HomeMy WebLinkAboutAdden 3 wMENDMENT FACE SHED CAG-10-014, Adden #3-14
Grant Number: UV09-951-097
PROJECT COMPLETION AMENDMENT
Washington State Department of Commerce
PUBLIC WORKS BOARD
2009-2011 WASHINGTON STATE CAPITAL BUDGET
Urban Vitality Grant Program
1. Contractor 2. Contractor Doing Business As (optional)
City of Renton N/A
Transportation System Division
1055 S. Grady Way
Renton, WA 98057-3232
3. Contractor Representative(only if updated) 4. Public Works Board Representative(only if updated)
N/A N/A
5. Original Grant Amount 6. De Obligation 7. Final Grant Amount
$500,000.00 $0.00 $500,000.00
8. Amendment Funding Source 9. Amendment Start Date 10. Amendment End Date
Federal:❑ Stater Other:❑ N/A:❑ Amendment Execution Date Upon Project Completion
11. Federal Funds(as applicable) Federal Agency CFDA Number
N/A N/A N/A
12. Amendment Purpose
The purpose of this Amendment is to certify the project completion for the 2009-2011 Urban Vitality Grant Contract
U V09-951-097.
The Board, defined as the Washington State Public Works Board, and Contractor acknowledge and accept the terms of
this Contract As Amended and attachments and have executed this Contract Amendment on the date below to start as
of the date and year referenced above. The rights and obligations of both parties to this Contract As Amended are
governed by this Contract Amendment and the following other documents incorporated by reference: Amendment
Terms and Conditions, including Attachment I: Certified Project Completion Report. A copy of this Contract
Amendment shall be attached to and made a part of the original Contract between the Board and the Contractor. Any
reference in the original Contract to the "Contract" shall mean the "Contract As Amended."
FOR THE C TRACTOR FOR PUBLIC WORKS BOARD
Signature Stan Finkelstein, Public Works Board Chair
Denis Law, Mayor
Print Name Date
ATTEST:
Bonnie I . Walton, City Clerk APPROVED AS TO FORM ONLY
020 T This 26'h Day of July. 2010
Date Rob McKenna
Attorney General
Signature on File
Kathryn Wyatt
Assistant Attorney General
City of Renton Page 1 Project Completion Amendment
UV09-951-097 7/8/2014 2009-2011 Urban Vitality
AMENDMENT TERMS AND CONDITIONS
PUBLIC WORKS BOARD
2009-2011 WASHINGTON STATE CAPITAL BUDGET
Urban Vitality Grant Program
The purpose of this amendment is to acknowledge the project has been certified complete and the final
grant amount on for the 2009-2011 Washington State Capital Budget Urban Vitality Grant Contract
UV09-951-097 has been adjusted, if necessary, as reflected below.
The Public Works Board(or its successor),a department of the state of Washington(hereinafter referred
to as the"Board"), and City of Renton(hereinafter referred to as the "Contractor") agree to amend the
2009-2011 Washington State Capital Budget Urban Vitality Grant Contract UV09-951-097 as described
below.
All of the activities identified in the Project Scope of Work of 2009-2011 Washington State Capital
Budget Urban Vitality Grant Contract UV09-951-097 are complete and the final amount of the grant
shall be$500,000.00.
The attachment to this amendment, Attachment I: Certified Project Completion Report,includes the
following sections: Project Manager or Consultant Certification; Chief Executive Officer Certification;
Estimated and Actual Project Costs by Cost Category; Estimated and Actual Project Funding; Final
Reimbursement Calculation; and Project Performance Measures Report.
City of Renton Page 2 Project Completion Amendment
UV09-951-097 7/2/2014 2009-2011 Urban Vitality
'r✓ "Wool
ATTACHMENT I: CERTIFIED PROJECT COMPLETION REPORT
PUBLIC WORKS BOARD
2009-2011 WASHINGTON STATE CAPITAL BUDGET
Urban Vitality Grant Program
Grant Number: UV09-951-097 Contractor:City of Renton
Project Name: Rainier Ave South(SR 167)-S Grady Way Address: 1055 S. Grady Way
To S 2nd
Project Completion Date: 6/25/2014 Renton,WA 98057-3232
PROJECT MANAGER OR CONSULTANT CERTIFICATION
The Project Manager or Consultant of the Contractor certifies that:
• To the best of his/her knowledge,the data provided in this report is true and correct as of the signature date
indicated below;
• The project was completed in accordance with the Contract's Project Scope of Work;and
• The project was completed on June 25,2014
(Enter Actual Date of Project Completion)
Transportation Design Section Manager,Certified Authority
S' nature orfrojeYMfmager or Consultant Title
Robert M. Hanson A Z/(�
Print Name Date of Signature
CHIEF EXECUTIVE OFFICER CERTIFICATION
The Chief Executive Officer of the Contractor certifies that:
• To the best of his/her knowledge,the financial information and data provided in this report is true and correct as of
the signature date indicated below,and no project costs listed in this report incurred after the actual date of the
project completion as entered above;
• Records supporting the information provided in this report are on file and will be made available by the Contractor
upon request; and
;�Z/ Mayor
Signature of Chief Execu ve Officer Title
Denis Law
Print Name Date of Signature
Attest •
Bonnie I . Wal((t�,o'n,�'ICity Clerk
City of Renton Page 3 Attachment I:Certified Project Completion Report
UV09-951-097 7/2/2014 2009-2011 Urban Vitality
ESTIMATED AND ACS,TUAL PROJECT COSTS BY COST CATEGORY
F
Engineering Report $5,782,407.00' $5,782,407.00
Cultural&Historical Resources Review_ _ µ$50,000.0Q $50,©00:00
Section 106 or EO 05-05) _
Environmental Review $50,000.00 $50,000.00
Land/Right-of-Way Acquisition $5,000,984.00 $6,687,716.39`
Permits __ _ _ $100,000.00 $100,000.00
Public Involvement/information n^ 100,000.00 $100,000.00
Bid Documents $50,000.00
Other Fees(Sales or use Taxes) $1,434,246.00 $206,06,3.14
Construction _ $15,697,300.00 $17,023,134.13
Other:Construction'Management and
Inspection $0.00 ._ $3,403,312.98
Other: w...n...-.. ...__ ._. ._.. ..�.._ .....� $0.00 $0.00
Other:� � �_$0.00 .-$0.x}0
Other: ...-...____w�� .�..___� _-_. �..._...._.._._.._..v._... .. $0.00 _, .. _ _..._......-.�._.�.-� $0.00
Other: $0.00 _ ��$0.00,
_ __.v __� _ _•_________ __ .._..____ _w
Other: $0.00 $0.00
x
City of Renton Page 4 Attachment I:Certified Project Completion Report
UV09-951-097 7/2/2014 2009-2011 Urban Vitality
ESTIMATED AND ACTUAL PROJECT FUNDING
This Urban Vitality ; Washington State Public $500,000.00 $500,000.00
Grant Works Board
t RIM, t x � � 7- 1
�dP, + s "� jtl
Grant#1 ARRA-FHWA $2,000,000.00 $1,943,674.00
Grant#2 STP/CMAQ $4,800,000.00 $4,797,405.00
_ ____.____-_----__-________________________-----
.
Grant#3 TIB/WSDOT $7,369,700.00 $7,361,700.00
Total Grants $14,169,700.00 $14,102,779.00
�i�Fz��,`+^, ,�I*:., `�'�� z' rya[ �"`k.,,«w����.�kG %u.w.��uv`:v'�3uw�g•.�'�tt,�z+'�aw �s'C_Gh €� auz �:`x#(� �tH�, (�:r� r'�. �,�"r �-°�`'�,§r�T.m�,�i� .�. c�` �} €�.
w
Loan#1 $0.00 $0.00
Loan#2 $0.00 $0.00
� Loan#3-�__..____._______�-_____�_�.____-_._.:_�.__
._._.__-_______.____.._..__._________._m_ ._�___.$0.00 $_0.00
Total Loans $500,000.00 _$0.00
F.;✓' dxs?;?±'.#qutr h ..r. x 'tl'�`I `: +' �wJr:'f4a tGzre�� ,,� x "*hT E
1 s c„ �5` r !. tr yppty"P �*xma tiz:r to
`,zf?', fr 1.g v+SF, �'a.azy �.
.,.,. ,�.. ,✓,..- ^� w.,. .ttf, a ..���,�.: .- ,.'�w 5�i,. „�,^�"'+e•3 �zM � „C'' a W..?'°, �a"',i s&r�m 1z`x"W��
Local Revenue#1 I City Fund $3,547,717.00 $6,594,891.35
Local Revenue#2 Sound Transit $11,725,000.00 $11,725,000.00
Local Revenue#3 $0.00 $0.00
Total Local Revenue $15,272,717.00 $18,319,891.35
ggg
Other Funds#1 DOE Grant $0.00 $529,963.29
__......._-__. -____ .._...w_..______ �___m__ __--.--__ --___-----______________..._._______n_... _.-n--. _-__
_Other Funds#2 1 _$0.00 $0.00
Total Other Funds $0.00 $529,963.29
FINAL REIMBURSEMENT CALCULATION
- .. _
Grant Amount at Contract Execution $500,000 00
_... --
Total Actual Project Costs $33,452,633 64 1
------- - _.. ------------- . ._.... .... .__.._... --- -- . ___ _.W.-. .___...
Grant Amount at Project Completion(the final grant amount cannot exceed $500,000.00 {
the Grant Amount at Contract Execution or the Total Actual Project Costs)
------.
Total Reimbursed To Date $449,999 99 1
--------------------- __ ______------_-. ._- _._____....._-_ _ ____--__ -.-______----_---____-----__________--_-.-_.__ _._. _..__ ... ._-.-_- --_ ____-_-_
4 Final Reimbursement(refund due if number is negative) $50,000.01
----------------- -------------- - ----------------
! De Obligation* $0.00
L— _.--------------- _ _ ------------------__-------------
*If there is no refund due,De-Obligation=Grant Amount at Execution less Grant Amount at Project Completion.
If there is a refund due,De-Obligation=Grant Amount at Execution less Total Reimbursed To Date.
City of Renton Page 5 Attachment I:Certified Project Completion Report
UV09-951-097 7/2/2014 2009-2011 Urban Vitality
PROJECT PERFORMANCE MEASURES REPORT
The project performance measures listed below must be accomplished by 6/1/2018**.
The general purpose traffic will experience a reduction in PM peak delay. Without the improvements,delay
per vehicle has been estimated to be 143 seconds.After the project is completed,delay will be reduced to 116
seconds.
How will the performance measures be measured:
The traffic delay will be measured by field observation(travelling through the Rainier corridor)and the
results compared to the modeling data.
Please note that the full reduction in vehicle traveled mile is anticipated for 2018.Research by the University
of Princeton has indicated that with the transit travel travel time savings,ridership will increase 1% after the
first year of implementation,gradually increasing to 4%after 4 years of implementation.
Vehicle Miles Reduction:
Vehicle miles reduced as a result of project: 234000
**If these performance measures are not yet completed,this date represents the anticipated date on which the Contractor
will submit a Performance Measure Report/Update to the Public Works Board.
Project and Community Benefit in Jobs:
Construction jobs project created by this project: 70
Jobs created/retained as a result of this project being completed: 18
City of Renton Page 6 Attachment I:Certified Project Completion Report
UV09-951-097 7/2/2014 2009-2011 Urban Vitality