Stormwater Site Plan/Report
Grant Place Townhomes
1600 Grant Avenue S
Renton, WA 98055
Permit #:
Parcel # 202305-9052
For: Satwant Singh
15 S Grady Way
Ste. 527
Renton, WA 98057
(206) 391-3311
April 3, 2023
Revised:
Prepared by: R. Elliott, E.I.T.
FES Project #20069
4/3/2023
R
G
G
N
A F
U
R
SE
F
ORP
I ANO EL
T
S
GE SI
N
ERE DEEATDSNTAWFO
.
SAHI
INREENOTR46937
FES Project 22061 TOC
TABLE OF CONTENTS
1.0 PROJECT OVERVIEW ................................................................................................ 2
Technical Information Report (TIR) Worksheet ........................................................... 3
Vicinity Map ................................................................................................................ 8
2.0 CONDITIONS AND REQUIREMENTS SUMMARY ..................................................... 9
2.1 Analysis of the Nine (9) Core Requirements ....................................................... 10
2.2 Analysis of the Five Special Requirements ......................................................... 12
2.3 Conditions of Approval ........................................................................................ 13
3.0 OFFSITE ANALYSIS ................................................................................................. 14
Downstream Map ...................................................................................................... 17
Downstream Table .................................................................................................... 18
4.0 FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID) AND WATER QUALITY
FACILITY ANALYSIS AND DESIGN ...................................................................... 19
4.1 VAULT ANALYSIS .............................................................................................. 19
4.2 WATER QUALITY SYSTEM ............................................................................... 22
Developed Conditions Exhibit ................................................................................... 23
StormFilter Detail ...................................................................................................... 24
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN................................................. 36
6.0 SPECIAL REPORTS AND STUDIES ......................................................................... 37
7.0 OTHER PERMITS ...................................................................................................... 38
8.0 CSWPP ANALYSIS AND DESIGN ............................................................................ 39
9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
................................................................................................................................ 40
10.0 OPERATIONS AND MAINTENANCE MANUAL ........................................................ 41
Appendix A: Pacific Engineering Downstream Analysis ............................................... 52
Appendix B: Geotechnical Report ................................................................................... 53
Appendix C: As-Built Survey Drawings ........................................................................... 54
Page 2
1.0 PROJECT OVERVIEW
This project proposes the construction of eight townhouse buildings on a single 92,828 sf (2.131
ac) parcel (no. 202305-9052) located at 1600 Grant Ave. S, Renton, WA 98055. This project is
the continuation of an expired plat (civil permit no. U16004475); currently, the site is partially
developed with several constructed buildings, building foundations, utilities, and rough-graded
alley.
Stormwater onsite is collected by the onsite storm system and conveyed into a combined
detention/wetvault, which discharges through a Contech StormFilter manhole and into the
municipal storm system within Grant Ave. Low Impact Development (LID) BMPs are generally
infeasible onsite due to unsuitable soils, high/perched groundwater, and the amount of completed
construction onsite. A letter from a licensed geotechnical engineer has been added to the 2005
geotechnical investigation to confirm site conditions and to approve construction to continue as
proposed.
The City of Renton has amended the 2021 King County Stormwater Design Manual (KCSWDM)
to create the 2022 City of Renton Surface Water Design Manual (CoRSWDM), which serves as
the governing document for stormwater management within the city. This report shall serve to
comply with the updated requirements of this manual and the Renton Municipal Code.
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner
Phone _____
Address
Project Engineer
Company ____
Phone _______
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name _
DLS-Permitting
Permit #_____
Location Township
Range _
Section _
Site Address _______
Part 3 TYPE OF PERMIT APPLICATION
□ Land use (e.g.,Subdivision / Short Subd. / UPD)
□ Building (e.g.,M/F / Commercial / SFR)
□ Clearing and Grading
□ Right-of-Way Use
□ Other ___________________________
Part 4 OTHER REVIEWS AND PERMITS1
□ DFW HPA
□ COE CWA 404
□ ECY Dam Safety
□ FEMA Floodplain
□ COE Wetlands
□ Other _________
□ Shoreline
Management
□ Structural
Rockery/Vault/______
□ ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
□
□
□
□
□
Full
Targeted
Simplified
Large Project
Directed
Site Improvement Plan (Engr. Plans)
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
□ Full
□ Modified
□ Simplified
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Experimental /Blanket
Description: (include conditions in TIR Section 2)
Approved Adjustment No._ _ Date of Approval: __________________________
1 DFW: WA State Dept. of Fish and Wildlife. HPA: hydraulic project approval. COE: (Army) Corps of Engineers. CWA: Clean
Water Act. ECY: WA State Dept. of Ecology. FEMA: Federal Emergency Management Agency. ESA: Endangered Species Act.
2021 Surface Water Design Manual
1
Last revised 7/23/2021
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date:
Describe:
Completion Date:Re: KCSWDM Adjustment No.
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan :________________________________
Special District Overlays:_________________________
Drainage Basin:__________________________________
Stormwater Requirements: _______________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
□ River/Stream □Steep Slope
□ Lake □Erosion Hazard
□ Wetlands □Landslide Hazard
□ Closed Depression □Coal Mine Hazard
□ Floodplain □Seismic Hazard
□ Other □Habitat Protection
□
Part 10 SOILS
Soil Type Slopes Erosion Potential
□ High Groundwater Table (within 5 feet) □ Sole Source Aquifer
□ Other ______________ _______________________ □ Seeps/Springs
□ Additional Sheets Attached
2021 Surface Water Design Manual
2
Last revised 7/23/2021
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION / SITE CONSTRAINT
□ Core 2 - Offsite Analysis____________________ _________________________________
□ Sensitive/Critical Areas _____________________ _________________________________
□ SEPA _____________________________________ _________________________________
□ LID Infeasibility____________________________ _________________________________
□ Other _____________________________________ _________________________________
□
□ Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:
Flow Control (include facility Level: 1 / 2 / 3 or Exemption Number ______________
summary sheet)Flow Control BMPs
Conveyance System Spill containment located at:
Erosion and Sediment Control /CSWPP/CESCL/ESC Site Supervisor:
Construction Stormwater
Pollution Prevention Contact Phone:
After Hours Phone:
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and
Liability
Provided: Yes / No
Water Quality (include facility Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
summary sheet)or Exemption No.
Landscape Management Plan: Yes / No
For Entire Project:Total Replaced Impervious surfaces on the site
% of Target Impervious that had a
feasible FCBMP
Total New Pervious Surfaces on the site
Repl. Imp. on site mitigated w/flow control facility
implemented Repl. Imp. on site mitigated w/water quality facility
Repl. Imp. on site mitigated with FCBMP
2021 Surface Water Design Manual
3
Last revised 7/23/2021
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet per Threshold Discharge Area)
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: CDA / SDO / MDP / BP / LMP / Shared Fac. / None
Name:
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-use Site: Yes / No
Treatment BMP:
Maintenance Agreement: Yes / No
with whom?
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
^ Clearing Limits
^ Cover Measures
^ Perimeter Protection
^ Traffic Area Stabilization
^ Sediment Retention
^ Surface Water Collection
^ Dewatering Control
^ Dust Control
^ Flow Control
^ Protection of Flow Control BMP Facilities
(existing and proposed)
^ Maintain BMPs / Manage Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
^ Stabilize exposed surfaces
^ Remove and restore Temporary ESC Facilities
^ Clean and remove all silt and debris, ensure
operation of Permanent Facilities, restore
operation of Flow Control BMP Facilities as
necessary
^ Flag limits of SAO and open space preservation
areas
^ Other
2021 Surface Water Design Manual
4
Last revised 7/23/2021
Page 8
Vicinity Map
Scale: none.
PROJECT
SITE
Page 9
2.0 CONDITIONS AND REQUIREMENTS SUMMARY
Per KCSWDM Section 1.1, Figure 1.1.2.A: Flow Chart for Determining Type of Drainage Review
Required, this project is required to comply with Full Drainage Review per Section 1.1.2.4:
Therefore, this project must comply with all nine core requirements in Section 1.2 and all five
special requirements in Section 1.3.
Page 10
2.1 Analysis of the Nine (9) Core Requirements
2.1.1 Core Requirement #1: Discharge at the Natural Location
This project is a continuation of an expired permit, with a previously-designed stormwater
system onsite discharging from the site into the municipal storm system through the
existing manhole in Grant Ave. This project proposes discharge through this system.
Therefore, the existing drainage pattern is maintained under the developed condition. See
Section 3.4 of this report.
2.1.2 Core Requirement #2: Offsite Analysis
See Section 3.0: Offsite Analysis.
2.1.3 Core Requirement #3: Flow Control
Per King County iMap, Conservation Flow Control is required for this site. Therefore, per
Table 1.2.3.A, the historic site conditions Level 2 flow control standard shall apply. A
previously-installed vault, designed by others, shall be used to provide the required level
of flow control. See Section 4.1: Vault Analysis.
2.1.4 Core Requirement #4: Conveyance System
Conveyance shall be primarily through 12” CMP pipe; see Section 5.0: Conveyance
System Analysis and Design.
2.1.5 Core Requirement #5: Erosion and Sediment Control
A Temporary Erosion and Sediment Control (TESC) plan is included separately as a part
of this submittal.
2.1.6 Core Requirement #6: Maintenance and Operations
Maintenance and operations instructions from the KCSWDM are provided in Section 10.0
of this report.
2.1.7 Core Requirement #7: Financial Guarantees and Liability
Bond quantity analysis will be provided separately at final approval.
2.1.8 Core Requirement #8: Water Quality
Because this project proposes the development of a multifamily project, Enhanced Basic
Water Quality is required per CoRSWDM Section 1.2.8.1(A). Water quality will be provided
by a two-facility treatment train consisting of a combined detention/wet vault and a
ConTech Stormfilter with ZPG filters. See Section 4.2: Water Quality System.
2.1.9 Core Requirement #9: Flow Control BMPs
This project was evaluated per CoRSWDM Section 1.2.9.2.2: Large Lot BMP
Requirements:
1. Full dispersion: Dispersion is not feasible on this project due to insufficient
vegetated flowpath.
2. Full infiltration of roof runoff: Infiltration is not feasible on this project due to
unsuitable soils and high/perched groundwater.
3. Where (1) and (2) are infeasible, the following BMPs must be evaluated for
feasibility:
Page 11
a. Full infiltration: Infiltration is not feasible on this project due to unsuitable
soils and high/perched groundwater.
b. Limited infiltration: Infiltration is not feasible on this project due to
unsuitable soils and high/perched groundwater.
c. Bioretention: Bioretention is not feasible due to unsuitable soils and
high/perched groundwater.
d. Permeable Pavement: Permeable pavement is not feasible due to
unsuitable soils and high/perched groundwater and slopes greater than 5%.
4. All target surfaces not mitigated by Requirements (1), (2), and (3) above must
be mitigated to the maximum extent feasible using Basic Dispersion.
Dispersion is not feasible due to insufficient vegetated flow path.
5. For projects that will result in an impervious surface coverage on the buildable
portion of the site/lot of less than 45%, flow control BMPs must be applied to
50% of target impervious surfaces. There are no feasible flow control BMPs from
requirements (1), (2), (3), and (4) above. Native Growth Retention Credit shall be
applied to the proposed 2,595 square-foot native growth protection area (NGPA).
Page 12
2.2 Analysis of the Five Special Requirements
2.2.1 Special Requirement No. 1: Other Adopted Area-Specific Requirements.
Critical Drainage Areas (CDAs): There are no CDAs adopted in King County at this time.
Master Drainage Plans (MDPs): This project is not a part of an MDP.
Basin Plans (BPs): This project is subject to the City of Renton Shoreline Master Program.
Salmon Conservation Plans (SCPs): This project is subject to the requirements of the
WRIA 9 Salmon Habitat Plan.
Stormwater Compliance Plans (SWCPs): This project is subject to the provisions of the
2022 King County Stormwater Management Program Plan (SWMP).
Lake Management Plans (LMPs): No known LMPs apply to this project.
Hazard Mitigation Plan: This project is subject to the requirements of the King County
FHMP and the City of Renton’s Hazard Mitigation Plan.
Shared Facility Drainage Plans (SFDPs): This project is not subject to shared facility
drainage requirements.
2.2.2 Special Requirement No. 2: Flood Hazard Area Delineation.
There are no flood hazards on or adjacent to the site; see Section 3.2 of this report.
2.2.3 Special Requirement No. 3: Flood Protection Facilities.
N/A
2.2.4 Special Requirement No. 4: Source Control.
N/A
2.2.5 Special Requirement No. 5: Oil Control.
N/A
Page 13
2.3 Conditions of Approval
Reserved.
Page 14
3.0 OFFSITE ANALYSIS
A Level 1 Downstream Analysis was performed by Pacific Engineering Design, LLC, and
is attached to this report as Appendix A.
3.1 Task 1: Define and Map the Study Area.
See the Downstream Map at the end of this section.
3.2 Task 2: Review All Available Information on the Study Area
King County iMap was used to review the site and the area approximately ½ mile
downstream:
Category Project Site Within ¼ mi. downstream
Environmentally Sensitive Areas
Tributary basin (2005 CAO) Lower Lower
Potential landslide hazard areas No No
Potential landslide hazard areas 50-
foot buffer No No
Landslide hazards, incorporated KC No No
Potential steep slope hazard areas No No
Basin condition (2005 CAO) Low Low
Shoreline condition (2005 CAO) N/A N/A
Erosion hazard (1990 SAO) Yes No
Seismic hazard (1990 SAO) No No
Coal Mine hazard (1990 SAO) Yes Yes
Stream (1990 SAO) No Unclassified
Wetland (1990 SAO) No No
Sensitive area notice on title No No
Chinook distribution No No
Wildlife network No No
Channel migration hazard areas No No
Flooding info
River gages N/A N/A
Flood photos N/A N/A
River miles from flood patrol map
book N/A N/A
River facilities N/A N/A
Flood phases N/A N/A
Elevation certificates N/A N/A
Letter of Map Amendment and
Revisions N/A N/A
FEMA cross-sections N/A N/A
FEMA FIRM panels 53033C0979G 53033C0979G
FEMA floodway N/A N/A
FEMA 100-year floodplain N/A N/A
FEMA 500-year floodplain N/A N/A
FEMA area with reduced risk due to
levee No No
Regulatory floodplain No No
King County sea level rise risk area No No
Groundwater
Groundwater sources N/A N/A
Groundwater quality sampling sites No No
Groundwater management areas South King County South King County
Page 15
Category Project Site Within ¼ mi. downstream
Areas susceptible to groundwater
contamination Low Low
Critical aquifer recharge area No No
Sole source aquifer No No
Wellhead protection areas – one
year time of travel No No
Wellhead protection areas – five
years time of travel No No
Wellhead protection areas – ten
years time of travel Yes Yes
Water service area City of Renton City of Renton
Hydrography and Hydrology
Hydrogauges N/A N/A
Lake buoy N/A N/A
Lakes and large rivers N/A N/A
Streams N/A N/A
Drainage basin Black River Black River
Water resource inventory areas Duwamish-Green (09) Duwamish-Green (09)
River Corridor Mapping
Historical Landslides No No
Fans and debris flows No No
Rock fall No No
Deep-seated landslide No No
Shallow debris slides No No
Noxious weeds No No
Stormwater Services
Stormwater Facilities N/A N/A
Drainage studies N/A N/A
Neighborhood drainage projects N/A N/A
Surface water engineering projects N/A N/A
Drainage complaints N/A N/A
Surface Water Design Manual
Flow control N/A N/A
Water quality N/A N/A
The City of Renton’s GIS resources were also reviewed:
Category Project Site Within ¼ mi. downstream
Coalmines Severity: Moderate Severity: Moderate
Erosion Hazard Severity: High Severity: High
Flood N/A N/A
Landslide Hazard Severity: Moderate Severity: Moderate
Regulated Slopes >15%, ≤25% >15%, ≤25%
>25%, ≤40%
Seismic Hazard Areas No No
Seismic Faults Yes Yes
Regulated Shoreline N/A N/A
Wetlands N/A N/A
Wellhead Protection Area N/A N/A
Streams (classified) N/A Thunder Hills Creek
Classification Type: Np – Non-Fish
Water Feature Type: Stream
Page 16
3.3 Task 3: Field Inspect the Study Area
A site visit was performed by Dean A. Furr of Furr Engineering Services to confirm the findings of
the downstream analysis performed by Pacific Engineering. See Appendix A: Pacific Engineering
Downstream Analysis.
3.4 Task 4: Describe the Drainage System
Site drainage is collected into a vault, which discharges into the municipal storm system in Grant
Ave. Water is discharged through a 15-inch culvert across Grant Ave, then sheet-flows northwest
along a vegetated path. See the downstream map and table at the end of this section.
ABC
D
PROJECT
SITE
ph 206.890.8291
4715 142nd Pl. SW #B,
Edmonds, WA 98026
GRANT PLACE TOWNHOMESDOWNSTREAM MAPRCE
4/3/2023
20069
DOWNSTREAM FLOWPATH
N
STORM STRUCTURE
Downstream Table
Symbol Drainage Component Type, Name, and Size Drainage Component Description Slope Distance from
site discharge
Existing
Problems Potential Problems Observations of Field Inspector, Resource Reviewer, or
Resident
See map Type: sheet flow, swale, stream, channel, pipe, pond
Size: diameter, surface area
Drainage basin, vegetation, cover, depth, type of
sensitive area, volume % ¼ mi = 1,320 ft Constrictions, under capacity, ponding, overtopping, flooding, habitat or organism
destruction, scouring, bank sloughing, sedimentation, incision, other erosion
Tributary area, likelihood of problem, overflow pathways, potential
impacts.
A Site discharge — — N/A — Onsite SWPPP measures in place during construction.
A→B 12” CMP conveyance 28 N/A N/A
B Type 2 storm drain manhole 28 N/A N/A
B→C 15” CMP culvert 96 N/A N/A
C Culvert outlet 96 N/A Damage from wildlife, overgrowth by vegetation
C→D Sheet flow 1,320 N/A N/A
D Terminus of downstream analysis 1,320 N/A —
Page 19
4.0 FLOW CONTROL, LOW IMPACT DEVELOPMENT (LID) AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
This project is a continuation of an expired plat and is currently partially-constructed. Refer to civil
permit no. U16004475 for previous site conditions.
Table 1, below, shows a breakdown of proposed project areas:
PROP. ON-SITE DEVELOPMENT sf ac
DISTURBED AREA 92,828 2.131
IMPERVIOUS 65,000 1.492
TOWNHOUSE ROOFS 28,161 0.646
ALLEY/DRIVEWAYS 24,620 0.565
CONCRETE WALKWAYS/CURB+GUTTER 8,857 0.203
RETAINING WALLS 736 0.017
ASPHALT VAULT ACCESS 653 0.015
GRASSCRETE VAULT ACCESS 1,973 0.045
PERVIOUS (NGPA) 2,595 0.060
PERVIOUS (LS) 25,233 0.579
PROP. FRONTAGE DEVELOPMENT sf ac
DISTURBED AREA 2,636 0.061
IMPERVIOUS 1,548 0.036
SIDEWALK/CURB+GUTTER 1,131 0.026
DRIVEWAYS 417 0.010
PERVIOUS (LS) 1,088 0.025
Table 1: Proposed project area breakdown.
See the Developed Conditions Exhibit at the end of this section.
An onsite storm system, designed by others, has been installed. In order to ensure that the
existing system will be sufficient to provide the required level of flow control and water quality,
analysis was performed according to the 2022 CoRSWDM using WWHM 2012 modelling
software.
4.1 VAULT ANALYSIS
The combined detention/wetvault will be used to meet both flow control and water quality
requirements; see Section 4.3: Water Quality System. WWHM 2012 was used to model the site
using the inputs in Table 3, below:
Page 20
WWHM INPUTS AC
PREDEVELOPED - SITE 2.110
C, FOREST, MOD 2.110
PREDEVELOPED – GRANT AVE FRONTAGE 0.082
C, FOREST, MOD 0.082
PREDEVELOPED - OFFSITE UPSTREAM 0.220
C, FOREST, MOD 0.220
DEVELOPED - ONSITE 2.110
C, FOREST, MOD 0.060
C, PASTURE, MOD 0.563
C, LAWN, MOD 0.045
ROADS/FLAT 0.554
ROOF TOPS/FLAT 0.658
DRIVEWAYS/MOD 0.012
SIDEWALKS/FLAT 0.217
DEVELOPED - GRANT AVE (BYPASS) 0.082
C, PASTURE, MOD 0.037
DRIVEWAYS/MOD 0.018
SIDEWALKS/FLAT 0.027
DEVELOPED - OFFSITE UPSTREAM (BYPASS) 0.220
C, FOREST, MOD 0.220
DEVELOPED - TOTAL 2.192
Table 3: WWHM inputs.
The existing (historic) condition is modelled as forest, using hydrologic soil group C. Run-on from
the upstream area and from the frontage improvements to Grant Ave. are considered bypass.
The existing 90.06-foot long, 40.08-foot wide vault was modelled with a live storage depth of 8
feet, using a rectangular-notched, single-orifice control structure with the following parameters:
RISER HEIGHT (FT) 8
RISER DIAMETER (IN) 18
RISER TYPE NOTCHED
NOTCH TYPE RECTANGULAR
NOTCH HEIGHT (FT) 2.0
NOTCH WIDTH (FT) 0.01
ORIFICE
NUMBER
DIAMETER
(IN) HEIGHT (FT)
1 0.78 0
Table 4: Control structure data.
The existing vault and the proposed control structure passed; therefore, the existing vault and the
proposed control structure will be sufficient to provide the required level of flow control for this
project. The following flow rates were calculated:
Page 21
FLOW
FREQUENCY
FLOW (CFS)
501
PREDEVELOPED
701 DEVELOPED,
UNMITIGATED
801 DEVELOPED,
MITIGATED
2 Year 0.0718 0.5886 0.0386
5 Year 0.1177 0.7480 0.0612
10 Year 0.1472 0.8568 0.0811
25 Year 0.1822 0.9985 0.1130
50 Year 0.2065 1.1073 0.1426
100 Year 0.2292 1.2190 0.1780
Increase in 100-year return period flow rate: 0.9898
Table 5: Calculated flow rates.
See the WWHM printout at the end of this section.
This vault is designed to discharge flows up to the water quality rate of 0.2384 cfs, with a 12”
storm pipe discharging into a ConTech StormFilter manhole at an invert elevation (IE) of 290.87;
see Section 4.2: Water Quality System. A second outlet discharges into a manhole downstream
of the StormFilter, with an IE of 295.57. Flows then enter into the municipal storm system within
Grant Ave.
The available live storage and dead storage volumes were calculated based upon as-built
drawings produced by Tyee Surveyors; see Appendix C: As-Built Drawings. Table 2, below,
summarizes the as-built floor and inside roof elevations.
Vault
access no.
Inside roof
elevation (ft)
Floor
elevation
(ft)
1 299.71 286.55
2 299.52 286.44
3 299.73 286.21
4 299.71 285.28
5 299.72 285.58
6 299.73 284.92
7 299.71 284.91
8 299.67 284.89
average 299.69 285.60
Table 2: As-built vault elevations.
Using the average inside roof elevation and the average floor elevation calculated above, an
effective high water surface (HWS) elevation may be determined, given 0.5 ft freeboard:
𝐻𝑊𝑆= 299.69 − 0.5 = 299.19
Similarly, a bottom water quality surface (BWQS) may be determined, given 0.5 of sediment
storage:
𝐵𝑊𝑄𝑆= 285.60 + 0.5 = 286.10
Given a surveyed water quality invert elevation of 290.87, the total effective live and dead storage
may be calculated:
299.19 − 290.87 = 8.32 𝑓𝑡 𝑙𝑖𝑣𝑒 𝑠𝑡𝑜𝑟𝑎𝑔𝑒
290.87 − 286.10 = 4.77 𝑓𝑡 𝑑𝑒𝑎𝑑 𝑠𝑡𝑜𝑟𝑎𝑔𝑒
Page 22
Therefore, the as-built vault provides additional storage over the modelled live storage depth of
8.0 feet and dead storage depth of 4.0 feet, which were sufficient to meet flow control and water
quality requirements.
4.2 WATER QUALITY SYSTEM
Enhanced Basic Level Water Quality will be provided by a treatment train of a combined
wet/detention vault and a Stormfilter unit.
WWHM was used to calculate the required water quality volume of 0.2033 ac•ft (8,856 cf); see
the WWHM printout at the end of this section. Given the effective dead storage depth, calculated
in Section 4.1, above, of 4.77 feet, the vault provides a total volume of 17,218 cf of dead storage,
and is therefore sufficient to meet the required water quality volume for the first stage of the
treatment train.
The second stage of the treatment train shall consist of a ConTech StormFilter manhole. This
product is approved for General Use Level for Basic Treatment by the Washington State
Department of Ecology, using either PhosphoSorb or ZPG media. See the StormFilter detail at
the end of this section.
Each cartridge has a through-flow rate of 7.5 gpm (0.0165 cfs). Per WWHM, the mitigated flow
rate (i.e., the discharge flow rate from the vault into the StormFilter) is equal to 0.0315 cfs.
Therefore, two cartridges will provide a flow rate of 0.0330 cfs and will be sufficient to treat the
required water quality flow rate from the vault of 0.0207 cfs.
PARCEL AREA
92,828 SF
ON-SITE DISTURBED AREA
92,828 SF
OFF-SITE
DISTURBED AREA
2,636 SF
ph 206.890.8291
4715 142nd Pl. SW #B,
Edmonds, WA 98026
RCE
4/3/2023
20069 GRANT PLACE TOWNHOMESDEVELOPED CONDITIONS EXHIBITROOF
ASPHALT (ONSITE)
CONCRETE (ONSITE)
GRASSCRETE
ASPHALT (OFFSITE)
CONCRETE (OFFSITE)
LEGEND
N
INSIDE HEIGHT6' [1829 mm] TYPICALHYDRAULIC DROP(H) INLET INV.TO OUTLET INV.OUTLET
FLOATABLES
BAFFLE
INLET PIPE
INLET
CONTRACTOR TO GROUT TO
FINISHED GRADE
GRADE
RING/RISERS
SECTION A-A
PLAN VIEW
STANDARD OUTLET RISER
FLOWKIT: 41A
FLOW KIT
OUTLET SUMP
HDPE OUTLET RISER
TOP SLAB ACCESS
SEE FRAME AND COVER
DETAIL
STORMFILTER
CARTRIDGE
OUTLET
SUMP
FLO
W
Ø5'-0" [Ø1524 mm] I.D.
MANHOLE STRUCTURE
(Ø6'-0" [Ø1829 mm]) O.D.
A
A
FOR
M
AINTENANCE C A L L 1 .8 0 0 .3 3 8.1122 www.contechES.com
T
MClean w a t e r s t a r t s her
e
FRAME AND COVER
(DIAMETER VARIES)
N.T.S.
FOR
M
AINTENANCE C A L L 1 .8 0 0 .3 3 8.1122 www.contechES.com
T
MClean w a t e r s t a r t s her
e
FRAME AND COVER
(DIAMETER VARIES)
N.T.S.
SFMH60
STORMFILTER
STANDARD DETAILwww.contechES.com
GENERAL NOTES
1.CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.
2.DIMENSIONS MARKED WITH ( ) ARE REFERENCE DIMENSIONS. ACTUAL DIMENSIONS MAY VARY.
3.FOR SITE SPECIFIC DRAWINGS WITH DETAILED VAULT DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR CONTECH ENGINEERED SOLUTIONS
LLC REPRESENTATIVE. www.ContechES.com
4.STORMFILTER WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS
DRAWING.
5.STRUCTURE SHALL MEET AASHTO HS-20 LOAD RATING, ASSUMING EARTH COVER OF 0' - 5' [1524 mm] AND GROUNDWATER ELEVATION AT, OR
BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL
MEET AASHTO M306 AND BE CAST WITH THE CONTECH LOGO.
6.FILTER CARTRIDGES SHALL BE MEDIA-FILLED, PASSIVE, SIPHON ACTUATED, RADIAL FLOW, AND SELF CLEANING. RADIAL MEDIA DEPTH SHALL
BE 7-INCHES [178 mm]. FILTER MEDIA CONTACT TIME SHALL BE AT LEAST 38 SECONDS.
7.SPECIFIC FLOW RATE IS EQUAL TO THE FILTER TREATMENT CAPACITY (gpm) [L/s] DIVIDED BY THE FILTER CONTACT SURFACE AREA (sq ft)[m2].
8.STORMFILTER STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 AND AASHTO LOAD FACTOR DESIGN METHOD.
INSTALLATION NOTES
A.ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE
SPECIFIED BY ENGINEER OF RECORD.
B.CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE STORMFILTER STRUCTURE.
C.CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS AND ASSEMBLE STRUCTURE.
D.CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET PIPE(S).
E.CONTRACTOR TO PROVIDE AND INSTALL CONNECTOR TO THE OUTLET RISER STUB. STORMFILTER EQUIPPED WITH A DUAL DIAMETER HDPE
OUTLET STUB AND SAND COLLAR. IF OUTLET PIPE IS LARGER THAN 8 INCHES [200 mm], CONTRACTOR TO REMOVE THE 8 INCH [200 mm] OUTLET
STUB AT MOLDED-IN CUT LINE. COUPLING BY FERNCO OR EQUAL AND PROVIDED BY CONTRACTOR.
F.CONTRACTOR TO TAKE APPROPRIATE MEASURES TO PROTECT CARTRIDGES FROM CONSTRUCTION-RELATED EROSION RUNOFF.
STORMFILTER DESIGN NOTES
CARTRIDGE HEIGHT
SPECIFIC FLOW RATE (gpm/sf) [L/s/m2]
CARTRIDGE FLOW RATE (gpm) [L/s]
RECOMMENDED HYDRAULIC DROP (H)
27" [686 mm]18" [458 mm]LOW DROP
3.05' [930 mm]2.3' [700 mm]1.8' [550 mm]
STORMFILTER TREATMENT CAPACITY IS A FUNCTION OF THE CARTRIDGE SELECTION AND THE NUMBER OF CARTRIDGES. THE STANDARD MANHOLE
STYLE IS SHOWN WITH THE MAXIMUM NUMBER OF CARTRIDGES (4). VOLUME SYSTEM IS ALSO AVAILABLE WITH MAXIMUM 4 CARTRIDGES.
Ø5'-0" [1524 mm] MANHOLE STORMFILTER PEAK HYDRAULIC CAPACITY IS 1.0 CFS [28.3 L/s] . IF THE SITE CONDITIONS EXCEED 1.0 CFS [28.3 L/s] AN
UPSTREAM BYPASS STRUCTURE IS REQUIRED.
CARTRIDGE SELECTION
18.79 [1.19]12.53 [0.79]8.35 [0.54]
2 [1.30]
22.5 [1.42]11.25 [0.71]15 [0.95]10 [0.63]5 [0.32]7.5 [0.44]
1.67* [1.08]1 [0.65]
* 1.67 gpm/sf [1.08 L/s/m2] SPECIFIC FLOW RATE IS APPROVED WITH PHOSPHOSORB® (PSORB) MEDIA ONLY
2 [1.30]1.67* [1.08]1 [0.65]2 [1.30]1.67* [1.08]1 [0.65]
STRUCTURE ID
WATER QUALITY FLOW RATE (cfs) [L/s]
PEAK FLOW RATE (cfs) [L/s]
RETURN PERIOD OF PEAK FLOW (yrs)
NUMBER OF CARTRIDGES REQUIRED
MEDIA TYPE (PERLITE, ZPG, PSORB)
PIPE DATA:I.E.MATERIAL DIAMETER
INLET PIPE #1
INLET PIPE #2
OUTLET PIPE
SITE SPECIFIC
DATA REQUIREMENTS
WIDTH HEIGHTANTI-FLOTATION BALLAST
NOTES/SPECIAL REQUIREMENTS:
RIM ELEVATION
CARTRIDGE FLOW RATE
* PER ENGINEER OF RECORD
CARTRIDGE HEIGHT (SEE TABLE ABOVE)
**
*
***
***
***
*
*
*
*
*
*
*
*
800-338-1122 513-645-7000 513-645-7993 FAX
9025 Centre Pointe Dr., Suite 400, West Chester, OH 45069THIS PRODUCT MAY BE PROTECTED BY ONE OR MORE OF THE FOLLOWING
U.S. PATENTS: 5,322,629; 5,524,576; 5,707,527; 5,985,157; 6,027,639; 6,649,048;
RELATED FOREIGN PATENTS, OR OTHER PATENTS PENDING.
Page 25
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: 20069 - vault design
Site Name: Grant Avenue Townhomes
Site Address: 1600 Grant Ave S
City : Renton, WA
Report Date: 3/17/2023
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2021/08/18
Version : 4.2.18
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : SITE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Mod 2.131
Pervious Total 2.131
Impervious Land Use acre
Impervious Total 0
Basin Total 2.131
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
Name : UPSTREAM
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Mod .22
Page 26
Pervious Total 0.22
Impervious Land Use acre
Impervious Total 0
Basin Total 0.22
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
Name : FRONTAGE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Mod .061
Pervious Total 0.061
Impervious Land Use acre
Impervious Total 0
Basin Total 0.061
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : SITE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Mod .06
C, Lawn, Mod .045
C, Pasture, Mod .579
Pervious Total 0.684
Page 27
Impervious Land Use acre
ROADS FLAT 0.565
ROOF TOPS FLAT 0.646
DRIVEWAYS MOD 0.015
SIDEWALKS FLAT 0.22
Impervious Total 1.446
Basin Total 2.13
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Vault 1 Vault 1
___________________________________________________________________
Name : FRONTAGE
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Pasture, Mod .037
Pervious Total 0.037
Impervious Land Use acre
DRIVEWAYS MOD 0.018
SIDEWALKS FLAT 0.027
Impervious Total 0.045
Basin Total 0.082
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Vault 1 Vault 1
___________________________________________________________________
Name : UPSTREAM
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Mod .22
Pervious Total 0.22
Impervious Land Use acre
Page 28
Impervious Total 0
Basin Total 0.22
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Vault 1 Vault 1
___________________________________________________________________
Name : Vault 1
Width : 40.8 ft.
Length : 90.06 ft.
Depth: 9 ft.
Discharge Structure
Riser Height: 8 ft.
Riser Diameter: 18 in.
Notch Type: Rectangular
Notch Width: 0.010 ft.
Notch Height: 2.250 ft.
Orifice 1 Diameter: 0.78 in. Elevation: 0 ft.
Element Flows To:
Outlet 1 Outlet 2
___________________________________________________________________
Vault Hydraulic Table
Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
0.0000 0.084 0.000 0.000 0.000
0.1000 0.084 0.008 0.005 0.000
0.2000 0.084 0.016 0.007 0.000
0.3000 0.084 0.025 0.009 0.000
0.4000 0.084 0.033 0.010 0.000
0.5000 0.084 0.042 0.011 0.000
0.6000 0.084 0.050 0.012 0.000
0.7000 0.084 0.059 0.013 0.000
0.8000 0.084 0.067 0.014 0.000
0.9000 0.084 0.075 0.015 0.000
1.0000 0.084 0.084 0.016 0.000
1.1000 0.084 0.092 0.017 0.000
1.2000 0.084 0.101 0.018 0.000
1.3000 0.084 0.109 0.018 0.000
1.4000 0.084 0.118 0.019 0.000
1.5000 0.084 0.126 0.020 0.000
1.6000 0.084 0.135 0.020 0.000
1.7000 0.084 0.143 0.021 0.000
1.8000 0.084 0.151 0.022 0.000
1.9000 0.084 0.160 0.022 0.000
2.0000 0.084 0.168 0.023 0.000
2.1000 0.084 0.177 0.023 0.000
Page 29
2.2000 0.084 0.185 0.024 0.000
2.3000 0.084 0.194 0.025 0.000
2.4000 0.084 0.202 0.025 0.000
2.5000 0.084 0.210 0.026 0.000
2.6000 0.084 0.219 0.026 0.000
2.7000 0.084 0.227 0.027 0.000
2.8000 0.084 0.236 0.027 0.000
2.9000 0.084 0.244 0.028 0.000
3.0000 0.084 0.253 0.028 0.000
3.1000 0.084 0.261 0.029 0.000
3.2000 0.084 0.269 0.029 0.000
3.3000 0.084 0.278 0.030 0.000
3.4000 0.084 0.286 0.030 0.000
3.5000 0.084 0.295 0.030 0.000
3.6000 0.084 0.303 0.031 0.000
3.7000 0.084 0.312 0.031 0.000
3.8000 0.084 0.320 0.032 0.000
3.9000 0.084 0.329 0.032 0.000
4.0000 0.084 0.337 0.033 0.000
4.1000 0.084 0.345 0.033 0.000
4.2000 0.084 0.354 0.033 0.000
4.3000 0.084 0.362 0.034 0.000
4.4000 0.084 0.371 0.034 0.000
4.5000 0.084 0.379 0.035 0.000
4.6000 0.084 0.388 0.035 0.000
4.7000 0.084 0.396 0.035 0.000
4.8000 0.084 0.404 0.036 0.000
4.9000 0.084 0.413 0.036 0.000
5.0000 0.084 0.421 0.036 0.000
5.1000 0.084 0.430 0.037 0.000
5.2000 0.084 0.438 0.037 0.000
5.3000 0.084 0.447 0.038 0.000
5.4000 0.084 0.455 0.038 0.000
5.5000 0.084 0.463 0.038 0.000
5.6000 0.084 0.472 0.039 0.000
5.7000 0.084 0.480 0.039 0.000
5.8000 0.084 0.489 0.040 0.000
5.9000 0.084 0.497 0.042 0.000
6.0000 0.084 0.506 0.044 0.000
6.1000 0.084 0.514 0.047 0.000
6.2000 0.084 0.523 0.050 0.000
6.3000 0.084 0.531 0.053 0.000
6.4000 0.084 0.539 0.056 0.000
6.5000 0.084 0.548 0.060 0.000
6.6000 0.084 0.556 0.064 0.000
6.7000 0.084 0.565 0.067 0.000
6.8000 0.084 0.573 0.071 0.000
6.9000 0.084 0.582 0.076 0.000
7.0000 0.084 0.590 0.080 0.000
7.1000 0.084 0.598 0.085 0.000
7.2000 0.084 0.607 0.105 0.000
7.3000 0.084 0.615 0.112 0.000
7.4000 0.084 0.624 0.119 0.000
7.5000 0.084 0.632 0.126 0.000
7.6000 0.084 0.641 0.134 0.000
7.7000 0.084 0.649 0.141 0.000
2-year flow rate: 0.0386
cfs
Page 30
7.8000 0.084 0.658 0.149 0.000
7.9000 0.084 0.666 0.157 0.000
8.0000 0.084 0.674 0.165 0.000
8.1000 0.084 0.683 0.667 0.000
8.2000 0.084 0.691 1.570 0.000
8.3000 0.084 0.700 2.667 0.000
8.4000 0.084 0.708 3.798 0.000
8.5000 0.084 0.717 4.805 0.000
8.6000 0.084 0.725 5.568 0.000
8.7000 0.084 0.733 6.059 0.000
8.8000 0.084 0.742 6.506 0.000
8.9000 0.084 0.750 6.891 0.000
9.0000 0.084 0.759 7.254 0.000
9.1000 0.084 0.767 7.601 0.000
9.2000 0.000 0.000 7.931 0.000
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:2.412
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.941
Total Impervious Area:1.491
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.071818
5 year 0.11768
10 year 0.147168
25 year 0.182246
50 year 0.206543
100 year 0.229238
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.039775
5 year 0.063964
10 year 0.085035
25 year 0.118559
50 year 0.149341
100 year 0.185839
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
Page 31
1949 0.083 0.030
1950 0.098 0.037
1951 0.157 0.145
1952 0.049 0.027
1953 0.040 0.033
1954 0.061 0.034
1955 0.098 0.033
1956 0.079 0.045
1957 0.063 0.033
1958 0.070 0.036
1959 0.060 0.030
1960 0.108 0.080
1961 0.060 0.037
1962 0.037 0.026
1963 0.051 0.034
1964 0.072 0.035
1965 0.048 0.039
1966 0.046 0.032
1967 0.110 0.036
1968 0.062 0.033
1969 0.060 0.032
1970 0.048 0.034
1971 0.055 0.035
1972 0.119 0.107
1973 0.053 0.039
1974 0.059 0.035
1975 0.081 0.032
1976 0.058 0.034
1977 0.009 0.028
1978 0.049 0.036
1979 0.030 0.025
1980 0.140 0.119
1981 0.044 0.033
1982 0.091 0.041
1983 0.078 0.035
1984 0.047 0.028
1985 0.028 0.028
1986 0.123 0.038
1987 0.109 0.060
1988 0.043 0.028
1989 0.028 0.028
1990 0.260 0.082
1991 0.138 0.072
1992 0.056 0.037
1993 0.055 0.028
1994 0.018 0.024
1995 0.079 0.037
1996 0.182 0.141
1997 0.141 0.149
1998 0.034 0.028
1999 0.154 0.075
2000 0.055 0.035
2001 0.010 0.024
2002 0.063 0.038
2003 0.095 0.030
2004 0.101 0.112
2005 0.075 0.034
Page 32
2006 0.085 0.042
2007 0.197 0.207
2008 0.240 0.114
2009 0.112 0.039
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.2601 0.2070
2 0.2396 0.1486
3 0.1966 0.1446
4 0.1821 0.1410
5 0.1569 0.1188
6 0.1541 0.1140
7 0.1405 0.1117
8 0.1402 0.1071
9 0.1379 0.0818
10 0.1231 0.0796
11 0.1191 0.0751
12 0.1117 0.0722
13 0.1103 0.0601
14 0.1086 0.0447
15 0.1083 0.0419
16 0.1013 0.0415
17 0.0981 0.0395
18 0.0976 0.0393
19 0.0948 0.0388
20 0.0909 0.0384
21 0.0845 0.0384
22 0.0827 0.0374
23 0.0815 0.0374
24 0.0788 0.0368
25 0.0786 0.0366
26 0.0778 0.0364
27 0.0751 0.0356
28 0.0722 0.0356
29 0.0705 0.0353
30 0.0635 0.0349
31 0.0635 0.0348
32 0.0621 0.0347
33 0.0611 0.0346
34 0.0604 0.0341
35 0.0604 0.0340
36 0.0595 0.0340
37 0.0585 0.0339
38 0.0582 0.0337
39 0.0563 0.0335
40 0.0550 0.0334
41 0.0547 0.0332
42 0.0547 0.0329
43 0.0528 0.0329
44 0.0509 0.0320
45 0.0492 0.0319
46 0.0492 0.0317
47 0.0485 0.0304
48 0.0479 0.0304
Page 33
49 0.0469 0.0302
50 0.0461 0.0283
51 0.0440 0.0283
52 0.0429 0.0282
53 0.0398 0.0281
54 0.0371 0.0279
55 0.0344 0.0279
56 0.0298 0.0276
57 0.0284 0.0272
58 0.0278 0.0258
59 0.0185 0.0254
60 0.0098 0.0243
61 0.0085 0.0238
___________________________________________________________________
Stream Protection Duration
POC #1
The Facility PASSED
The Facility PASSED.
Flow(cfs) Predev Mit Percentage Pass/Fail
0.0359 17085 13109 76 Pass
0.0376 15481 9146 59 Pass
0.0394 14070 5375 38 Pass
0.0411 12801 4254 33 Pass
0.0428 11567 3799 32 Pass
0.0445 10517 3501 33 Pass
0.0463 9561 3251 34 Pass
0.0480 8750 3024 34 Pass
0.0497 8034 2860 35 Pass
0.0514 7345 2704 36 Pass
0.0531 6733 2560 38 Pass
0.0549 6192 2423 39 Pass
0.0566 5726 2246 39 Pass
0.0583 5309 2089 39 Pass
0.0600 4924 1960 39 Pass
0.0618 4569 1827 39 Pass
0.0635 4235 1691 39 Pass
0.0652 3951 1561 39 Pass
0.0669 3643 1436 39 Pass
0.0687 3388 1295 38 Pass
0.0704 3133 1205 38 Pass
0.0721 2915 1102 37 Pass
0.0738 2706 1028 37 Pass
0.0756 2488 961 38 Pass
0.0773 2314 901 38 Pass
0.0790 2136 829 38 Pass
0.0807 1972 767 38 Pass
0.0824 1824 703 38 Pass
0.0842 1702 652 38 Pass
0.0859 1577 602 38 Pass
0.0876 1442 583 40 Pass
0.0893 1325 568 42 Pass
0.0911 1232 553 44 Pass
0.0928 1147 538 46 Pass
0.0945 1083 519 47 Pass
Page 34
0.0962 1020 506 49 Pass
0.0980 947 495 52 Pass
0.0997 885 475 53 Pass
0.1014 824 455 55 Pass
0.1031 761 436 57 Pass
0.1049 725 425 58 Pass
0.1066 676 399 59 Pass
0.1083 627 356 56 Pass
0.1100 589 320 54 Pass
0.1117 552 287 51 Pass
0.1135 506 253 50 Pass
0.1152 471 228 48 Pass
0.1169 427 209 48 Pass
0.1186 388 194 50 Pass
0.1204 356 181 50 Pass
0.1221 329 172 52 Pass
0.1238 297 159 53 Pass
0.1255 270 149 55 Pass
0.1273 242 139 57 Pass
0.1290 219 130 59 Pass
0.1307 197 121 61 Pass
0.1324 174 109 62 Pass
0.1342 152 100 65 Pass
0.1359 130 91 70 Pass
0.1376 119 85 71 Pass
0.1393 104 77 74 Pass
0.1410 95 64 67 Pass
0.1428 84 57 67 Pass
0.1445 75 49 65 Pass
0.1462 69 42 60 Pass
0.1479 61 37 60 Pass
0.1497 54 32 59 Pass
0.1514 46 28 60 Pass
0.1531 39 23 58 Pass
0.1548 29 22 75 Pass
0.1566 25 20 80 Pass
0.1583 22 19 86 Pass
0.1600 20 16 80 Pass
0.1617 17 15 88 Pass
0.1635 14 12 85 Pass
0.1652 12 8 66 Pass
0.1669 8 6 75 Pass
0.1686 7 4 57 Pass
0.1703 7 4 57 Pass
0.1721 7 4 57 Pass
0.1738 6 4 66 Pass
0.1755 6 4 66 Pass
0.1772 6 4 66 Pass
0.1790 6 4 66 Pass
0.1807 6 4 66 Pass
0.1824 5 2 40 Pass
0.1841 5 2 40 Pass
0.1859 5 2 40 Pass
0.1876 5 2 40 Pass
0.1893 5 2 40 Pass
0.1910 5 2 40 Pass
0.1928 5 2 40 Pass
Page 35
0.1945 4 2 50 Pass
0.1962 4 2 50 Pass
0.1979 3 2 66 Pass
0.1996 3 2 66 Pass
0.2014 3 2 66 Pass
0.2031 3 2 66 Pass
0.2048 3 2 66 Pass
0.2065 3 2 66 Pass
_____________________________________________________
___________________________________________________________________
0701
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.2033 acre-feet
On-line facility target flow: 0.2384 cfs.
Adjusted for 15 min: 0.2384 cfs.
Off-line facility target flow: 0.1338 cfs.
Adjusted for 15 min: 0.1338 cfs.
0801
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.0625 acre-feet
On-line facility target flow: 0.0317 cfs.
Adjusted for 15 min: 0.0317 cfs.
Off-line facility target flow: 0.0207 cfs.
Adjusted for 15 min: 0.0207 cfs.
___________________________________________________________________
LID Report
LID Technique Used for Total Volume Volume Infiltration Cumulative Percent
Water Quality Percent Comment
Treatment? Needs Through Volume Volume Volume
Water Quality
Treatment Facility (ac-ft.) Infiltration
Infiltrated Treated
(ac-ft) (ac-ft) Credit
Vault 1 POC N 256.14 N 0.00
Total Volume Infiltrated 256.14 0.00 0.00 0.00
0.00 0% No Treat. Credit
Compliance with LID Standard 8
Duration Analysis Result = Passed
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program
even if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2023; All
Rights Reserved.
Page 36
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
The constructed stormwater conveyance system onsite consists typically of 12” corrugated storm
pipe and was analyzed using Manning’s equation in order to ensure sufficient capacity.
𝑄=1.49
𝑛∗𝐴∗𝑅
ଶ
ଷ ∗𝑆
ଵ
ଶ
where
𝑛= Manning’s coefficient = 0.012
𝑄= cross-sectional average velocity
𝐴= area
𝑅 = hydraulic radius
𝑆= pipe slope
The most constrained pipe in the system shall be considered; see Appendix C: As-Built Survey
drawings. Given:
𝐴= 0.785 sf
𝑅 = 4”
𝑆= 0.041
𝑄=1.49
0.012 ∗ 0.785 ∗(4)
ଶ
ଷ ∗(0.041)
ଵ
ଶ = 7.842 𝑐𝑓𝑠
at 100% pipe capacity, and 4.705 cfs at 60% capacity. Given 100-year peak flows of 1.219 cfs,
each component of the conveyance system is sufficient to convey peak flows at 60% capacity.
Additionally, discharge from the vault must be considered, based upon the most constrained pipe:
𝑄=1.49
0.012 ∗ 0.785 ∗
(4)
ଶ
ଷ ∗(0.002)
ଵ
ଶ = 1.669 𝑐𝑓𝑠
at 100% pipe capacity, and 1.002 cfs at 60% capacity. Therefore, all pipes downstream of the
vault shall have sufficient capacity to convey the peak flows of 0.1780 cfs.
Page 37
6.0 SPECIAL REPORTS AND STUDIES
Geotechnical Engineering Evaluation prepared by Nelson Geotechnical Associates,
dated June 10, 2005. Attached to this report as Appendix B.
Page 38
7.0 OTHER PERMITS
Land Use
Building (Multi-family)
Clearing and Grading
Right-of-Way Use
Page 39
8.0 CSWPP ANALYSIS AND DESIGN
A Stormwater Pollution and Prevention Plan (SWPPP) is submitted separately per the Department
of Ecology. The requirements of the KCSWDM are satisfied as follows:
1. Clearing limits. Clearing limits are delineated on the Temporary Erosion and Sediment Control Plan
and shall be marked onsite with high-visibility fencing.
2. Cover measures. Temporary and permanent cover measures shall be provided to protect disturbed
areas, e.g., plastic covering, hydroseeding, etc.
3. Perimeter protection. Silt fencing shall be used to filter sediment downstream of disturbed areas.
4. Traffic area stabilization. A stabilized construction entrance has been constructed.
5. Sediment retention: The proposed vault is being used to collect sediment during construction. Silt
fencing shall provide sediment retention at the perimeter of the site.
6. Surface water collection. The proposed vault shall be used to collect surface water.
7. Dewatering control. Dewatering is not anticipated as a part of this project.
8. Dust control. Dust control shall be provided by sprinkling, if required.
9. Flow control. Flow control shall be provided by the proposed vault.
10. Control pollutants: The following BMPs shall be employed to control pollutants, per KCSWDM D.2.2:
Concrete handling
Concrete washout area
Sawcutting and surfacing pollution prevention
Material delivery, storage, and containment
pH control for high pH water
Maintain protective BMPs
Manage the project
11. Protect existing and proposed flow control BMPs. This project does not include existing or proposed
flow control BMPs requiring protection.
12. Maintain BMPs. Maintenance of BMPs shall be the responsibility of the Certified Erosion and
Sediment Control Lead (CESCL), to be appointed by the contractor.
13. Manage the project. Coordination and timing of site development activities relative to ESC concerns
shall be the responsibility of the CESCL.
During the wet season (October 1 to April 30) any site with exposed soils shall be subject to the "Wet
Season Requirements" contained in the ESC Standards. In addition to the ESC cover measures, these
provisions include covering any newly-seeded areas with mulch and seeding as much disturbed area as
possible during the first week of October to provide grass cover for the wet season.
Prior to obtaining final construction approval, the site shall be stabilized, structural ESC measures (such
as silt fences and sediment traps) shall be removed, and drainage facilities shall be cleaned as specified in
the ESC Standards.
Page 40
9.0 BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT
Submitted separately.
Page 41
10.0 OPERATIONS AND MAINTENANCE MANUAL
Page 42
Page 43
Page 44
Page 45
Page 46
Page 47
Page 48
Page 49
Page 50
Page 51
Page 52
APPENDIX A: PACIFIC ENGINEERING DOWNSTREAM ANALYSIS
Page 53
APPENDIX B: GEOTECHNICAL REPORT
Cobalt Geosciences, LLC
P.O. Box 82243
Kenmore, Washington 98028
www.cobaltgeo.com (206) 331-1097
March 3, 2023
Satwant Singh
pmvrsingh@gmail.com
RE: Permit Renewal
Proposed Townhomes
1600 Grant Avenue South
Renton, Washington
In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to
discuss permit renewal.
We note that much of the planned construction is nearly completed. It is our opinion that the
construction can continue per plan. Based on our observations at the site and observations
during periodic site visits during grading, we recommend routing runoff from impervious
surfaces to the detention system.
Infiltration systems are not feasible at this site due to several factors. These include the presence
of glacial till soils which are nearly impermeable and act as an aquitard; location and elevations of
new buildings (possible intrusion behind walls and into buildings); presence of shallow perched
groundwater in many areas (zero to minimal clearance above groundwater); presence of newer
structural fills over the native soils (not suitable to infiltrate into fills), and slope magnitudes
generally in excess of 15 percent in most locations.
We anticipate that final landscaping and any additional planned grading/construction will occur
per the approved plans during the upcoming dry grading season.
Sincerely,
Cobalt Geosciences, LLC
Phil Haberman, PE, LG, LEG 3/3/2023
Principal
PH/sc
Page 54
APPENDIX C: AS-BUILT SURVEY DRAWINGS