HomeMy WebLinkAboutEx12_Bid Documents (Sheets 211-234)PANEL SCHEDULE
S4
RAINIER AVE N RAINIER AVE NRENTON AVE EXTNW 3RD PLACEAIRPORT WAYS5
PANEL SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILLDET.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANIK
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022211
14087A
JULY 2022
285211
KPG
JF
EH
DE
JC
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
ILLUMINATION DETAILS
STP(UL) -1615(005)
ONE-LINE DIAGRAM
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
••••••••••••• • ••• • • •
• •••• •••• •••• •••• •••• •••
•• •••• •••• •••• •••• •••• ••••••••••
••••••••••••• •S 3RD STSW SUNSET BLVD•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••••••••• • •••• •••••••••••••••••••••• • ••• •• ••• • ••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••• ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••RAINIER AVE S
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:DATE:DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
1-X-2018Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022PROPOSED SIGNAL HEAD ASSIGNMENTS
EVPE SCHEDULE
SCHEDULE
VIDEO DETECTION
PHASE SEQUENCE DIAGRAM
EXISTING SIGNAL HEAD
ASSIGNMENTS
APPROVED FOR CONSTRUCTION
BY
SIGNALIZATION PLAN
RAINIER AVE S & S 3RD ST
212
14087A
JULY 2022
285212
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
PLAN
EXISTING TRAFFIC SIGNAL SYSTEM SHALL
REMAIN FULLY OPERATIONAL UNTIL DAY OF
CHANGEOVER WHEN UNIFORMED POLICE
OFFICER SHALL DIRECT TRAFFIC.
STP(UL) -1615(005)
LEGEND
PLAN
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANIK
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGNALIZATION PLAN
RAINIER AVE S & S 3RD ST NOTES
213
14087A
JULY 2022
285213
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
CONSTRUCTION NOTESGENERAL NOTES
STP(UL) -1615(005)
WIRE NOTES
SIGNAL POLE EQUIPMENT SCHEDULE
PUSH BUTTON SCHEDULE
SIGN SCHEDULE
Rainier Ave S
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANIK
1-X-2018Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGNALIZATION PLAN
RAINIER AVE S & S 3RD ST WIRING DIAGRAM
214
14087A
JULY 2022
285214
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
STP(UL) -1615(005)TRAFFIC SIGNAL CONTROLLER CABINETGPS-1
POLE #3
POLE #2
INPUT OUTPUT
POLE #5
POLE #7
EXISTING POLE #6
(AT POLE BASE)
SCHEMATIC FIELD WIRING DIAGRAM
(NOT TO SCALE)
EXISTING
POLE #10
POLE #4
(AT POLE BASE)
POLE #1
(AT POLE BASE)
POLE #8(AT
POLE BASE)
EVPE SCHEDULE
SCHEDULE
VIDEO DETECTION
PHASE SEQUENCE DIAGRAM
EXISTING
POLE #9
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
RAINIER AVE S
S 2ND STNUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
1-X-2018Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGNALIZATION PLAN
RAINIER AVE S & S 2ND ST
215
14087A
JULY 2022
285215
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
STP(UL) -1615(005)
PLAN
EXISTING TRAFFIC SIGNAL SYSTEM SHALL
REMAIN FULLY OPERATIONAL UNTIL DAY OF
CHANGEOVER WHEN UNIFORMED POLICE
OFFICER SHALL DIRECT TRAFFIC.
SIGNAL HEAD ASSIGNMENTS
EVPE SCHEDULE
SCHEDULE
VIDEO DETECTION
PHASE SEQUENCE DIAGRAM
GENERAL NOTES
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANIK
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGNALIZATION PLAN
RAINIER AVE S & S 2ND ST NOTES
216
14087A
JULY 2022
285216
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
SIGN SCHEDULE CONSTRUCTION NOTES
STP(UL) -1615(005)
WIRE NOTES
SIGNAL POLE EQUIPMENT SCHEDULE
PUSH BUTTON SCHEDULE
LEGEND
ONEWAYONEWAY
DO NOT
ENTER
ONLY
INTERSTATE
405
TO
CROSSWALK
USE
CROSSWALK
USE
S 2nd St Rainier Ave S
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANIK
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGNALIZATION PLAN
RAINIER AVE S & S 2ND ST WIRING DIAGRAM
217
14087A
JULY 2022
285217
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
STP(UL) -1615(005)
INPUT OUTPUT
TRAFFIC SIGNAL CONTROLLER CABINETPOLE #2
POLE #8
GPS-2
EVPE SCHEDULE
SCHEDULE
VIDEO DETECTION
POLE #6
POLE #7
PHASE SEQUENCE DIAGRAM
POLE #5
(AT POLE BASE)
POLE #1
(AT POLE BASE)
POLE #3
(AT POLE BASE)
SCHEMATIC FIELD WIRING DIAGRAM
(NOT TO SCALE)
POLE #4
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
RAINIER AVE S SW VICTORIA STHAY
E
S
PL
S
W
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
218 285
JULY 2022
14087A
218
RAINIER AVE S & SW VICTORIA ST
SIGNALIZATION PLAN
PLAN
EH
DE
JC
EVPE SCHEDULE
LEGEND
CONSTRUCTION NOTES
CROSSWALK
STOP
ON RED
STOP ON
FLASHING
IF NO
THEN PROCEED
STP(UL) -1615(005)
WIRE NOTES
SIGN SCHEDULE
CITY OF RENTON STANDARD PLAN NOTES PUSH BUTTON SCHEDULE
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
219 285
JULY 2022
14087A
219
RAINIER AVE S & SW VICTORIA ST WIRING DIAGRAM
SIGNALIZATION PLAN
EH
DE
JC
STP(UL) -1615(005)
GPS-3
POLE #2
POLE #3
(AT POLE BASE)
POLE #1
(AT POLE BASE)
INPUT OUTPUT
TRAFFIC SIGNAL CONTROLLER CABINETSCHEMATIC FIELD WIRING DIAGRAM
(NOT TO SCALE)
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
RAINIER AVE S
AIRPORT WAYRAINIER AVE NRENTON AVE
EXT
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG04_PHASECHANGE.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022EXISTING TRAFFIC SIGNAL SYSTEM SHALL
REMAIN FULLY OPERATIONAL UNTIL DAY
OF CHANGEOVER WHEN UNIFORMED
POLICE OFFICER SHALL DIRECT TRAFFIC.
SIGNALIZATION PLAN
RAINIER AVE S & AIRPORT WAY
220
14087A
JULY 2022
285220
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
STP(UL) -1615(005)
SIGNAL HEAD ASSIGNMENTS
PLAN
PHASE SEQUENCE DIAGRAM
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG04_PHASECHANGE.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGN SCHEDULE
CONSTRUCTION NOTESWIRE NOTES
RAINIER AVE S & AIRPORT WAY NOTES
221
14087A
SIGNALIZATION PLAN JULY 2022
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
285221
(S 3RD ST TO NW 3RD PL)DE
EH
JC
JF
STP(UL) -1615(005)
SIGNAL POLE EQUIPMENT SCHEDULE
PUSH BUTTON SCHEDULE
GENERAL NOTES
LEGEND
CONCURRENT PHASE SCHEDULE
EVPE SCHEDULE SCHEDULE
VIDEO DETECTION
Rainier Ave S Renton Ave ExtAirport Way
Airport WayRenton Ave Ext
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG04_PHASECHANGE.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGNALIZATION PLAN
RAINIER AVE S & AIRPORT WAY WIRING DIAGRAM
222
14087A
JULY 2022
285222
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
STP(UL) -1615(005)
INPUT OUTPUT
TRAFFIC SIGNAL CONTROLLER CABINETGPS-4
POLE #9
POLE #10 POLE #11
POLE #8
POLE #2
POLE #5
POLE #4
POLE #6
POLE #7
(AT POLE BASE)
POLE #12
(AT POLE BASE)
SCHEMATIC FIELD WIRING DIAGRAM
(NOT TO SCALE)
POLE #3
(AT POLE BASE)
POLE #1 (AT POLE BASE)
EVPE SCHEDULE SCHEDULE
VIDEO DETECTION
PHASE SEQUENCE DIAGRAM
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
RAINIER AVE NNW 3RD PLNUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG05.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
223 285
JULY 2022
14087A
223
RAINIER AVE N & NW 3RD PL
SIGNALIZATION PLAN
EH
DE
JC
STP(UL) -1615(005)
EVPE SCHEDULE
CROSSWALK
STOP
ON RED
STOP ON
IF NO
THEN PROCEED
SIGN SCHEDULE
CONSTRUCTION NOTES
PLAN
WIRE NOTES
FLASHING
CITY OF RENTON STANDARD PLAN NOTES
LEGEND
PUSH BUTTON SCHEDULE
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG05.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
224 285
JULY 2022
14087A
224
RAINIER AVE N & NW 3RD PL WIRING DIAGRAM
SIGNALIZATION PLAN
EH
DE
JC
STP(UL) -1615(005)
INPUT
TRAFFIC SIGNAL CONTROLLER CABINETPOLE #2
POLE #1
(AT POLE BASE)
POLE #3
(AT POLE BASE)
GPS-5
POLE #1
(AT POLE BASE)
SCHEMATIC FIELD WIRING DIAGRAM
(NOT TO SCALE)
OUTPUT
POLE #4
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
POLE ORIENTATION AND ATTACHMENT POINT DETAIL
NOTES
SIDEWALK THICKENED
EDGE AROUND
FOUNDATION DETAIL
NTS
SIGNAL STANDARD DETAIL CHART
RAINIER AVE S & S 3RD ST
VIDEO DETECTION CAMERA SIGNAL MAST ARM MOUNT DETAIL
POLE BASE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIGDET.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANIK
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGNAL POLE SPECIFICATIONS
225
14087A
JULY 2022
285225
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
STP(UL) -1615(005)
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
SIGNAL STANDARD DETAIL CHART
RAINIER AVE S & S 2ND ST
RAINIER AVE S & AIRPORT WAY
RAINIER AVE S & SW VICTORIA ST
RAINIER AVE S & S 3RD ST
RAINIER AVE N & NW 3RD PL
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIGDET.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGN
IHSAWFOETATS
ERN EPRFO
E NNALIO
E
S IGS
39324JANCIGANIK
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022SIGNAL POLE SPECIFICATIONS
226
14087A
JULY 2022
285226
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
STP(UL) -1615(005)
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
227 285
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• • • ••••••••••••••• •••• • •••••••••••••••••••••••••• • ••• •••••• •••••••••••••• ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••• •• ••• ••• •• ••• ••• •• ••• ••• •• ••• ••• •••••••••••••••••••••••••••••••••••••••••• •••••••••••• •• • ••• •• •
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••••••••••••••••••••• •••••••••••••••••••••
RAINIER AVE S SW SUNSET BLVDS 3RD STO'REILLY AUTO PARTSFIRESTONE
SHELL
7-ELEVEN
HERTZ/LYFT
WALGREENS
HE
R
T
Z
/
L
Y
F
T
SAF
E
W
A
Y
GENERAL CHANNELIZATION & SIGNING NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS
SIGN SCHEDULE
PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-CH01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGNIHSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P. FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022CHANNELIZATION & SIGNING PLAN
STA 11+00 TO STA 15+00
228
14087A
JULY 2022
285228
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
RBD
KPF
KPF
STP(UL) -1615(005)
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
RAINIER AVE S
WALGREENS MIDAS SANSONINA
HERTZ/LYFT
WENDY'S
TACO TIMESAFEWAY
GENERAL CHANNELIZATION & SIGNING NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS
SIGN SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-CH01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGNIHSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P. FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
229 285
JULY 2022
14087A
229
STA 15+00 TO STA 18+25
CHANNELIZATION & SIGNING PLAN
PLAN
KPF
KPF
RBD
STP(UL) -1615(005)
R3-7R (MOD)
STANDARD SIGN INFO STANDARD SIGN INFO
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
•••••••••••••••••••••••••••••••••••••••••••••••••••••••RAINIER AVE S
S 2ND STBIG ISLAND POKE
METRO PCS
SOUTH LAKE
EUROPEAN
AUTOZONE
TACO TIME VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL GRAVITY
SPORTS
GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES
CORRESPONDING SHEETS
SIGN SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-CH01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGNIHSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P. FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
230 285
JULY 2022
14087A
230
STA 18+25 TO STA 22+50
CHANNELIZATION & SIGNING PLAN
PLAN
KPF
KPF
RBD
STP(UL) -1615(005)
U-TURN ARROW
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
SW VICTORIA STHAY
E
S
P
L
S
W
RAINIER AVE S
GRAVITY
SPORTS
WATSON SECURITY
WEST WIND MOTEL ROYAL ORCHID FORMULA 1 FAST LUBE TOMMY'S CAFE
BROWN
BEAR
CAR
WASH
GENERAL CHANNELIZATION & SIGNING NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS
SIGN SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-CH01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGNIHSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P. FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
231 285
JULY 2022
14087A
231
STA 22+50 TO STA 27+00
CHANNELIZATION & SIGNING PLAN
PLAN
KPF
KPF
RBD
STP(UL) -1615(005)
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
GENERAL CHANNELIZATION & SIGNING NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS••••••••••••••••BROWN BEAR
RAINIER AVE S
BROWN BEAR
CAR WASH
CHEVRON MCDONALD'S
TOMMY'S CAFE
S TOBIN STSIGN SCHEDULE
PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-CH02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGNIHSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P. FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022CHANNELIZATION & SIGNING PLAN
STA 27+00 TO STA 31+00
232
14087A
JULY 2022
285232
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
RBD
KPF
KPF
STP(UL) -1615(005)
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
•••••••
•
•
•
•••••••••
•
•
•
•••••
•
••••••••••••••••••••RENTON AVE
EXTAIRPORT WAYBANNER BANK
ARCO
AM/PM RENTON LAUNDRY
RAINIER AVE N
MCDONALD'S
RAINIER AVE S
GENERAL CHANNELIZATION & SIGNING NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS
SIGN SCHEDULE
SIGN SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-CH02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGNIHSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P. FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
233 285
JULY 2022
14087A
233
STA 31+00 TO STA 35+50
CHANNELIZATION & SIGNING PLAN
PLAN
KPF
KPF
RBD
STP(UL) -1615(005)
SLOW BIKE DETAIL
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST
MATHEWSON'S
AUTOMOTIVE
N
E
L
S
O
N
P
L
N
W
RAINIER AVE N
GENERAL CHANNELIZATION & SIGNING NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS
SIGN SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-CH02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
REGISTE R E D NOTGNIHSAWFOETATS
ERNEPRFO
E NNALIO
E
S IGS
47649KARINA P. FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13 -2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
234 285
JULY 2022
14087A
234
STA 35+50 TO STA 39+00
CHANNELIZATION & SIGNING PLAN
PLAN
KPF
KPF
RBD
STP(UL) -1615(005)
DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C
12/22/2022 | 4:08 PM PST