HomeMy WebLinkAboutCO 1 CITY OF RENTON CAG-11-148, CO #1-11 Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 11-148 SANITARY SEWER REPAIRS 2011 C.O.# 1 CONTRACTOR: SHORELINE CONSTRUCTION CO. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Price Total Price 019. NEW ITEM:Additional Work to Repair a broken side sewer at 683 Shelton LS 1 $902.45 $902.45 Ave NE. (Shoreline Construction Co. Invoice dated 11/17/2011) 020. NEW ITEM:Additional Work and materials to cut through existing steel LS 1 $3,203.00 $3,203.00 casing on manhole 5304-235 to install new interior drop connection. (Shoreline Construction Co. Invoice dated 11/23/2011) 021. NEW ITEM:Additional Work, Materials and Traffic Control to seal permanent LS 1 $839.77 $839.77 patch in NE Sunset Blvd due to deletion of the contract overlay. (Shoreline Construction Co.Invoice dated 11/23/2011) 022. NEW ITEM:Additional Work and Materials to replace a deteriorated LS 1 $15,588.94 $15,588.94 manhole(5309-043)with a new manhole. (Shoreline Construction Co. Invoice dated 11/3/2011) Sub Total $20,534.16 Sales Tax (9.5%) $1,950.75 Total $22,484.91 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $158,096.10 $158,096.10 $22,484.91 $180,581.01 SIGNATURES: Contractor: Date: 11 1711 I Project Engineer: Date: /! 9 Approved By: Date: i tili ies S ec r) H:FileSys\W WP-Wastewater\W W P-27-3590\CO-1-Sanitary Sewer Repairs 2011/JDH