Loading...
HomeMy WebLinkAboutEx13_Bid Documents (Sheets 235-258)••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••RAINIER AVE N JUDO BOXING NE L S O N P L N W NW 3RD PLGERBER COLLISION & GLASS ADVANCE AUTO TUNE GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS SIGN SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 235 285 JULY 2022 14087A 235 STA 39+00 TO STA 43+50 CHANNELIZATION & SIGNING PLAN PLAN KPF KPF RBD STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST S 3RD ST HERTZ/LYFT SAFEWAY SHELL 7-ELEVEN SLEEPLESS COFFEE FREDDIE'S CASINO GENERAL CHANNELIZATION & SIGNING NOTES GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS SIGN SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH03.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 236 285 JULY 2022 14087A 236 STA 201+50 TO STA 205+00 CHANNELIZATION & SIGNING PLAN RBD KPF KPF STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST AIRPORT WAY LAKE AVE S•••••••••••••••••••••• •••••••••••••••••••• ••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••• GENERAL CHANNELIZATION & SIGNING NOTES GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS RENTON AVENUE EXT •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••MCDONALD'S ARCO SIGN SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH03.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 237 285 JULY 2022 14087A 237 STA 595+69 TO STA 598+50 & STA 601+50 TO STA 605+50 CHANNELIZATION & SIGNING PLAN RBD KPF KPF PLAN STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S SW SUNSET BLVDS 3RD ST CONSTRUCTION NOTES CORRESPONDING SHEETS PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022LANDSCAPE PLAN STA 11+00 TO STA 15+00 238 14087A JULY 2022 285238 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF JS JS CS SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 239 285 JULY 2022 14087A 239 STA 15+00 TO STA 18+25 LANDSCAPE PLAN PLAN JS JS CS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S S 2ND STCORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 240 285 JULY 2022 14087A 240 STA 18+25 TO STA 22+50 LANDSCAPE PLAN PLAN JS JS CS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST SW VICTORIA STHAY E S PL S W RAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 241 285 JULY 2022 14087A 241 STA 22+50 TO STA 27+00 LANDSCAPE PLAN PLAN JS JS CS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST CORRESPONDING SHEETS RAINIER AVE S S TOBIN ST CONSTRUCTION NOTES PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS02.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022LANDSCAPE PLAN STA 27+00 TO STA 31+00 242 14087A JULY 2022 285242 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF JS JS CS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RENTON AVENUE EXT RAINIER AVE N AIRPORT WAYRAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS02.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 243 285 JULY 2022 14087A 243 STA 31+00 TO STA 35+50 LANDSCAPE PLAN PLAN CS JS JS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST N E L S O N P L N W RAINIER AVE N CORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS02.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 244 285 JULY 2022 14087A 244 STA 35+50 TO STA 39+00 LANDSCAPE PLAN PLAN CS JS JS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE NNW 3RD PLN E L S O N P L S W CORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS02.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 245 285 JULY 2022 14087A 245 STA 39+00 TO STA 43+50 LANDSCAPE PLAN PLAN CS JS JS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST S 3RD ST CORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS03.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 246 285 JULY 2022 14087A 246 STA 201+50 TO STA 205+00 LANDSCAPE PLAN JS JS CS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST AIRPORT WAY LAKE AVE SCORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS03.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 05 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 247 285 JULY 2022 14087A 247 STA 601+50 TO STA 605+50 LANDSCAPE PLANCS JS JS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LSDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022248 14087A JULY 2022 285248 KPG JF JS JS CS (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 LANDSCAPE NOTES & SCHEDULE STP(UL) -1615(005) TREE SCHEDULE PLANTING SCHEDULE DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST TREE PLANTING NOTES TREE PROTECTION NOTES 249 14087A JULY 2022 285249 KPG JF JS JS CS NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LSDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L IZ ABETH S CHMI DTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHIN G TONLAND S CAPE A R C H ITECT7 -13 -2022(S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 LANDSCAPE DETAILS STP(UL) -1615(005) TYPICAL SHRUB/GROUNDCOVER PLANTING DETAIL TYPICAL ROOT BARRIER DETAIL TYPICAL DECIDUOUS TREE PLANTING DETAIL TYPICAL TREE GRATE PLANTING DETAIL TYPICAL EVERGREEN TREE PLANTING DETAIL TREE PROTECTION DETAIL DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S SW SUNSET BLVDS 3RD STCORRESPONDING SHEETS CONSTRUCTION NOTES CONSTRUCTION NOTES GENERAL NOTES GENERAL NOTES WASTE RECEPTACLE SCHEDULE BENCH SCHEDULE GATEWAY TRELLIS SCHEDULE PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022URBAN DESIGN PLAN STA 11+00 TO STA 15+00 250 14087A JULY 2022 285250 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF HF PN PN STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES CONSTRUCTION NOTES GENERAL NOTES GENERAL NOTES TREE GRATE SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2023STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 251 285 JULY 2022 14087A 251 STA 15+00 TO STA 18+25 URBAN DESIGN PLAN PLAN HF PN PN STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S S 2ND STCORRESPONDING SHEETS CONSTRUCTION NOTES CONSTRUCTION NOTES GENERAL NOTES GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2023STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 252 285 JULY 2022 14087A 252 STA 18+25 TO STA 22+50 URBAN DESIGN PLAN PLAN HF PN PN STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST SW VICTORIA STHAY E S P L S W RAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES CONSTRUCTION NOTES GENERAL NOTES GENERAL NOTES TREE GRATE SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2023STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 253 285 JULY 2022 14087A 253 STA 22+50 TO STA 27+00 URBAN DESIGN PLAN PLAN JS PN PN STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST CORRESPONDING SHEETS S TOBIN STRAINIER AVE S CONSTRUCTION NOTES GENERAL NOTES TREE GRATE SCHEDULE PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB02.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2023STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022URBAN DESIGN PLAN STA 27+00 TO STA 31+00 254 14087A JULY 2022 285254 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF JS PN PN STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RENTON AVENUE EXT RAINIER AVE N AIRPORT WAYRAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES GENERAL NOTES PLANTER SCHEDULEWALL B SCHEDULE WALL A SCHEDULE BENCH SCHEDULE WASTE RECEPTACLE SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB02.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 255 285 JULY 2022 14087A 255 STA 31+00 TO STA 35+50 URBAN DESIGN PLAN PLAN PN PN JS STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE N CORRESPONDING SHEETS CONSTRUCTION NOTES GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB02.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 256 285 JULY 2022 14087A 256 STA 35+50 TO STA 39+00 URBAN DESIGN PLAN PLAN PN PN JS STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST S 3RD ST CORRESPONDING SHEETS CONSTRUCTION NOTES GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB03.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 257 285 JULY 2022 14087A 257 STA 201+50 TO STA 205+00 URBAN DESIGN PLAN JS PN PN STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URBDET01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W ASHIN GTONLAND S CAPE A R C H IT ECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022258 14087A JULY 2022 285258 KPG JF YS PN PN (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 GATEWAY WALL A & B DETAILS STP(UL) -1615(005) GATEWAY WALL A & B DETAIL DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST