Loading...
HomeMy WebLinkAboutCO 2Jun 25 10 04:35p Val Varin 4^'-687-4912 CITY OF RE9TON r..0 "me JUL 0 2 2010 CITY OF REN TO Public Works Department RECEIVED CITY CLERK'S OFFICE CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAO 0111-173.— 2009 Earlington Water and Sewer Improvements Project C.0.# 2 CONTRACTOR: Laser Underground and Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for tine complete work required for the extra work as outlined below: ITEM Additional Quantities lender This Change Order Unit a' uantitY ---Unit _-..—Total Price CO2 Additional work for Sewer Utility: core drilling and LS 1 $21,659.65 $21,659.64 installing sewer drop connections, chipping hole in existing manhole for revised alignment, locating missing side sewer for mouse #500 on Earlington Additional work for Water Utility: installation of air -vac EA 2 $4,185.00 $8,370-00 assemblies. Additional costs due to delay of work from crossing LS 1 $24,055.90 $24,055.50 mislocated/missing utilities. $54,085,54 -_.—~ Subtotal 5,138.13 9.5% Sales Tax $ iotal— --- $59,22.3.61 ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET I ESTIMATED CONTRACT AMOUNT AMOUNT CHANGE THIS ORDER TOTAL AFTER CHANGE --- � 06T'.24 l ry ..pp 6�^ �q{ q��gg 843.57 $59,223.6.7.r.._. ... $2,248, _— yi'9Gy3i72,�.2�.�� �2y1'C9�p_-_- ..�.T _-_ Water Utility Sewer Utility SIGNATURES: Cantractor:--- Project Engineer: - Approved 3y: (Water Utility Supervisor) Cost Allocation 425.455170.018.595.34.63-000 426.4615405,018.595.35.63.000 , �42,1.�a6.6"a D at e: -._-- Date: Date: L'..File. sv,A?` l R 1)rinkitzr water Utility""W"J 1 -? ; - 1t-atcr Project Fi1eS\1XTR-27-3052- 2009 Farlin'tor Fater and SeIaer ItT}pr«;rrncn[s'.Constr:rtii n'a'. L.91 inI'll CS, t_han!2e0rdcr2_6-29-10.L)OC�/A�k'ah