HomeMy WebLinkAboutSR_LUA23-000230_PACCAR_ERC_Report_V4DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
SR_Paccar Kenworth R&D Building Alteration_FINAL
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: August 28, 2023
Project File Number: PR23-000102
Project Name: Paccar Kenworth R&D Building Alteration
Land Use File Number: LUA23-000230, SEPA
Project Manager: Brianna Burroughs, Associate Planner
Owner: PACCAR INC 777 106th AVE NE Bellevue WA 98004
Applicant: Micharl Vander Ploeg
Contact: Micharl Vander Ploeg, DLR Group, 51 University ST, STE 600 Seattle WA 98101
Project Location: 485 Houser Way N Renton WA 98057
Project Summary: The applicant, PACCAR, is requesting Environmental (SEPA) Review for the
construction of a new 6,000 sf second floor mezzanine level inside an existing
structure to provide additional office space (Exhibit 2). In addition, the project
includes alterations to roughly 5,000 sf of existing first floor office space,
construction of a new 90’ x 22’ exterior canopy, and a 688 sf second story balcony
(Exhibit 3). With the exception of the canopy and balcony, all work would occur
within the existing 23,820 sf building envelope. The PACCAR site totals
approximately 66 acres and is comprised of multiple parcels. The proposed work
would occur at 485 Houser Way S (APN 722300010), located in the Heavy Industrial
(IH) zone and Employment Area (EA) Comprehensive Plan designation. The site is
currently accessed off Houser Way N. No changes parking, access, or landscaping
are proposed. 194 parking spaces and 25 semi-truck parking spaces are currently
provided on site. Critical areas mapped on the site include a high seismic hazard,
sensitive slopes, and the wellhead protection area zones 1 and 2. The applicant
submitted an Environmental Checklist and Traffic Memo with the application.
Exist. Bldg. Area SF: 23,820 SF Proposed New Internal Bldg. Area 6,000 SF
Site Area: 2,876,266 SF
(66 Acres)
Total Bldg. Gross Floor Area: 29,820 SF
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance (DNS).
DocuSign Envelope ID: 159A417A-1EDB-4F08-A72F-D715A2DCA7DA
City of Renton Department of Community & Economic Development
Paccar Kenworth R&D Building Alteration
Staff Report to the Environmental Review Committee
LUA23-000230, SEPA
Report of August 28, 2023 Page 2 of 3
SR_Paccar Kenworth R&D Building Alteration_FINAL
ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a DNS with a 14-day appeal period
B. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Floor Plan Set
Exhibit 4: Traffic Letter
Exhibit 5: Transportation Concurrency Memo
Exhibit 6: Public Comment letters
Exhibit 7: Staff Response to Public Comments
Exhibit 8: Advisory Notes
C. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
1. Earth
Impacts: The project area is within a high seismic hazard, sensitive slopes, and the wellhead protection
area zones 1 and 2. A Geotechnical Report was not included with the land use application materials .
The proposed exterior improvements to the existing building are limited. The perimeter of the building
is already covered by pavement. The 90’ x 22’ exterior canopy will require no earth disturbance as it is
designed to be installed completely attached to the building. The 688 SF second story balcony is
proposed to be built on pillars. The majority of the proposed project which is an interior mezzanine
tenant improvement, will also be installed using pillars. Therefore, minimal impact to earth disturbance
will be performed for installation of the project.
It is anticipated that the City’s adopted building code and construction standards would adequately
mitigate any impacts of the proposed tenant improvements on the project site; therefore, no further
mitigation is recommended.
Mitigation Measures: No mitigation recommended.
Nexus: N/A
2. Transportation
Impacts: The project area is creating 6,000 SF of new building area within the existing building through
the creation of a second story mezzanine. Public comment submitted (Exhibit 6) expressed concerns
over increased traffic on Meadow Ave N. It is not anticipated that the proposed mezzanine project
would generate any significant traffic impacts. The Traffic Memo provided by the applicant (Exhibit 4)
DocuSign Envelope ID: 159A417A-1EDB-4F08-A72F-D715A2DCA7DA
City of Renton Department of Community & Economic Development
Paccar Kenworth R&D Building Alteration
Staff Report to the Environmental Review Committee
LUA23-000230, SEPA
Report of August 28, 2023 Page 3 of 3
SR_Paccar Kenworth R&D Building Alteration_FINAL
states that occupancy load for the building will be increased by 10. A Traffic Impact Analysis was not
required as the addition would generate nine (9) AM peak hour trips and nine (9) PM peak hour trips,
which is fewer than the 20 peak hour trip threshold to require the analysis (Exhibit 8). . The application
passed the City Transportation Concurrency Test (Exhibit 5), and based upon the test of the citywide
Transportation Plan, consideration of growth levels included in the Level of Service tested
Transportation Plan, site specific improvements, and future payment of Transportation Impact Fees,
the proposal will have met the City’s concurrency requirements. The proposed additional building
square footage would be subject to transportation impact fees that are calculated and paid at the time
of building permit issuance. The 2023 transportation i mpact fee for general office space is currently
$16.39 per square foot. No change to parking is proposed.
Mitigation Measures: No mitigation recommended.
Nexus: N/A
D. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
✓ Copies of all Review Comments are contained in the Official File and may be attached to this report.
The Environmental Determination decision will become final if the decision is not appealed within the 14 -day
appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in
writing on or before 5:00 p.m. on September 11, 2023. Appeals must be submitted electronically to the City Clerk
at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee,
normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals
to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process
may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
DocuSign Envelope ID: 159A417A-1EDB-4F08-A72F-D715A2DCA7DA
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Paccar Kenworth R&D Building Alteration
Land Use File Number:
LUA23-000230, SEPA
Date of Meeting
August 28, 2023
Staff Contact
Brianna Burroughs
Associate Planner
Project Contact/Applicant
Micharl Vander Ploeg
DLR Group
51 University ST, STE 600
Seattle WA 98101
Project Location
485 Houser Way N
Renton, WA 98057
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Floor Plan Set
Exhibit 4: Traffic Letter
Exhibit 5: Transportation Concurrency Memo
Exhibit 6: Public Comment letters
Exhibit 7: Staff Response to Public Comments
Exhibit 8: Advisory Notes
DocuSign Envelope ID: 159A417A-1EDB-4F08-A72F-D715A2DCA7DA