HomeMy WebLinkAboutRES 4300 CITY �F RENT�N, INASHINGT�N
RES�LUTI�N N�. 43��
RES�LUT��N �F THE ClTY �F RENT�N, INASHIN�T�N� AMENDIN� THE CITY �F
RENT�N FEE SCHEDULE,
INHEREAS, on No�ember Z3, 2��9, the Council adopted �rdinance No. 55�9, wh�ch
remo�ed many fees from the Renton Municipal Code and consolidated them �nto the �ity ❑f
Renton Fee Schedule brochure �"fee brochure"}; and
INHEREAS, the fee brochure has been amended se�eral times since 2��9; and -
WHEREA�, it is necessary to appro�e an amended fee schedu�e brochure for years Zq17
and 2�18 as a part of the C�ty's 2�17/2�18 biennial budget;
N�IN, THEREF�RE� THE CITY C�UNC#L �F THE CITY �F RENTQN, 1JVASHINGT�N, D�ES
RES�LVE AS F�LL�IJVS:
SECTI�N I. The abo�e recitals are found to be true and correct in a!I respects.
SECTI�N II. The 2Q17-2�18 City of Renton Fee Schedule brochure, attached hereto, �s
hereby adopted by reference. A copy of the fee brochure is at all times filed with the City Clerk.
PASSED BY THE CITY C�UNCIL this ZZst day ❑f Na�ember, 2�15.
,
�1
�
Jason A Seth, City erk
APPR�VED BY THE MAY�R this 21st day ❑f No�ember. Z�ZG.
Denis Law, Mayor
1
RES�LUTI�N N�. �300
Appro�ed as to form :
�.�..�-
Lawrence � . INarren, City Attorney
,����,,,����►��E��f,��`���
�*�� �� ��� ���r
. . ♦,�••; *�'� �#��,►►��riir►���� �'� �i`,�
R Es. 1�15. 101�0116:5�r : �,� _�.-�� ����, � �-.
� = �. ': :
.. � � �
= = SEAL = �
# - �
�. _ _
.. _ _
_ � _ �
� : ` .�'
� / � ` r
� � % -� � r
r
� �~• i
s���/ �� ,,'���I�Ilillil►���'� �p�����
�����''��p�� �,�. '`�.
������` A TEp 5E',�����
i����,�3�►�►i
�
�
■
I � � � � �� � � � � � � �
,�_ —,, — __`
�'` :.�;" � — • —
,�,,�._ .
=�!, . —
- , 2� _
�
, _ �t �
�
n
� � ������;, � �
� -�' �' j �
� � `. � { _ . I� '��
- � ,:� � .
, , �� z
��f'� � �
, � � -
, . , �
5 , .� ' . . ;��
; '
., , .f � �,� . . . —
• � � a ��
V, � -
�. M I �� �.
` �.�"�� .. .. ,_�I'1� .
.yr�. � . .. .' �4�..����1h �-��� ��� �� . -
. ._ ,
c .-�"� .�:�s� __.._ — -� _ '.'"'. _�.__,� .
_ _r�r P+� , . � ���
�
� �
. . . . � .Ri.,.. .,
Rev. November, 2016
2017/2018 Fee Schedule
. • • • � . •
SECTION I. MISCELLANEOUS FEES 1
SECTION II. MAPLEWOOD GOLF COURSE 2
SECTION III . CITY CENTER PARKING FEES 2
SECTION IV. AQUATIC FEES 2
SECTION V. CARCO THEATER (REPEALED) 3
SECTION VI. PARKS AND FACILITIES USE AND RENTAL 3
SECTION VII . COMMUNITY CENTER PASS CARD & FEES 4
SECTION VIII. AIRPORT CHARGES 5
SECTION IX. ANIMAL LICENSES 5
SECTION X. BUSINESS LICENSES 5
SECTION XI. ADULT ENTERTAINMENT LICENSES 5
SECTION XII. DEVELOPMENT FEES 6
Building Fees 6
Land Use Review Fees 8
Public Works Fees 9
Fire Department Community Risk Reduction Fees 13
Technology Surcharge Fee 13
I m pact Fees 14
2017/2018 Fee Schedule
City of Renton Fee Schedule
2017-2018
• � • 1 . 1 1 :
1. Maps:
a. Zoning maps - standard 11 x 17 $4.00 $4.00 $4.00
b. Zoning maps - large 24 x 36 $12.00 $12.00 $12.00
c. Comprehensive Plan map - standard 11 x 17 $4.00 $4.00 $4.00
d. Comprehensive Plan map - large 24 x 36 $12.00 $12.00 $12.00
e. Precinct maps $5.00 $5.00 $5.00
2. Plat:
a. First page $2.00 $2.00 $2.00
b. Each additional page $1.00 $1.00 $1.00
3. Photocopies:
a. Each 8.5" x 11" or 8.5" x 14" $0.15 $0.15 $0.15
b. Each 11" x 17" $0.20 $0.20 $0.20
c. Each 8.5" x 11" or 8.5" x 14" color $0.25 $0.25 $0.25
4. Budget:
a. City's Budget $10.00 $10.00 $10.00
b. City's Budget to other municipality or quasi-municipal N/C N/C N/C
corporation or other nonprofit charitable or education
organization
5. Audio or Video Recording Copies:
a. Audio recording, each copy $2.00 $2.00 $2.00
b. Video recording, each copy $2.00 $2.00 $2.00
6. Regulations and Plans:
a. Comprehensive Plan and Map $30.00 $30.00 $30.00
b. Title IV, Development Regulations:
(i) Text and Zoning Map $110.00 $110.00 $110.00
(ii) Text only $100.00 $100.00 $100.00
c. Individual Chapters of Development Regulations $10.00 $10.00 $10.00
d. Renton Municipal Code (two volumes) $400.00 $400.00 $400.00
e. Code Supplements, per year:
(i) Titles I - III and VI - X $70.00 $70.00 $70.00
(ii) Title IV $70.00 $70.00 $70.00
7. Miscellaneous Services:
a. Certification and Notary Fees - Clerk's Certification $10.00 $10.00 $10.00
b. Notary Public Attestation or Acknowledgement or as $6.00 $6.00 $6.00
otherwise provided for in RCW 42.28.090, per signature
c. Hold Harmless Agreements and other similar documents $20.00 $20.00 $20.00
not otherwise provided for
d. Lamination of licenses, pictures $6.00 $6.00 $6.00
e. Community Development Block Grants (CDBG) Loan Program:
(i) Application Fee $200.00 $200.00 $200.00
(ii) Loan Origination Fee �15U or U.LS/o �15U or U.LS/o �15U or U.LS/o
of loan of loan of loan
amount, amount, amount,
whichever is whichever is whichever is
greater greater greater
(iii) Closing Costs (including any legal fees) 50% of total 50% of total 50% of total
actual costs actual costs actual costs
8. Miscellaneous Charges for Police Services:
a. Police Reports per page $0.15 $0.15 $0.15
b. Record Checks (Written Response) $5.00 $5.00 $5.00
c. Photographs - Digital on CD $2.00 $2.00 $2.00
d. Photographs - black & white or color - Cost Cost Cost
Cost of developing film
e. Fingerprint Cards $5.00 $5.00 $5.00
(i) Each additional card $1.00 $1.00 $1.00
9. Charges for Fire Documents:
a. Fire reports per page $0.15 $0.15 $0.15
b. Fire investigative report on CD $2.00 $2.00 $2.00
c. First copy - black & white or color - Cost of developing film Cost Cost Cost
d. Additional copy - black & white or color - Cost of developing film Cost Cost Cost
10. Computer Listings:
a. City of Renton new business list $10.00 $10.00 $10.00
b. List of all business licenses $20.00 $20.00 $20.00
c. Copies requested to be faxed, local number $3.00 $3.00 $3.00
d. Copies requested to be faxed, long distance number
(i) One (1) - five (5) pages $10.00 $10.00 $10.00
(ii) Six (6) or more pages (ten (10) page limit) $20.00 $20.00 $20.00
11. Utility Fee:
a. Special Request Water Meter Reading $30.00 $30.00 $30.00
b. Utility New Account Setup $25.00 $25.00 $25.00
c. Utility Billing Account Transfer (tenant billing form) $5.00 $5.00 $5.00
2017/2018 Fee Schedule 1
City of Renton Fee Schedule
2017-2018
• � • • 1 . 1 1 :
d. Water utility outstanding balance search requested by $25.00 $25.00 $25.00
fax, messenger, or letter
12. Schedule of Fines for False Alarms - Security/Burglar:
a. First, second, and third false alarms in a N/C N/C N/C
registration year*
b. Fourth and fifth false alarms in a registration year* $50.00 $50.00 $50.00
c. Sixth false alarm and successive false alarms in a $100.00 $100.00 $100.00
registration year*
d. Late Registration Penalty $50.00 $50.00 $50.00
e. Late False Alarm Payment Penalty $25.00 $25.00 $25.00
f. Appeal Hearing Cancellation Fee $10.00 $10.00 $10.00
*A registration year shall mean January 1 thru December 31 each year.
13. NSF Check Fees $25.00 $25.00 $25.00
14. Veteran Park Tile: Three lines $75.00 $75.00 $75.00
Note: Should total of Section I fees due is less than $4.00 and not other fee is due to the city at the same time, the department administrator may authorize to waive
the entire amount due at their discretion.
• � � • • � • • � � . � � :
1. Green Fees:
a. Weekday:
(i) 18 Hole $34.00 $35.00 $35.00
(ii) 9 Hole $25.00 $25.00 $25.00
(iii) 18 Hole, Senior $25.00 $27.00 $27.00
(iv) 9 Hole, Senior $17.00 $17.00 $17.00
(v) 18 Hole, Junior $18.00 $18.00 $18.00
(vi) 9 Hole, Junior $14.00 $14.00 $14.00
b. Weekend:
(i) 18 Hole $40.00 $42.00 $42.00
(ii) 9 Hole $25.00 $27.00 $27.00
For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining four days of the week. "lunior" shall mean
ages 17 and under, "Senior" shall mean ages 62 and over.
2. Club Rental $15.00 $15.00 $15.00
3. Golf Cart Fees:
a. 18 Hole $28.00 $28.00 $28.00
b. 9 hole $17.00 $18.00 $18.00
c. Single Rider $20.00 $20.00 $20.00
4. Driving Range Fees:
a. Large Bucket $8.00 $8.00 $8.00
b. Small Bucket $5.00 $5.00 $5.00
c. Warm-up Bucket $3.00 $3.00 $3.00
5. Lesson Fees:
a. 1/2 Hour Private $45.00 $45.00 $45.00
b. 1 Hour Private $65.00 $65.00 $65.00
c. 1/2 Hour Series Private $160.00 $160.00 $160.00
d. 1 Hour Series Private $240.00 $240.00 $240.00
e. Group Series $100.00 $100.00 $100.00
f. 1/2 Hour Private, Junior $25.00 $25.00 $25.00
g. Playing Lesson(3-hole minimum/9-hole maximum) per hole $15.00 $15.00 $15.00
• � � � � � . � � :
1. CITY CENTER GARAGE PARKING FEES
Parking rates for retail parking will be as follows:
a. Zero (0) - two (2) hours N/C N/C N/C
b. Two (2) - four (4) hours $2.00 $2.00 $2.00
c. Four (4) - six (6) hours $4.00 $4.00 $4.00
d. Six (6) - (10) hours $6.00 $6.00 $6.00
e. 10 hours or more $10.00 $10.00 $10.00
f. Monthly pass-holders, tax included $35.00 $35.00 $35.00
• � • � 1 . 1 1 :
1. Admission for the Aquatic Center shall be as follows:
a. Regular Session:
(i) Resident infants - under 1 year N/C N/C N/C
(ii) Non-resident infants - under 1 year N/C N/C N/C
(iii) Resident youth - 1 to 4 years $4.00 $4.50 $4.50
(iv) Non-resident youth - 1 to 4 years $8.00 $8.50 $8.50
(v) Resident ages 5 and up $8.00 $8.50 $8.50
(vi) Non-resident ages 5 and up $14.00 $15.00 $15.00
(vii) Resident lap swim - water walking only $3.00 $3.00 $3.00
(viii) Non-resident lap swim - water walking only $4.50 $4.50 $4.50
b. Season Pass:
(i) Resident infants - under 1 year N/C N/C N/C
2017/2018 Fee Schedule 2
City of Renton Fee Schedule
2017-2018
• � • � • 1 . 1 1 :
(ii) Non-resident infants - under 1 year N/C N/C N/C
(iii) Resident ages 1 and up $60.00 $60.00 $60.00
(iv) Non-resident ages 1 and up $120.00 $120.00 $120.00
c. Miscellaneous Rates:
(i) Resident regular session per person rate (group rates) $10.00 $10.00 $10.00
(ii) Non-resident regular session per person rate $16.00 $16.00 $16.00
(iii) Locker Rental $0.25 $0.25 $0.25
*Group Rates: Group rates offer guaranteed admission for the group. In order to qualify for a group rate, the group must consist of ten (10) or more persons, and the
session must be scheduled in advance. Please note that the number of groups may be limited each day. Staff has the authority to offer discounted daily rates for partial
sessions or Renton-only events.
d. Canopy Rental Fees*: (includes canopy and admission for one leisure swim session):
(i) Henry Moses Party Tent #1
(10' x 20' for up to twenty-five (25) guests):
(1) Resident Rate, per session $300.00 $310.00 $310.00
(2) Non-resident Rate, per session $450.00 $475.00 $475.00
(ii) Henry Moses Party Tent #2
(10' x 10' for up to fifteen (15) guests):
(1) Resident Rate $200.00 $200.00 $200.00
(2) Non-Resident Rate $290.00 $300.00 $300.00
*Sales tax not included in the rental fee
e. Resident Rate all inclusive $1,500.00 $1,800.00 $1,800.00
f. Non-resident Rate all inclusive $1,500.00 $2,300.00 $2,300.00
g. Swim Lesson Program:
(i) Resident swim lesson per lesson $7.00 $7.50 $7.50
(ii) Non-resident swim lesson per lesson $9.00 $9.50 $9.50
h. End-of-year School Party Rentals:
(i) Renton School District
(1) 001 - 299 students $1,900.00 $1,900.00 $1,900.00
(2) 300 - 399 students $2,250.00 $2,250.00 $2,250.00
(3) 400 - 499 students $2,400.00 $2,400.00 $2,400.00
(4) 500 - 599 students $2,550.00 $2,550.00 $2,550.00
(ii) Other Schools and Districts
(1) 001 - 299 students $2,450.00 $2,450.00 $2,450.00
(2) 300 - 399 students $2,850.00 $2,850.00 $2,850.00
(3) 400 - 499 students $3,150.00 $3,150.00 $3,150.00
(4) 500 - 599 students $3,360.00 $3,360.00 $3,360.00
2. Boat Launch Rates:
a. Daily resident - 7 days a week $10.00 $10.00 $10.00
b. Daily Non-resident - 7 days a week $20.00 $20.00 $20.00
c. Overnight resident - 7 days a week $20.00 $20.00 $20.00
d. Overnight Non-resident - 7 days a week $40.00 $40.00 $40.00
e. Annual parking permit - resident $60.00 $60.00 $60.00
f. Annual parking permit - non-resident $120.00 $120.00 $120.00
g. Additional sticker (launching permit) $5.00 $5.00 $5.00
h. Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area for weigh in and or electricity at $50.00 $50.00 $50.00
the current rental rate) per event
• � � • � � � � � � � . � � :
� • . � . � . . � � . ., � . :► � ��
1. Outlying Picnic Shelters (Cedar River Trail, Liberty Park, Phillip Arnold Park, Teasdale Park and Heritage Park) Maximum of 75 people:
a. Resident 8:30am-1:30pm/3:30pm-8:30pm $90.00 $90.00 $90.00
b. Non-resident 8:30am-1:30pm/3:30pm-8:30pm $180.00 $180.00 $180.00
c. Full day resident 8:30am-sunset $140.00 $140.00 $140.00
d. Full day non-resident 8:30am-sunset $280.00 $280.00 $280.00
2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people;
a. Resident 8:30am-1:30pm/3:30pm-8:30pm $100.00 $100.00 $100.00
b. Non-resident 8:30am-1:30pm/3:30pm-8:30pm $180.00 $180.00 $180.00
c. Full day resident 8:30am-sunset $140.00 $140.00 $140.00
d. Full day non-resident 8:30am-sunset $260.00 $260.00 $260.00
e. South Shelters 1 & 2 Resident rate $300.00 $300.00 $300.00
f. South Shelters 1 & 2 Non-resident rate $600.00 $600.00 $600.00
3. Gene Coulon Beach Park Shelters (North Shelter):
a. Resident 8:30am-1:30pm/3:30pm-8:30pm $120.00 $120.00 $120.00
b. Non-resident 8:30am-1:30pm/3:30pm-8:30pm $240.00 $240.00 $240.00
c. Full day resident 8:30am-sunset under 75 people $160.00 $160.00 $160.00
d. Full day resident 8:30am-sunset 76 - 100 people $190.00 $190.00 $190.00
e. Full day non-resident 8:30am-sunset under 75 people $320.00 $320.00 $320.00
f. Full day non-resident 8:30am-sunset 76 - 100 people $380.00 $380.00 $380.00
4. Tennis, Basketball and Sand Volleyball court rate per hour (Tournament Play Only):
a. Tennis court $10.00 $10.00 $10.00
b. Park basketball court $10.00 $10.00 $10.00
c. Sand volleyball court $10.00 $10.00 $10.00
2017/2018 Fee Schedule 3
City of Renton Fee Schedule
2017-2018
� � . � . � . . � ' � • 1 . 1 1 :
5. Catering and Event Rate (All city parks apply):
a. Resident half day $200.00 $200.00 $200.00
b. Resident full day $350.00 $350.00 $350.00
c. Non-resident half day $400.00 $400.00 $400.00
d. Non-resident full day $700.00 $700.00 $700.00
6. Inflatable and big toy rate, each. $50.00 $50.00 $50.00
Note: Along with rental fee for the use of City facility for each inflatable or big toy, Applicant or Renter shall provide proof of insurance naming the City of Renton as
additional insured.
7.
Open Space Area in the Parks (Cascade, Teasdale, Phillip Arnold, Cedar River, Earlington, Gene Coulon, Glencoe, Kennydale Lions, Sunset, and Riverview Parks):
a. Resident rate per hour $10.00 $10.00 $10.00
b. Non-resident rate per hour $25.00 $25.00 $25.00
8. Photo Shoots per hour: $40.00 $40.00 $40.00
a. Commercial Film and Photo Shoots per hour $300.00 $300.00 $300.00
9. Athletic Field Rental, Lights and Prep Fees:
a. Sports field rental per hour - resident $25.00 $25.00 $25.00
b. Sports field rental per hour - non-resident $30.00 $30.00 $30.00
c. Renton Area Youth Sports Agencies, per hour $6.00 $6.00 $6.00
d. Field prep for softball/baseball - resident per occurrence $30.00 $30.00 $30.00
e. Field prep for soccer - resident per occurrence $45.00 $45.00 $45.00
f. Field prep other - resident per occurrence Varies Varies Varies
g. Field prep for softball/baseball - non-resident per occurrence $35.00 $35.00 $35.00
h. Field prep for soccer - non-resident per occurrence $50.00 $50.00 $50.00
i. Field prep other - non-resident per occurrence Varies Varies Varies
j. Field lights all sports - resident per hour $25.00 $25.00 $25.00
k. Field lights all sports - non-resident per hour $30.00 $30.00 $30.00
10. Banquet & Classroom Rental - Community Center & Senior Activity Center:
a. Friday 5 hour minimum - resident $650.00 $650.00 $650.00
b. Weekend Rates 10 hour minimum - resident $1,300.00 $1,300.00 $1,300.00
c. Extra hours - per hour - resident $130.00 $130.00 $130.00
d. Friday 5 hour minimum - non-resident $750.00 $750.00 $750.00
e. Weekend Rates 10 hour minimum - non-resident $1,500.00 $1,500.00 $1,500.00
f. Extra hours - per hour - non-resident $150.00 $150.00 $150.00
g. Kitchen charge - per hour $100.00 $100.00 $100.00
h. Banquet Room - Mon - Thurs - resident/hr 3 hour min $85.00 $85.00 $85.00
i. Banquet Room - Mon - Thurs - non-resident/hr 3 hour min $90.00 $90.00 $90.00
j. Damage deposit - senior center/community center - resident and non-resident $550.00 $550.00 $550.00
k. Contract violation fee - per hour $200.00 $200.00 $200.00
11. Classroom and Gymnasium Rental - Renton Community Center:
a. Resident single gym athletic - per hour $45.00 $45.00 $45.00
b. Non-resident single gym athletic - per hour $50.00 $50.00 $50.00
c. Resident double gym athletic - per hour $90.00 $90.00 $90.00
d. Non-resident double gym athletic - per hour $100.00 $100.00 $100.00
e. Resident single gym non-athletic $550.00 $550.00 $550.00
f. Non-resident single gym non-athletic $675.00 $675.00 $675.00
g. Resident double gym non-athletic $1,100.00 $1,100.00 $1,100.00
h. Non-resident double gym non-athletic $1,350.00 $1,350.00 $1,350.00
i. Carpet fee single gym - resident & non-resident $175.00 $175.00 $175.00
j. Carpet fee double gym - resident & non-resident $350.00 $350.00 $350.00
k. Classroom resident $35.00 $35.00 $35.00
I. Classroom Non-resident $40.00 $40.00 $40.00
12. Birthday Party Packages:
a. Bounce package - resident $75.00 $75.00 $75.00
b. Sports package - resident $65.00 $65.00 $65.00
c. Bounce package - non-resident $85.00 $85.00 $85.00
d. Sports package - non-resident $75.00 $75.00 $75.00
13. Facility Rental - Neighborhood Center:
a. Meeting room - resident $35.00 $35.00 $35.00
b. Gymnasium - resident $35.00 $35.00 $35.00
c. Meeting room - non-resident $40.00 $40.00 $40.00
d. Gymnasium - non-resident $40.00 $40.00 $40.00
• • ' ' � � ' � : : 1 e-
1. One Month Fitness Pass:
a. Resident $20.00 $20.00 $20.00
b. Non-resident $24.00 $24.00 $24.00
2. Yearly Pass:
a. Resident $200.00 $200.00 $200.00
b. Non-resident $240.00 $240.00 $240.00
3. Racquetball Pass:
a. Resident $55.00 $55.00 $55.00
b. Non-resident $55.00 $55.00 $55.00
2017/2018 Fee Schedule 4
City of Renton Fee Schedule
2017-2018
• • ' ' � � ' � : • � 1 . 1 1 :
4. Community Center Drop In Fees:
a. Resident adult/senior/student aerobics $6.00 $6.00 $6.00
b. Non-resident aerobics $6.00 $6.00 $6.00
c. Resident basketball $3.00 $3.00 $3.00
d. Non-resident basketball $3.00 $3.00 $3.00
e. Senior/student basketball $2.00 $2.00 $2.00
f. Resident volleyball $3.00 $3.00 $3.00
g. Non-resident volleyball $3.00 $3.00 $3.00
h. Senior/student volleyball $2.00 $2.00 $2.00
i. Resident fitness $3.00 $3.00 $3.00
j. Non-resident fitness $3.00 $3.00 $3.00
k. Senior/student fitness $2.00 $2.00 $2.00
I. Resident/senior/student shower pass $20.00 $20.00 $20.00
m. Non-resident shower pass $20.00 $20.00 $20.00
n. Resident racquetball per hour $7.00 $7.00 $7.00
o. Non-resident racquetball per hour $7.00 $7.00 $7.00
p. Senior/student racquetball per hour $7.00 $7.00 $7.00
q. Resident wallyball per hour $10.85 $10.85 $10.85
r. Non-resident wallyball per hour $13.00 $13.00 $13.00
s. Senior/student wallyball per hour $9.75 $9.75 $9.75
• � � � • � � � � .� . � � :
1. Airport Fuel Flow Charge: per gallon $0.06 $0.06 $0.06
2. Transient airplane parking daily $4.00 $4.00 $4.00
3. Hangar wait list, one time fee $100.00 $100.00 $100.00
4. Tie-down wait list, one time fee $25.00 $25.00 $25.00
5. Lost gate card fee per occurrence $50.00 $50.00 $50.00
6. T-Hangar, Non-Refundable Move-in Fee $250.00 $250.00 $250.00
• � � 1 . 1 1 :
1. Cat - Annual:
a. Cat Altered $30.00 $30.00 $30.00
b. Cat Altered - qualified senior lifetime tag (max. 3)* $0.00 $0.00 $0.00
c. Cat Unaltered $50.00 $60.00 $60.00
d. Cat Unaltered - qualified senior lifetime tag (max. 3)* $0.00 $0.00 $0.00
*Qualified senior shall mean residents sixty-one (61) years of age or older, meeting the income guidelines as set forth in Section 8-4-31C of the RMC�
2. Dog - Annual:
a. Dog Altered $30.00 $30.00 $30.00
b. Dog altered - qualified senior lifetime tag (max. 3)* $0.00 $0.00 $0.00
c. Dog Unaltered $50.00 $60.00 $60.00
d. Dog unaltered - qualified senior lifetime tag (max. 3)* $0.00 $0.00 $0.00
*Qualified senior shall mean residents sixty-one (61) years of age or older, meeting the income guidelines as set forth in Section 8-4-31C of the RMC�
3. Duplicate Tag $10.00 $10.00 $10.00
4. Penalty for not licensing $250.00 $250.00 $250.00
5. Late renewal fee $30.00 $30.00 $30.00
• : � . � � :
1. General Business License (Base fee + Per hour fee = Total fee):
a. Registration Fee $110.00 $150.00 $150.00
b. Per hour fee, for each worker hour * $0.0352 $0.0352 $0.0352
c. Appeal of Business License Decision $0.00 $250.00 $250.00
* Per hour rate shall be adjusted every other year by Seattle-Tacoma-Bremerton, All Items, Urban Wage Earners and Clerical Workers (also known as CPI-W) ending
August 31, for the same two year period.
2. Short Term Employment within the City:
a. A temporary ninety (90) day license maybe purchased for each FTE on a temporary job* $50.00 $50.00 $50.00
*Not to exceed 270 consecutive days
3. Penalties:
a. The penalty to reinstate an expired business license $50.00 $50.00 $50.00
b. The penalty for failure to obtain a business license* $250 $250 $250
+20% APR on +20% APR on +20% APR on
outstanding outstanding outstanding
�, Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of
Chapter 5 of the RMC shall render the business enterprise subject to a penalty of (5%) of the amount of the license fee
for the first month of the delinquency and an additional penalty of (5%) for each succeeding month of delinquency, 5%-25% 5%-25% 5%-25%
but not exceeding a total penalty of (25%) of the amount of such license fee.
* Payment of all license fee amounts still owing for the last three (3) years, plus a penalty of (20%) per annum for all amounts owing, plus any accounting, legal or
administrative expenses incurred by the City in determining the nonreporting, or the unpaid portion over the last (3) years or in collecting the tax and/or penalty.
• � � ' � 1 . 1 1 :
1. Every person applying for a adult entertainment license shall pay the applicable nonrefundable application fee;
a. Adult Entertainment Business License $750.00 $750.00 $750.00
b. Entertainer $75.00 $75.00 $75.00
2017/2018 Fee Schedule 5
City of Renton Fee Schedule
2017-2018
• � � ' � • 1 . 1 1 :
c. Manager $75.00 $75.00 $75.00
d. License Replacement $10.00 $10.00 $10.00
2. Penalties:
a. Civil Penalty, per violation $1,000.00 $1,000.00 $1,000.00
• � • � � . � � :
1. Building Fees
a. Building Permit Fees: Building Permit Fees are payable prior to the issuance of a building permit
(i) Base Fee/Valuation $1.00 to $500.00 $28.00 $28.00 $28.00
(ii) Valuation $501.00 to $2,000.00 $28 + $3.65 x $28 + $3.65 x $28 + $3.65 x
each $100 each $100 each $100
value value value
(iii) Valuation $2001.00 to 25,000.00 $82.75 + $82.75 + $82.75 +
$16.75 x each $16.75 x each $16.75 x each
$,1000 value $,1000 value $,1000 value
(iv) Valuation $25,001.00 to $50,000.00 $468 + $12 x $468 + $12 x $468 + $12 x
each $1,000 each $1,000 each $1,000
value value value
(v) Valuation $50,001.00 to $100,000.00 $768 + $8.35 x $768 + $8.35 x $768 + $8.35 x
each $1,000 each $1,000 each $1,000
value value value
(vi) Valuation $100,001.00 to $500,000.00 $1,185.50 + $1,185.50 + $1,185.50 +
$6.70 x each $6.70 x each $6.70 x each
$1,000 value $1,000 value $1,000 value
(vii) Valuation $500,001.00 to $1,000,000.00 $3,865.50 + $3,865.50 + $3,865.50 +
$5.65 x each $5.65 x each $5.65 x each
$1,000 value $1,000 value $1,000 value
(viii) Valuation $1,000,001.00 and up $6,690.50 + $6,690.50 + $6,690.50 +
$4.35 x each $4.35 x each $4.35 x each
$1,000 value $1,000 value $1,000 value
b. Combination Building Permit Fees*
(i) Plumbing up to 3,000 sq ft $150.00 $200.00 $200.00
(ii) Plumbing over 3,000 sq ft $175.00 $225.00 $225.00
(iii) Mechanical up to 3,000 sq ft $150.00 $200.00 $200.00
(iv) Mechanical over 3,000 sq ft $175.00 $225.00 $225.00
(v) Electrical up to 3,000 sq ft $75.00 $125.00 $125.00
(vi) Electrical over 3,000 sq ft $100.00 $150.00 $150.00
* Combination Building Permit fees are required for each new single family residential structure, and are payable prior to the issuance of a building permit
c. Building Plan Check Fee
(i) Initial Building Plan Check Fee* $ - 65% of permit 65% of permit
fee fee
(ii) Additional Building Plan Check Fee $ -
50% of initial 50% of initial
plan Check Fee plan Check Fee
* Building Plan Check Fee is in addition to the building permit fees and combination building permit fees. The plan check fee is equal to 65% of the building permit
fee or the combination building permit fee, payable at the time of building permit application submittal. Includes three (3) review cycles.
d. Demolition Permit Fee:
(i) Residential $115.00 $118.50 $118.50
(ii) Commercial $250.00 $257.50 $257.50
e. State Building Code Fee:
(i) All projects: $4.50 $4.50 $4.50
(ii) Multi-family projects: $4.50 $4.50 $4.50
(1) Each additional card: $2.00 $2.00 $2.00
f. Electrical Permit Fees:
(i) Residential Fees - Single -Family and Duplex
(1) New Service - Single Family and Duplex
(a) Up to 200 AMP $70.00 $206.00 $206.00
(b) Over 200 AMP $80.00 $206.00 $206.00
(2) Service Changes/New Circuits - Single Family and Duplex:
(a) Change up to 200 AMP $60.00 $150.00 $150.00
(b) Change over 200 AMP $75.00 $150.00 $150.00
(c) Any new circuits added to above price is per each up to a maximum of $80.00 $15.00 $20.00 $20.00
(d) Minimum fee for remodel/addition of new circuits without a service charge $60.00 $150.00 $150.00
(ii) Multi-Family, Commercial and Industrial Fees:
(1) Value of work:
$1.00 to $500.00 $60.00 $63.00 $63.00
$500.01 to $1,000.00 $45 + 3.3% of $47 + 3.5% of $47 + 3.5% of
value value value
$1,000.01 to 5,000.00
$78 + 2.9% of $82 + 3.05% of $82 + 3.05% of
value value value
2017/2018 Fee Schedule 6
City of Renton Fee Schedule
2017-2018
• � • � • � . � � :
$5,000.01 to $50,000.00 $223 + 1.7% of $234 + 1.8% of $234 + 1.8% of
value value value
$50,000.01 to $250,000.00
$1,073 + 1.0% $1,127 + 1.05% $1,127 + 1.05%
of value of value of value
$250,000.01 to $1,000,000.00
$3,573 + 0.8% $3,752 + 0.85% $3,752 + 0.85%
of value of value of value
$1,000,000.01 and up $11,573 + $12,152 + $12,152 +
0.45% of value 0.47% of value 0.47% of value
(iii) Temporary Electrical Services $60.00 $150.00 $150.00
(iv) Miscellaneous Electrical Fees
(1) Job Trailers $60.00 $150.00 $150.00
(2) Signs per each $60.00 $150.00 $150.00
(3) Mobile Homes $60.00 $150.00 $150.00
(4) Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable 50% of 50% of 50% of
television, etc.) commercial commercial commercial
fees Minimum fees Minimum fees Minimum
$60.00 $150.00 $150.00
Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations are exempt from fees
g. House Moving* - minimum per hour Inspection Fee: $100.00 $150.00 $150.00
*This covers only the Building Section inspection of the structure prior to move. There is a separate additional fee charged by the Public Works Department to cover the
actual house move permit. A building permit is also required in order to site the structure on the new site.
h. Inspection Fee For Condominium Conversions: $100 on 1st $150 on 1st $150 on 1st
unit / $15 each unit / $20 each unit / $20 each
add'I unit add'I unit add'I unit
i. Manufactured/Mobile Home Installation Fees*:
(i) Within a manufactured home park $100.00 $150.00 $150.00
(ii) Outside of a manufactured home park Building Permit Building Permit Building Permit
Fees Fees Fees
* Includes plan review and inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water connection fees are in addition to the below
amounts).
j. Mechanical Permit Fees:
(i) Basic permit fee plus itemized fees below: $45.00 $49.50 $49.50
(1) Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air $17.00 $18.75 $18.75
conditioner, chiller or Air Handling Unit (VAV) including ducts and vents)
(2) Boiler or Compressor:
(a) Single & Multi Family $17.00 $18.75 $18.75
(b) Commercial $60.00 $66.00 $66.00
(3) Commercial Refrigeration system $60.00 $66.00 $66.00
(4) Residential ventilation/exhaust fan $8.00 $8.75 $8.75
(5) Commercial ventilation/exhaust system not a portion of any heating or air conditioning system $17.00 $18.75 $18.75
authorized by a permit.
(6) Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such $50.00 $55.00 $55.00
hood each
(7) Incinerator: Installation or relocation of each $75.00 $82.50 $82.50
(g) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or $17.00 $18.75 $18.75
for which no other fee is listed in this code
(9) Fuel Gas Piping:
(a) Each gas-piping system of 1 to 4 outlets $12.00 $13.25 $13.25
(b) Each additional outlet over 4, per outlet $2.50 $2.75 $2.75
k. Plumbing Permit Fees:
(i) Base fee for all types of work; plus itemized fees below: $45.00 $49.50 $49.50
�1� Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap $8.00 $8.75 $8.75
(2) For meter to house water service $8.00 $8.75 $8.75
(3) Fuel Gas Piping:
(a) Each gas-piping system of 1 to 4 outlets $12.00 $13.25 $13.25
(b) Each additional outlet over 4, per outlet $2.50 $2.75 $2.75
(4) Per drain for rainwater systems $8.00 $8.75 $8.75
(5) Per lawn sprinkler system, includes backflow prevention $8.00 $8.75 $8.75
(6) Per fixture for repair or alteration of drainage or vent piping $8.00 $8.75 $8.75
(7) Per vacuum breaker or backflow protection device on tanks, vats, etc. $8.00 $8.75 $8.75
(8) Per interceptor for industrial waste pretreatment $8.00 $8.75 $8.75
(9) Medical Gas Piping:
(a) Each gas-piping system of 1 to 5 outlets $60.00 $66.00 $66.00
(b) Each additional outlet over 5, per outlet $5.00 $5.50 $5.50
I. Sign Permit Fees:
(i) Permanent Signs:
(1) Roof, projecting, awning, canopy, marquee, and wall signs $125.00 $250.00 $250.00
(2) Freestanding ground and pole signs $175.00 $250.00 $250.00
2017/2018 Fee Schedule 7
City of Renton Fee Schedule
2017-2018
• � • � • � . � � :
(ii) Temporary and Portable Signs:
(1) Real Estate Directional Signs, pursuant to RMC 4-4-100J2, permit valid for a 12-months period $50.00 $75.00 $75.00
(2) Grand Opening Event Signs, pursuant to RMC 4-4-100J6d(i) $50.00 $75.00 $75.00
(3) Event Signs, pursuant to RMC 4-4-100J6d(ii) and (iii) per sign, per promotion $25.00 $50.00 $50.00
(4) $100.00 $125.00 $125.00
A-Frame Signs, pursuant to RMC 4-4-100J5 Charge is for the first sign, all subsequent signs are $50.00
(5) Commercial Property Real Estate Banner each sign permit is valid for 12 months. $50.00 $75.00 $75.00
(6) Decorative Flags fee is per entrance and valid until flag(s) are removed $50.00 $75.00 $75.00
(iii) Request for Administrative Modifications of City Center Sign Regulations per RMC 4-4-100H9: $100.00 $150.00 $150.00
(iv) �Nork in Advance of Sign Permit Issuance: Where work for which the permit is required by this Title IV of RMC All above fees All above fees All above fees
is started or proceeded with prior to obtaining said permit, the fees above specified shall be doubled; but the doubled doubled doubled
payment of such double fee shall not relieve any persons from complying with the requirements in the
execution of the work nor from any other penalties prescribed herein.
m. Miscellaneous Fees:
(i) Minimum Housing Inspection:
(1) Assessed under the provisions of Section 305.8 of the International Building Code. $75.00 $100.00 $100.00
(2) WABO - Adult Family Home; Misc building inspection $100.00 $100.00 $100.00
(ii) Plan Review Fees for Electrical, Plumbing, or Mechanical Permits* 40% of permit 40% of permit 40% of permit
(iii) Reinspection Fee $75/hr $100.00 $100.00
(iv) Safe and Healthy Housing Program:
(1) Registration Fee
(a) 1 - 4 dwelling unit(s), each, per year N/A $12.00 $12.00
(b) 5 - 24 dwelling units, each, per year N/A $10.00 $10.00
(c) 25 or more dwelling units, each, per year N/A $8.00 $8.00
(d) Communal residence, each, per year N/A $20.00 $20.00
(2) City Inspection
(a) Initial inspection N/A $50.00 $50.00
(b) First (1st) reinspection N/A $90.00 $90.00
(c) Second (2nd) reinspection N/A $125.00 $125.00
(d) Third (3rd) reinspection N/A $200.00 $200.00
(3) Contractor Inspection; admin fee to City N/A $40.00 $40.00
(4) Appeal of Inspection N/A $250.00 $250.00
*In addition to the above permit fees, a plan check fee equal to forty percent (40%) of the permit fee may be charged when required by the Building Official.
2. Land Use Review Fees
a. General Land Use Review
(i) Additional Animals Permit $50.00 $50.00 $50.00
(ii) Address Change N/A $100.00 $100.00
(iii) Annexation:
(1) Less than 10 acres N/C $5,000.00 $5,000.00
(2) 10 acres or more N/C $2,500.00 $2,500.00
(iv) Appeal of:
(1) Hearing Examiner's Decision $250.00 $500.00 $500.00
(2) Administrative Decision $250.00 $500.00 $500.00
(3) Environmental Decision $250.00 $500.00 $500.00
(v) Binding Site Plan (total fee for both preliminary and final phases) $2,500.00 $5,000.00 $5,000.00
(vi) Code Text Amendment N/C N/C N/C
(vii) Comprehensive Plan Map or Text Amendment (each) $2,500.00 $5,000.00 $5,000.00
a. General Land Use Review (con't)
(viii) Conditional Use Permit
(1) HEX $2,500.00 $3,000.00 $3,000.00
(2) Administrative $1,000.00 $1,500.00 $1,500.00
(ix) Critical Areas Exemption N/C N/C N/C
(x) Critical Areas Permit N/A $1,200.00 $1,200.00
(xi) Critical Areas Review Fee: for those projects that propose impacts to critical areas and will be billed at 100% of 100% of 100% of
the cost of contract biologist's review.1 contract cost contract cost contract cost
(xii) Development Agreement N/A $10,000.00 $10,000.00
(xiii) 100% of cost 100% of cost 100% of cost
Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final Z
(xiv) Environmental Checklist Review $1,000.00 $1,500.00 $1,500.00
(xv) Fence Permit (special) $100.00 $150.00 $150.00
(xvi) Grading and Filling Permit (Hearing Examiner) $2,500.00 $5,000.00 $5,000.00
(xvii) Landscape Review Fee $100.00 $150.00 $150.00
(xviii) Legal Lot Segregation N/C N/C N/C
(xix) Lot Consolidation N/A $500.00 $500.00
(xx) Lot Line Adjustment $450.00 $1,000.00 $1,000.00
(xxi) Manufactured/Mobile Home Park:
(1) Tentative $500.00 $1,000.00 $1,000.00
(2) Preliminary $2,500.00 $3,000.00 $3,000.00
(3) Final $1,000.00 $1,500.00 $1,500.00
(xxii) Open Space Classification Request $100.00 $150.00 $150.00
2017/2018 Fee Schedule 8
City of Renton Fee Schedule
2017-2018
• � • � • � . � � :
(xxiii) Plats:
(1) Short Plat (total fee for both preliminary and final phases) $2,000.00 $5,000.00 $5,000.00
(2) Preliminary $4,500.00 $10,000.00 $10,000.00
(3) Final Plat $1,500.00 $5,000.00 $5,000.00
(xxiv) Planned Urban Development:
(1) Preliminary Plan $2,500.00 $5,000.00 $5,000.00
(2) Final Plan $1,000.00 $2,500.00 $2,500.00
(3) Reasonable Use Exception:
(a) In conjunction with land use permit N/A $500.00 $500.00
(b) Stand alone N/A $1,500.00 $1,500.00
(xxv) Rezone $2,500.00 $5,000.00 $5,000.00
(xxvi) Routine Vegetation Management Permit without Critical Areas $75.00 $100.00 $100.00
(xxvii) Shoreline-Related Permits
(1) Shoreline Permit Exemption N/C N/C N/C
(2) Substantial Development Permit $2,000.00 $2,500.00 $2,500.00
(3) Conditional Use Permit $2,500.00 $3,000.00 $3,000.00
(4) Variance $2,500.00 $3,000.00 $3,000.00
(xxix) Site Development Plan (Site Plan or Master Plan
which includes design review fee for projects subject to RMC 4-3-100):
(1) Hearing Examiner Review $2,500.00 $3,500.00 $3,500.00
(2) Administrative Review $1,500.00 $2,500.00 $2,500.00
(3) Modification (minor, administrative) N/C $250.00 $250.00
(4) Modification (major) required new application and repayment of fee required Application Application Application
Fees Fees Fees
(xxx) Special Permit (Hearing Examiner) $2,500.00 $2,500.00 $2,500.00
(xxxi) Temporary Use Permits:
(1) Tier 1 $75.00 $100.00 $100.00
(2) Tier 2 $150.00 $200.00 $200.00
(xxxii) Variance (per each variance requested) Administrative or Hearing Examiner $1,200.00 $1,300.00 $1,300.00
(xxxiii) Waiver or Modification of Code Requirements cost is per request $150.00 $250.00 $250.00
(xxxiv) Zoning Compliance Letter $400.00 $450.00 $450.00
b, Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King
County Land Use Review Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at
the City Clerk's office for public review.
1Per RMC 4-3-050F7, the City may charge and collect fees from any applicant to cover costs incurred by the city in review of plans, studies, monitoring reports and other
documents related to evaluation of impacts to or hazards from critical areas and subsequent code-required monitoring.
`When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the
EIS shall be prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the
applicant(s) of the projected costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may
determine that the City will contract directly with a consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the
applicant. Such consultants shall be selected by mutual agreement of the City and applicant after a call for proposals. If a proposal is modified so that an EIS is no longer
required, the ERC shall refund any fees collected under this subsection which remain after incurred costs are paid. The City may collect a reasonable fee from an applicant
to cover the cost of ineeting the public notice requirements of this Title relating to the applicant's proposal. The City shall not collect a fee for performing its duties as a
consulted agency. The City may charge any person for copies of any document prepared under this Title, and for mailing the document, in a manner provided by chapter
42.17 RCW.
3. Public Works Fees
a. Franchise Application Fee N/A $5,000.00 $5,000.00
b. Franchise Permit Fees:
n ess o erwise speci ie in a ranc ise agreemen , e ee s a e ue an paya e a or prior o e ime o cons ruc ion permi issuance. a ranc ise agreemen
does not specify the fee amount, the generic fee, as identified in the following table, shall be collected.
c. Street Excavation Bond*
(i) Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles $350.00 $350.00 $350.00
(ii) All other work permit fee plus $60.00 per overtime hour of inspection. $350.00 $350.00 $350.00
* Bond required pursuent to RMC 9-10-5
d. Latecomers' Agreement Application Fees:
(i) Processing fee* (Nonrefundable)
(1) If amount covered by latecomers' is $20,000.00 or less $500.00 $500.00 $500.00
(2) If amount covered by latecomers' is between $20,000.00 and $100,000.00 $1,000.00 $1,000.00 $1,000.00
(3) If amount covered by latecomers' is greater than $100,000.00 $2,000.00 $2,000.00 $2,000.00
(iv) Latecomers' Agreement - Administration and collection fee
(1) if amount covered by latecomers' is $20,000.00 or less 15% of total 15% of total 15% of total
(2) If amount covered by latecomers' is between $20,000.00 and $100,000.00 10% of total 10% of total 10% of total
(3) If amount covered by latecomers' is greater than $100,000.00 5% of total 5% of total 5% of total
(vii) Segregation processing fee, if applicable $750.00 $750.00 $750.00
*The processing fee is due at the time of application. The administration and collection fee is deducted from each individual latecomer fee payment and the balance
forwarded to the holder of the latecomer's agreement pursuant to RMC 9-5, Tender of Fee.
e. System Development Charge Tables:
(i) Water and Wastewater System Development Charges:
(1) 5/8 x 3/4 inch and 1 inch
(a) Water service fee $3,245.00 $3,486.00 $3,727.00
(b) Fire service fee a'b $422.00 $450.00 $477.00
2017/2018 Fee Schedule 9
City of Renton Fee Schedule
2017-2018
• � • � • � . � � :
(c) Wastewater fee $2,242.00 $2,540.00 $2,837.00
(2) 1-1/2 inch
(a) Water service fee $16,225.00 $17,430.00 $18,635.00
(b) Fire service fee a'b $2,110.00 $2,247.00 $2,384.00
(c) Wastewater fee $11,210.00 $12,700.00 $14,185.00
(3) 2 inch
(a) Water service fee $25,960.00 $27,888.00 $29,816.00
(b) Fire service fee a'b $3,376.00 $3,596.00 $3,815.00
(c) Wastewater fee $17,936.00 $20,320.00 $22,696.00
(4) 3 inch
(a) Water service fee $51,920.00 $53,776.00 $59,632.00
(b) Fire service fee a'b $6,752.00 $7,191.00 $7,630.00
(c) Wastewater fee $35,872.00 $40,640.00 $45,392.00
(5) 4 inch
(a) Water service fee $81,125.00 $87,150.00 $93,175.00
(b) Fire service fee a'b $10,550.00 $11,236.00 $11,922.00
(c) Wastewater fee $56,050.00 $63,500.00 $70,925.00
(6) 6 inch
(a) Water service fee $162,250.00 $174,300.00 $186,350.00
(b) Fire service fee a'b $21,100.00 $22,476.00 $23,843.00
(c) Wastewater fee $112,100.00 $127,000.00 $141,850.00
(7) 8 inch
(a) Water service fee $259,600.00 $278,880.00 $298,160.00
(b) Fire service fee a'b $33,760.00 $35,955.00 $38,149.00
(c) Wastewater fee $179,360.00 $203,200.00 $226,960.00
(ii) Storm Water System Development Charges:
(1) New single family residence (including mobile/manufactured homes) $1,485.00 $1,608.00 $1,718.00
(2) Addition to existing single family residence greater than 500 square feet (including 0.594 per sq 0.641 per sq 0.687 per sq
mobile/manufactured homes) Fee not to exceed $1,608 (2017) or $1,718 (2018) foot foot foot
(3) All other uses charge per square foot of new impervious surface, but not less than $1,608 (2017) or $0.594 $0.641 $0.687
$1,718 (2018) per sq foot per sq foot per sq foot
a Based upon the size of the fire service (NOT detector bypass meter)
b Unless a separate fire service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate fire service fee will not
be charged.
f. Administrative Fees for SDC Segregation Request*: $750 + $750 + $750 +
administrative administrative administrative
costs costs costs
*The applicant shall pay the City's administrative costs for the preparation, processing and recording of the partial payment of the fee(s). The adminitrative fee is
due at the time of application for special assessment district, and/or latecomer's charge partial payment for each segregation. If the same segregation is used for
more than one utility's special assessment district, and/or latecomer's charge, then only one administrative fee is collected.
3. Public Works Fees (con't)
g. Public Works Construction Permit Fees: The following public works construction permit fees, utility permit fees, and miscellaneous charges are payable at or prior to
the time of construction permit issuance.
(i) Water Construction Permit Fees:
(1) Water meter tests for 3/4" to 2" meter $50.00 $50.00 $50.00
(a) Water meter tests on meters 2" or larger $60 deposit + $60 deposit + $60 deposit +
time and time and time and
materials materials materials
(b) Open and close fire hydrants for fire flow tests conducted by others. Time and Time and Time and
materials materials materials
(c) Water service disconnection (cut at main) $250.00 $250.00 $250.00
(d) Meter resets $95.00 $95.00 $95.00
(e) Repair of damage to service $225.00 $225.00 $225.00
(f) Water main connections $535.00 $535.00 $535.00
(g) Water main cut and cap $1,000.00 $1,000.00 $1,000.00
(h) Water quality/inspection/purity tests $65.00 $80.00 $80.00
(i) Specialty water tests (lead, copper, etc)
Cost of test + Cost of test + Cost of test +
$70 processing $70 processing $70 processing
fee fee fee
(j) Water turn ons/offs after hours $185.00 $185.00 $185.00
(k) Installation of isolation valve. $2,000 deposit $2,000 deposit $2,000 deposit
+ time and + time and + time and
materials materials materials
(I) New water line chlorination fee. Fee plus $0.15 per lineal foot for any footage after the first two $250 + $0.15 $250 + $0.15 $250 + $0.15
hundred fifty (250) lineal feet per lineal per lineal per lineal
foot foot foot
(m) Miscellaneous water installation fees. Time and Time and Time and
materials materials materials
(n) Service size reductions $50.00 $50.00 $50.00
2017/2018 Fee Schedule 10
City of Renton Fee Schedule
2017-2018
• � • � • � . � � :
(o) Installation fees for ring and cover castings $200.00 $200.00 $200.00
(2) Water meter installation fees - City installed: The following fees are payable at the time of application for water meter installation(s).
(a) 3/4" meter installed by City within City limits. Installation of stub service and meter setter only. $3,075.00 $2,850.00 $2,850.00
(i) 3/4" meter drop in only $400.00 $400.00 $400.00
(b) 3/4" meter installed by City outside City limits. Installation of stub service and meter setter only. $3,310.00 $2,910.00 $2,910.00
(i) 3/4" meter drop in only $400.00 $400.00 $400.00
(c) 1" meter installed by the City. Installation of stub service and meter setter only. $3,310.00 $2,850.00 $2,850.00
(i) 1" meter drop in only $460.00 $460.00 $460.00
(d) 1-1/2" meter installed by the City. Installation of stub service and meter setter only. $5,330.00 $4,580.00 $4,580.00
(i) 1-1/2" meter drop in only $750.00 $750.00 $750.00
(e) 2" meter installed by the City. Installation of stub service and meter setter only. $5,660.00 $4,710.00 $4,710.00
(i) 2" meter drop in only $950.00 $950.00 $950.00
(3) NA $220.00 $220.00
Water meter processing fees - Applicant installed: For meters larger than 2", the applicant must provide
materials and installs. The City charges a $220.00 processing fee at the time of ineter application.
(4) Hydrant Meter fees: The following fees are payable at the time of application for a hydrant meter:
(a) Hydrant meter permit fee $50.00 $50.00 $50.00
(b) Deposits:
(i) 3/4" meter and backflow prevention assembly. $300.00 $500.00 $500.00
(ii) 3" meter and backflow prevention assembly. $800.00 $2,000.00 $2,000.00
(iii) Deposit processing charge, nonrefundable. $25.00 $25.00 $25.00
(c) Meter rental (begins on day of pickup):
(i) 3/4" meter and backflow prevention assembly. Per month. $11.66 $50.00 $50.00
(ii) 3" meter and backflow prevention assembly. Per month. $143.67 $250.00 $250.00
3. Public Works Fees (con't)
g. Public Works Construction Permit Fees: The following public works construction permit fees, utility permit fees, and miscellaneous charges are payable at or prior to
the time of construction permit issuance. (con't)
(ii) Wastewater and surface water construction permit Fees:
(1) Residential:
(a) Wastewater permit fee $250.00 $300.00 $300.00
(b) Surface water permit fee $250.00 $300.00 $300.00
(2) Commercial:
(a) Wastewater permit fee $300.00 $300.00 $300.00
(b) Surface water permit fee $300.00 $300.00 $300.00
(3) Industrial:
(a) Wastewater permit fee $300.00 $300.00 $300.00
(b) Surface water permit fee $300.00 $300.00 $300.00
(4) Repair of any of the above
(a) Wastewater permit fee $200.00 $300.00 $300.00
(b) Surface water permit fee $200.00 $300.00 $300.00
(5) Cut and cap/Demolition permit
(a) Wastewater permit fee $250.00 $300.00 $300.00
(b) Surface water permit fee $250.00 $300.00 $300.00
(6) Reinspection for Watewater or Surface Water Permits N/C $300.00 $300.00
(7) Ground water discharge (temporary connection to wastewater system for discharge of contaminated $300.00 $300.00 $300.00
ground water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on plus King plus King plus King
discharged amount (meter provided by property owner) County County County
sewer rate on sewer rate on sewer rate on
discharged discharged discharged
amount amount amount
(iii) Work in right-of-way - construction permit: Utility and street/sidewalk improvements: A bond is required, as stipulated in RMC 9-10-5, Street Excavation
Bond.
(1) Less than 35 feet in length $100.00 $100.00 $100.00
(2) 35 to 100 feet in length $125.00 $125.00 $125.00
(3) Greater than 100 feet in length $150.00 $150.00 $150.00
(4) Wastewater or storm water service $150.00 $300.00 $300.00
(5) King County ROW Permits/Inspections
(a) Service Installation Only $600.00 $1,000.00 $1,000.00
(b) Utility Extension per 100' of Length (Min 200' Length) $300.00 $500.00 $500.00
(iv) Street light system tee, per new connection to power system (payable at or prior to the time ot $500.00 $500.00 $500.00
construction permit issuance):
Exception: No permit fee shall be charged for individual homeowners for work in street rights-of-way for street tree or parking strip irrigation systems.
h, u ic wor s p an review an inspec ion ees : eve opers, municipa or quasi-municipa en i ies, or u i i y corpora ions or companies, excep ose speci ica y
exempted, shall pay fees under this Section. Exempted entities include City-franchised cable TV, cable modem, natural gas, telecommunications, and electrical power.
Half of this fee must be paid upon application and the remainder when the permit(s) is issued. There are additional construction permit fees which are also payable
upon issuance. The fee will be based upon percentages of the estimated cost of improvements using the following formula.
(i) Street and utility plan review and inspection fees; estimated construction cost : The applicant must submit separate, itemized cost estimates for each item of
improvement subject to the approval by the Public Works Plan Review Section.
(1) $150,000.00 or less 6% of cost 6% of cost 6% of cost
(2) Over $150,000.00 but less than $300,000.00. $9,000 + 5% $9,000 + 5% $9,000 + 5%
over $150,000 over $150,000 over $150,000
2017/2018 Fee Schedule 11
City of Renton Fee Schedule
2017-2018
• � • � • � . � � :
(3) $300,000.00 and over. $16,500 + 4% $16,500 + 4% $16,500 + 4%
over $300,000 over $300,000 over $300,000
(ii) Standard or minor drainage adjustment review $550.00 $550.00 $550.00
1lncludes three (3) review cycles. Additional reviews will be charged $1,500 each.
`Construction cost, also known as the Engineer's Estimate or the Contractor's Bid, shall mean cost estimate for all project related improvements outside of the building
envelopes, including, but not limited to, all costs required to construct the following: paved parking lots, private sidewalks or walkways; private and public storm water
management facilities; temporary erosion and sedimentation control facilities; water quality facilities; public and private streets; public and private sanitary sewers;
public water main improvements; required off-site street, bike and pedestrian improvements; street lighting improvements; required landscaping and street tree
improvements; and site grading and mobilization costs.
3. Public Works Fees (con't)
i. Grade and Fill License Fees: Fees shall be based on Tier.
Cleared or Distrurbed
Grade and Fill Quantity Area New or Replaced Hard Surface Tier
< 50 cy < 7,000 sf < 2,000 sf 1
50 cy - 499 cy 7,000 sf - < 3/4 acre 2,000 sf - 4,999 sf 2
500 cy - 4,999 cy 3/4 ac - < 1 ac 5,000 sf - < 1 ac 3
5,OOOcy - 49,999cy 1ac - < 2.5ac 1ac - < 2.5ac 4
50,OOOcy - 99,999cy 2.5ac - < 5ac 2.5ac - < 5ac 5
100,000 cy and larger 5 ac and larger 5 ac and larger 6
(i) Review/Intake Fee1:
(1) Tier 1 N/A $155.00 $155.00
(2) Tier 2 N/A $466.00 $466.00
(3) Tier 3 N/A $621.00 $621.00
(4) Tier 4 N/A $932.00 $932.00
(5) Tier 5 N/A $1,242.00 $1,242.00
(6) Tier 6 N/A $1,553.00 $1,553.00
(ii) Inspection/Issuance FeeZ:
(1) Tier 1 N/A $148.00 $148.00
(2) Tier 2 N/A $444.00 $444.00
(3) Tier 3 N/A $887.00 $887.00
(4) Tier 4 N/A $1,183.00 $1,183.00
(5) Tier 5 N/A $2,366.00 $2,366.00
(6) Tier 6 N/A $3,550.00 $3,550.00
(iii) 1.5 x plan 1.5 x plan 1.5 x plan
Solid Waste Fills: check fee check fee check fee
The plan check fee for solid waste fills shall be one and one-half (1-1/2) times the plan checking fees
listed above. The fee for a grading license authorizing additional work to that under a valid license shall
be the difference between the fee paid for the original license and the fee shown for the entire project.
(iv) Annual Licenses of Solid Waste Fills: 1.5 x plan 1.5 x plan 1.5 x plan
The fee for annual licenses for solid waste fills shall be one and one-half (1-1/2) times the plan checking check fee check fee check fee
fees listed above. The fee for a grading license authorizing additional work to that under a valid license
shall be the difference between the fee paid for the original license and the fee shown for the entire
project. Any unused fee may be carried forward to the next year. If any work is done before the license
is issued, the grading license fee shall be doubled.
1lntake/review fees are payable at the time of application.
Zlnspection/Issuance fees are payable at the time of issuance.
j. Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9-1 RMC, Easements.
(i) Filing fee, payable at the time of application $250.00 $250.00 $250.00
(ii) Processing fee (paid upon Council approval of release of easement) $250.00 $250.00 $250.00
k. Right-of-Way use permit fees & Revocable permits for the Use of Excess Public Right-of way: These fees are payable at the time of application. The imposition,
collection, payment and other specifics concerning this charge are detailed in chapter 9-2 RMC, Excess Right-of Way Use.
(i) Single family and two family uses annually, fee plus leasehold excise taxl if applicable $10.00 + LET1 $10.00 + LET1 $10.00 + LET1
(ii) All uses without public benefit fee is a per month charge based on property value2 of land to be utilized, plus 0.5% x ValueZ 0.5% x ValueZ 0.5% x ValueZ
leasehold excise tax1, if applicable. Payable yearly in advance LET1 LET1 LET1
(iii) Uses with public benefit fee is a per year of assessed value of land adjoining the property, plus leasehold 0.5% x ValueZ 0.5% x ValueZ 0.5% x ValueZ
excise tax1, if applicable. In no case less than $10.00. Payable yearly in advance. LETZ LET1 LET1
(iv) Insurance Required:
Public Liability and property damage insurance is also required pursuant to RMC 9-2-5B, Minimum Permit
Requirements for Excess Right-of-Way Use.
(v) Exception for Public Agencies:
a no-fee permit may be issued only when the applicant is a public agency and when the proposed use of the
right-of-way provides a direct service to the public (e.g., Metro applications for right-of-way for bus shelters).
1There is hereby levied and shall be collected a leasehold excise tax on that act or privilege of occupying or using public owned real or personal property through a
leasehold interest at the rate established by the State of Washington
ZRight-of-way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor
I. Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9-14 RMC, Vacations.
(i) Filing fee, payable at the time of application $500.00 $500.00 $500.00
2017/2018 Fee Schedule 12