HomeMy WebLinkAboutCO 2Jun 25 10 04:35p Val Varin 4^'-687-4912 CITY OF RE9TON
r..0 "me
JUL 0 2 2010
CITY OF REN TO
Public Works Department
RECEIVED
CITY CLERK'S OFFICE
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: CAO 0111-173.— 2009 Earlington Water and Sewer Improvements Project C.0.# 2
CONTRACTOR: Laser Underground and Earthworks, Inc.
SUMMARY OF PROPOSED CHANGE:
Provide all labor, equipment, subcontracting, bonding, insurance for tine complete work required for the extra
work as outlined below:
ITEM Additional Quantities lender This Change Order Unit a' uantitY ---Unit _-..—Total Price
CO2 Additional work for Sewer Utility: core drilling and LS 1 $21,659.65 $21,659.64
installing sewer drop connections, chipping hole in
existing manhole for revised alignment, locating missing
side sewer for mouse #500 on Earlington
Additional work for Water Utility: installation of air -vac EA 2 $4,185.00 $8,370-00
assemblies.
Additional costs due to delay of work from crossing LS 1 $24,055.90 $24,055.50
mislocated/missing utilities.
$54,085,54
-_.—~ Subtotal
5,138.13
9.5% Sales Tax $
iotal— --- $59,22.3.61
ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATED NET I ESTIMATED CONTRACT
AMOUNT AMOUNT CHANGE THIS ORDER TOTAL AFTER CHANGE
--- � 06T'.24 l
ry ..pp 6�^ �q{ q��gg 843.57 $59,223.6.7.r.._. ... $2,248, _—
yi'9Gy3i72,�.2�.�� �2y1'C9�p_-_- ..�.T _-_
Water Utility
Sewer Utility
SIGNATURES:
Cantractor:---
Project Engineer: -
Approved 3y:
(Water Utility Supervisor)
Cost Allocation
425.455170.018.595.34.63-000
426.4615405,018.595.35.63.000
,
�42,1.�a6.6"a
D at e: -._--
Date:
Date:
L'..File. sv,A?` l R 1)rinkitzr water Utility""W"J 1 -? ; - 1t-atcr Project Fi1eS\1XTR-27-3052- 2009 Farlin'tor Fater and SeIaer ItT}pr«;rrncn[s'.Constr:rtii n'a'.
L.91 inI'll CS, t_han!2e0rdcr2_6-29-10.L)OC�/A�k'ah