Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCO 02--
Date:
RE N T O N
Federal Aid:
AHEAD OF 'r H E CURVE
State Contract:
1055 South Grady Way
Contract:
Renton, WA 98057
Projects:
Change Order:
CONTRACTOR:
Atkinson Construction
707 S. Grady Way Suite 500
Renton, WA 98057
PROJECT:
Strander Blvd, SW 27`h St Extension
Phase 1
CAG -11 -133, CO #2 -12
5.2012 11 Review
©
Documentation
HPP1276(0051 ©
Resident Engr.
©
Materials Appr Engr.
-133 ©
City Project Manager
10
Finance (>10 %)
RECAPITULATION
ORIGINAL CONTRACT:
PREVIOUS ADDITIONS:
PREVIOUS DEDUCTIONS:
PREVIOUS TOTAL.
THIS CHANGE (ADD.):
(DED.):
ADJUSTED TOTAL.
$ 11.381,158.70
$ 0.00
$ 0.00
$ 11,381,158.70
$ 43,096.00
$ 0.00
$ 11,424,254.70
Sections 1 -04.4 and 1 -04.5 of the 2010 Standard Specifications shall govern the issuance of this Change Order. The work of
this contract is herein modified to include the change detailed below. Additional quantities for existing and new items shall
constitute the complete and final settlement for all costs of labor, material, equipment, overhead, profit, permit fees, damages
(whether direct or indirect), and all other claims by the contractor as a result of this change.
The time for completion is not changed by this Change Order;
zero worldng days are hereby added to the contract.
(CONTINUED NEXT PAGE...
Your proposal and this acceptance shall constitute and become part of the contract,
subject to all conditions contained therein, as modified by is Change Order.
Accepted on: Approved b y /
Date City of Renton Transportation Design Supervisor Date
ay:
Atk,'n4 Construction /
Acknowledged by:
Surety
Surety Seal (if Applicable)
Page 1 of 2 Logged (City of Renton use only)
2.21.2012
I.........................................................................._......_._................................................................................................. ..............................a
Atkinson Construction
Strander Blvd., SW 2711, St Extension
Change Order 1
February 15, 2012
Reason for Change:
Plan sheet TE -3 details two temporary access roads south of the SPU waterline that the Contractor may
elect to use dependent upon which SPU crossing the Engineer approves for use. The City of Renton and
Sound Transit agreed to construct the access road to the alignment of the future Temporary Access Road
that connects to the Sound Transit Driveway Access. This alignment dictated the use of the west crossing
and the new access road will be 30 feet wide in lieu of the plan 15 feet wide. The road shall be constructed
using Construction Geotextile for Separation with a 1 foot layer of Quarry Spalls placed over the fabric.
The roadway shall be constructed to the revised alignment and details included on the attached plan sheet.
Add the Following New Item to Contract CAG 11 -133:
Description:
New Bid Item 138 represents full payment for all labor, equipment, and material necessary to con-
struct the revised access road as described in this change order and shown on the included revised
plan sheet. This includes additional surveying and traffic control required for the construction and
all maintenance required throughout the duration of the project, no further compensation will be
made.
New Item 138: Revised Access Road — Sound Transit
By Lump Sum @ $43, 096 ..................................................... ............................... $43,096
Total this Change Order .................................... ............................... ........................ $43,096
Page 2 of 2
•
u
` no
V'
v
4
0
d
v
v
y
� v
v�
I!
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
-3
i 17-771
a h. i
b� }
¢;
4'
z
O
Q
U
O
J
Q
O
(/)
W
U
U
Q
Z
Q
^J^
I�L
J
Q
Z
C�
O
E79 +[�O[ Id
O
O
O
0
0
O
n
0
O
0
00
N
O
O
0
+
N
O
i
i
o
i +
i
Io
0
CT
r
i i
cc
0
i
i
nd
iCD
00
O
i
CD
+ I
i o
i
i�
i
o
io
o
I
+
o
C�
I
O
I
00
I
O
II
IO
LO
I
O
Q
{: O
cn w
O
z�
o
Q z
+
cif O
D Q
cz
Z D
� Q
O
y y
p
Q
W
(_n W
O
U
+
W U
N
E79 +[�O[ Id
O
O
O
0
0
O
n
0
O
0
00
N
O
O
0
+
N
O