,117.15 Working Days: 8 Additional Working Days are Granted to complete this work. All work, materials and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATE NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $1,968,690.65 $276r3 $4,117.15 $2695:7 -, 88— 107, SBk Jet'/ SIGNATURES: ,2, i 1 Z1 003 q3 Change Order Time & Material Calculations Perteet 505 Fifth Avenue South, Suite 3001 Seattle, WA 98104 I PH: 206.436.0515 FAX: 206.436.0516 Project: South Lake Washington Roadway Improvements Date of Work: 8/20 -22/12 Fed Aid No.: (Garden Avenue Widening) Project No. CAG 12 -021 Bid Item: Change Order TIB No.: 9 -P- 102(014) -1 Work Performed By: ICON Materials PRIME Work Authorized By: James P Wilhoit, Project Manager Description of Work / Location : ICON Costs to re -work grades for the East side of Stage IA 8120/12: Grade bust at IA, STA 50 +00 to 52 +00 8/21/12: Grade Bust IA East, STA 50 +00 tp 50 +00 approx. Started topo in the morning at the request by KPG. Stopped topo after KPG email. Work out with Bob Case (Perteet) to calc grades to correct issue. Will continue in the morning. 8/22/12: Jason B. with Bob Case working on corrections to grades at Stage I A East, STA 50 +00 to 52 +00, centerline to curb & gutter. LABOR Time Rates COST ID No. Name Classification REGULAR OVERTIME REGULAR OVERTIME LIDNo. 3 Richard Walker Laborer Foreman (Grp 5) 5.0 $ 37.09 $ 49.71 $ 69.24 $ 248.55 2 Jason Betzer Operator (Grp 2) 15.0 $ 34.38 $ 56.37 $ 76.23 $ 845.55 Subtotal - Materials 12% I $ TOTAL SERVICE with OH /P and WSST Sales Tax on Subtotal Materials at ( I $ Subtotal - Equipment $ 322.95 21% f Overhead /Profit on Equipment at 21% i $ 67.82 TOTAL EQUIPMENT with OH /P I $ 390.77 Subtotal - Labor $ 1,094.10 Overhead /Profit on Labor at ? 29% $ 317.29 TOTAL LABOR with OH /P $ 1,411.39 EQUIPMENT Time Hourly Rates COST QTY Year, Make Model, Power... Blue Book Description 0.EGULAR STANDBY REGULAR STANDBY LIDNo. 2006 Ford F450 (Rick Walker) On- Highway Light Duty Truck 5.0 $ 37.09 $ 1.38 $ 185.45 Trimble Total Station TSC -2, AT1 SP5 70 Survey Data Collector 4:0 $ 1,748.03 $ 34.38 Sales Tax on Subtotal Service at $ 137.50 $ - Subtotal - Materials 12% I $ TOTAL SERVICE with OH /P and WSST Sales Tax on Subtotal Materials at ( I $ Subtotal - Equipment $ 322.95 21% f Overhead /Profit on Equipment at 21% i $ 67.82 TOTAL EQUIPMENT with OH /P I $ 390.77 r1A 1 r-K1ALb Supplier Description From INV. # QTY UNIT $ COST 3061 $ 1,748.03 Subtotal - Service $ 1,748.03 Sales Tax on Subtotal Service at 1 $ - Subtotal - Materials 12% I $ TOTAL SERVICE with OH /P and WSST Sales Tax on Subtotal Materials at ( I $ Overhead /Profit on Materials (including Sales Tax) at 21% f $ TOTAL MATERIALS with OH /P and WSST $ - JV6% -U1V 1 111.146.1 UK (OT IIMVUI% -G) Name Description Prime Contractor Markup (If Work Performed by Subcontractor) Rate: I 12% s INV. # COST Tyee Concrete Construction Inc. Delay and Disposal of 5 yds concrete, 8/20/12 3061 $ 1,748.03 Subtotal - Service $ 1,748.03 Sales Tax on Subtotal Service at 1 $ - Overhead /Profit on Service (including Sales Tax) at 12% I $ 209.76 TOTAL SERVICE with OH /P and WSST $ 1,957.79 Cumulative Subtotal - THIS PAY TICKET I $ 3,759.95 Prime Contractor Markup (If Work Performed by Subcontractor) Rate: I 12% s N/A TOTAL FORCE ACCOUNT COST - THIS PAY TICKET - Including all Markups $ 3,759.95 cm: LLD LL 0 -0n` 0 0 ry Li co E 1 Saoti 3 0 z pQd oaE mop 0- P ON O, gOg aye oz a tl 0 cc 0 0 co 3: 0 M —,o- IS IS Lo--1 o 1 .1 o col 0 0 0 0 0 cl E 3 0 z pQd oaE mop 0- P ON O, gOg aye oz a tl 0 cc 0 0 co 3: 0 F c D' I � 0 ry *1 0 a) -E wo co m -6 '0 cl 0 0 cu >1 E a) 0 9,6 \ \} le Q 3 - _!« 1,2 H �E co E E I 7E! 43 Q 0 fa .r- -C 3: 2 0 (a C) a I — — — — — — — — — — — — — — — — — — — — — 0 C) — — — 10 — — 10-1. — — 10 — - 1— 0 to 0 U) 4, Lu cu >1 E a) 0 9,6 \ \} le Q 3 - _!« 1,2 H �E co E E I 7E! 43 Q 0 fa .r- -C 3: 2 0 (a C) a 11 4 i � t► " 3 � CK � a N' G S •U N� � T OJ � _ •s a p cn. O _ O to O cn O O rn, O to O rn 3 y m o m O U H N O � a (, l3 O �i ' C) C) U �\ m N' S _ •s p cn. O Olcn O to O cn O O rn, O to O rn Olin G} m o m O to O �i C) C) U �\ , FT I U a N � r 0 E W r I X 7 N l � Y 1 c n k• U-I N' S p cn. O Olcn O to O cn O O rn, O to O rn Olin O m o m O to C) C) U �\ , FT I U a 0 E W r I 0 !� V.1 E — d U T 3 � � w 0] w E Z o S. J N D Z O L d ° 3J pa_4D �a N � ° L a i✓ } = Q u z z -a °aa.; cu a T�aa W m _3ti to Z �am� Q W v S m Q'o o�t� r C5 rnn 7 C I- Nt.F CL N O) C N U O a N O Q >Y 0 n� a� E Y O N 0 OO a � LL W, W LL U N_ m 0 N 00 a) a 0 v t9 a m 0. U z N C fl C CL E C N N V @ £ C y U U Tyee Concrete Construction Inc 6423 Pacific Highway East Fife, WA 98424 BILL TO: ................................................................................ Icon Materials Incorporated 1.508 Valentine Ave SE Pacific, WA 98047 QUANTITY TERMS ............. I ................. Net 30 DESCRIPTION WedEQr,der-;�1467 SeeA#aehed 1- Wefk Order- 414 10 ✓ gee A44ashe 1 Sent Djr-eAy te Supplie DATE: 10/30/2012 ................................................................ INVOICE: 3061 PROJECT ........... I ............................................................................ S Lake Washington Roadway Imp 12.2394 RATE 1,748.03; 84.80 ymo.80 1,104.8 TOTAL E-mail PHONE FAX ........... ................................................................................................................................ . ........................... I ...................... reese@tyeeconcrete.com 253-507-8933 253-507-8934 ............................................................................................................................................ .................................................. AMOUNT U1, 0 84.80 - TTVT8-7 Customer Order f P.O. No. � -� TC.Cf Re restrOtisve.. 38/20 201-267937 11..00 CY MVIROMMAL COMPLlA,l\TC.;. .3.000 3.14 36.14 (SURCHARGI (;2.500 --j2;0f i - �o (S. 0107) FC)?�-F04C4A F320.29� 0 1-267- .0c /2 20 2-- 96�� i (I�D FUEV —".—)D �lm; 1,'19 li. 69j 0 /201' [21-26796�i .00�rCTY R:M.TRAINM.NT MB-AE96 38 !;- FJO—C 2 .16=43 )8/26 1-267966 5. m JOB TOTAL LINE FaMM9.24147 6082F 4394131 1104.87 000184 N GARDEN & X IOTH:ST s px WASH ROAD III'; R914TON emu Mill L & INVOICE No= . L -ARY SAND & GRAVE CY .04C4A 58.54x0 61.13 704-63 78/20 400 VALLSV-ANWk=- PUYALLUP, WA 9472-2!0i • (M) 833737 wwwMHw$Sn0jsr#dGmvW.QQm 6&/26/2612 82-909z3 LJDI.FUEL SURCHARGE�READY Ml ;2,500 :1.19 13.69 08/20 201-267937 11-00 TYEE CONCRETE CONSTRUCTION iNc 6423 PACIFIC HWY E FIFE, WA 98424 38/20 201-267937 11..00 CY MVIROMMAL COMPLlA,l\TC.;. .3.000 3.14 36.14 (SURCHARGI (;2.500 --j2;0f i - �o (S. 0107) FC)?�-F04C4A F320.29� 0 1-267- .0c /2 20 2-- 96�� i (I�D FUEV —".—)D �lm; 1,'19 li. 69j 0 /201' [21-26796�i .00�rCTY R:M.TRAINM.NT MB-AE96 38 !;- FJO—C 2 .16=43 )8/26 1-267966 5. m JOB TOTAL LINE FaMM9.24147 6082F 4394131 1104.87 000184 N GARDEN & X IOTH:ST s px WASH ROAD III'; R914TON 08/20 201-267937 11.00 CY .04C4A 58.54x0 61.13 704-63 78/20 201-267937 1.00 LJDI.FUEL SURCHARGE�READY Ml ;2,500 :1.19 13.69 08/20 201-267937 11-00 CtAIR SNTRM.NMENT M-AE90 38/20 201-267937 11..00 CY MVIROMMAL COMPLlA,l\TC.;. .3.000 3.14 36.14 (SURCHARGI (;2.500 --j2;0f i - �o (S. 0107) FC)?�-F04C4A F320.29� 0 1-267- .0c /2 20 2-- 96�� i (I�D FUEV —".—)D �lm; 1,'19 li. 69j 0 /201' [21-26796�i .00�rCTY R:M.TRAINM.NT MB-AE96 38 !;- FJO—C 2 .16=43 )8/26 1-267966 5. m JOB TOTAL LINE FaMM9.24147 6082F 4394131 1104.87