Minor Franchise Permit: MFP23004262
IVR Number: 23004262
Permit Information
Permit Name: Comcast Cable Franchise Permit
CSG 409570Address/Location:08/15/2023Application Date:3342102610Parcel Number: 1209 N 35TH ST
Permit Type:08/30/2023Issue Date:Franchise
Permit Work Class:08/29/2024Expiration Date:Minor Utility
Job Number: 409570Franchise Type:Cable
Description: Comcast CSG 409570 Requesting to bore 85' in r/w and place 2" PVC. Begin at pole on southwest corner of 1218's
property boring 15' east then 24' under driveway with a 8' X 10' open cut then bore 5' south then 29' under road with a
2'X5' open cut. Continue boring 12' south to private property. Utility crossing to be potholed to ensure required
separation is maintained, locations to be identified at pre con inspection. All substructures have a 36 inch cover.
Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Christie Walker
Prince Telecom
13701 24th St E Building G, Building
G
Sumner, WA 98390
ApplicantX
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Contact
Akisha Brown
Prince Telecom Inc
551A Mews Dr
New Castle, DE 19720
B: (302) 482-8893
C: (302) 482-8892
Contractor
Business License Number: 29850Electrical Contractor: PRINCTL834BF
Construction Contractor: PRINCTL862PS
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Emergency
Contact
ANTOINE APHRODYI+ARISTOTLE 1209 N 35TH ST
RENTON , WA 98056
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
CSG 409570
1209 N 35TH ST Renton,WA 98056
MONDAY -FRIDAY 1 DAY 8AM 3PM
Prince Telecom LLC
Christie Walker or Ryan Wilkerson 253-294-6548 or 253-261-1882
13701 24th St E Bldg "G"Sumner,WA 98390
Requesting to bore 85'in r/w and place 2"PVC.Begin at pole on southwest corner of 1218's property boring 15'
east then 24'under driveway with a 8'X 10'open cut then bore 5'south then 29'under road with a 2'X5'open
cut.Continue boring 12'south to private property.Utility crossing to be potholed to ensure required separation is
maintained,locations to be identified at pre con inspection.All substructures have a 36 inch cover.
MFP23004262
Scott Warlick CED 8/30/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
08/15/2023
Christie Walker
TYPICAL PROTECTIVEVEHICLE TYPEWITH TMA
TYPICAL PROTECTIVE VEHICLE(WITH TMA) LOADED WEIGHT(LBS)
STATIONARYOPERATION(ft)
30 MIN.
100 max.
MINUMIM WEIGHT 16000 LBS(MAXIMUM WEIGHT SHALL BE IN ACCORDANCEWITH MANUFACTURER RECOMMENDATION
4 YARD DUMP TRUCKSERVICE TRUCKFLAT BED, ETC
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
LONGITUDINAL BUFFER SPACE = B
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT
A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE IF NO TMA IS USED,THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO SHIELD WORKERS ANDNO ROLL AHEAD DISTANCE IS SPECIFIED. REFER TO CHAPTER 1.5.5 FOR ADDITIONAL INFORMATION
CHANNELIZING DEVICE SPACING CHART (FEET)
50/70
35/45
20/30
mph *Half-Spacing*TAPER TANGENT
20
N/A
40
30
20
80
60
40N/ABUFFER DATALONGITUDINAL BUFFER SPACE = B
SPEED (mph)
LENGTH (ft)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
MINIMUM TAPER LENGTH = L (feet)
POSTED SPEED (mph)
25 30 35 40 45 50 55 60 65 70
LANEWIDTH(feet)
10
1112
105115125
150
165180
205225245
270
295
320
450
495540
500
550
600
550
605660 660720
-----780 840
SIGN SPACING = X (FEET) (1)
FREEWAYS & EXPRESSWAYS
RURAL HIGHWAYS
RURAL ROADS
RURAL ROADS and URBAN ARTERIALS
RURAL ROAD, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
55/70 mph
60/65 mph
45/55 mph
35/40 mph
25/30 mph
25mph or less
1500ft +/-
800ft +/-
500ft +/-
350ft +/-
200ft +/-(2)
100ft +/-(2)
(1) All spacing may be adjusted to accomodate interchange ramps, at-grade
intersections, and driveways.(2) This spacing may be reduced in urban areas to fit roadway conditions.
MERGING, SHIFTING, and SHOULDER TAPER LENGTHSand NUMBER OF CHANNELIZATION DEVICES USED
10ft LANE 11ft LANE 12ft LANE
L L L1/2L 1/2L 1/2L
Lanewidth
MPH Merging Merging MergingDevicesShiftingDevicesDevicesDevicesDevices DevicesShiftingShifting
SHOULDER TAPERS(assume 10ft shoulders)
1/3L Devices(FT)LengthMPH
2025303540455055606570
70105150205270450500550600650700
668810161415161719
355575105135225250275300325350
345569889910
75115165225295495550605660715770
679911181516181920
406085115150250285305330370385
3455698991011
80125180245320540600660720780840
6710912191618192122
406590125160270300330360390420
345561099101112
2025303540455055606570
2535507090150170185200220235
33344666677
Shoulder tapers equalsshoulder Width x Speed/3
Prince telecom
telecommunications
installation
Christie Walker
253-891-2899
JOB # CSG409570
<29'>N 35th St Park Ave NROADWORKAHEADW20-1 W20-7aW20-4
100'
A B C
100'100'ONE LANEROADAHEADROADWORKAHEADW20-1W20-7bABBE PREPAREDTO STOP100'100'W20-7aC100'ROADWORKAHEAD W20-1W20-7bABBE PREPAREDTO STOP100'100'W20-7aC100'<24'><12'>Drive waybore
KENNY'S TRAFFIC ZONE PLANSTRAFFIC CONTROL PLAN PREPARATION
PH # 425-223-7689TRAFICPLAYR@AOL.COMLongview, Wa STOP
KENNY STERTZTRAFFIC CONTROL SUPERVISORWashington Oregon
((ID# WA016416 SJ833BD.O.E 03/29/2026 5/31/2024
flagger -NO PARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T38
cones -open cut-
3503
1209 sidewalkRoad boreDriveway
X
<5'><15'>
1213
Driveway
DrivewayDriveway
2'x5
'
8'x10'
poleexisting
Park Ave N
-Minimum 10' Lanes
-Flagger will Guide any
Pedestrians pass the work area
NOTES :
-No Parking signs shall be placed 24hrs
in advance of work
-New Home's Construction Driveway's
will be blocked and notified of
Date & Time of expected work
1218
NORTH
NOT TO SCALE
www.invarion.com
MFP23004262
Requesting to bore 85' in r/w and place 2" PVC. Begin at pole on southwest corner of
1218's property boring 15' east then 24' under driveway with a 8' X 10' open cut then
bore 5' south then 29' under road with a 2'X5' open cut. Continue boring 12' south to
private property. Utility crossing to be potholed to ensure required separation is
maintained, locations to be identified at pre con inspection. All substructures have a 36
inch cover.
Date: 8/15/23
ENGINEERED FOR:DROP BURY
REVISION
Comcast ESS
DatePrepared By:Christie Walker
253-294-6548 Rev
Place Large Photo Detail Here
CSG 409570 3342102610 1209 N 35TH ST RENTON,WA 98056 SOW Detail Overview
EXISTING POLE
12' ROW BORE
24' DWB
15' ROW BORE
29' ROAD BORE
8'X 10' OPEN CUT
5' ROW BORE
2'X 5' OPEN CUT
1218
MFP23004262
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
Requesting to bore 85' in r/w and place 2" PVC. Begin at pole on southwest corner of
1218's property boring 15' east then 24' under driveway with a 8' X 10' open cut then
bore 5' south then 29' under road with a 2'X5' open cut. Continue boring 12' south to
private property. Utility crossing to be potholed to ensure required separation is
maintained, locations to be identified at pre con inspection. All substructures have a 36
inch cover.
Date: 8/15/23
ENGINEERED FOR:DROP BURY
REVISION
Comcast ESS
Prepared By:Christie Walker
253-294-6548 Rev Date
Place Large Photo Detail Here
CSG 409570 3342102610 1209 N 35TH ST RENTON,WA 98056 SOW Detail Overview
EXISTING POLE
12' ROW BORE
24' DWB
15' ROW BORE
29' ROAD BORE
8'X 10' OPEN CUT
5' ROW BORE
2'X 5' OPEN CUT
1218
Place Large Photo Detail Here
CSG 409570 3342102610 1209 N 35TH ST RENTON,WA 98056 SOW Detail Overview
Prepared By:Christie Walker
253-294-6548 Rev Requesting to bore 85' in r/w and place 2" PVC. Begin at pole on southwest corner of
1218's property boring 15' east then 24' under driveway with a 8' X 10' open cut then
bore 5' south then 29' under road with a 2'X5' open cut. Continue boring 12' south to
private property. Utility crossing to be potholed to ensure required separation is
maintained, locations to be identified at pre con inspection. All substructures have a 36
inch cover.
Date: 8/15/23
ENGINEERED FOR:DROP BURY
REVISION
Comcast ESS
Date
EXISTING POLE
24' DWB
15' ROW BORE
8'X 10' OPEN CUT
5' ROW BORE
2'X 5' OPEN CUT
1218
Requesting to bore 85' in r/w and place 2" PVC. Begin at pole on southwest corner of
1218's property boring 15' east then 24' under driveway with a 8' X 10' open cut then
bore 5' south then 29' under road with a 2'X5' open cut. Continue boring 12' south to
private property. Utility crossing to be potholed to ensure required separation is
maintained, locations to be identified at pre con inspection. All substructures have a 36
inch cover.
Date: 8/15/23
ENGINEERED FOR:DROP BURY
REVISION
Comcast ESS
Prepared By:Christie Walker
253-294-6548 Rev Date
Place Large Photo Detail Here
CSG 409570 3342102610 1209 N 35TH ST RENTON,WA 98056 SOW Detail Overview
12' ROW BORE 29' ROAD BORE
2'X 5' OPEN CUT
1218