Loading...
HomeMy WebLinkAboutEx12_Bid Documents (Sheets 211-234)PANEL SCHEDULE S4 RAINIER AVE N RAINIER AVE NRENTON AVE EXTNW 3RD PLACEAIRPORT WAYS5 PANEL SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILLDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANIK Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022211 14087A JULY 2022 285211 KPG JF EH DE JC (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 ILLUMINATION DETAILS STP(UL) -1615(005) ONE-LINE DIAGRAM DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST ••••••••••••• • ••• • • • • •••• •••• •••• •••• •••• ••• •• •••• •••• •••• •••• •••• •••••••••• ••••••••••••• •S 3RD STSW SUNSET BLVD•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••••••••• • •••• •••••••••••••••••••••• • ••• •• ••• • ••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••• ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••RAINIER AVE S NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:DATE:DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K 1-X-2018Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022PROPOSED SIGNAL HEAD ASSIGNMENTS EVPE SCHEDULE SCHEDULE VIDEO DETECTION PHASE SEQUENCE DIAGRAM EXISTING SIGNAL HEAD ASSIGNMENTS APPROVED FOR CONSTRUCTION BY SIGNALIZATION PLAN RAINIER AVE S & S 3RD ST 212 14087A JULY 2022 285212 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF PLAN EXISTING TRAFFIC SIGNAL SYSTEM SHALL REMAIN FULLY OPERATIONAL UNTIL DAY OF CHANGEOVER WHEN UNIFORMED POLICE OFFICER SHALL DIRECT TRAFFIC. STP(UL) -1615(005) LEGEND PLAN DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANIK Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGNALIZATION PLAN RAINIER AVE S & S 3RD ST NOTES 213 14087A JULY 2022 285213 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF CONSTRUCTION NOTESGENERAL NOTES STP(UL) -1615(005) WIRE NOTES SIGNAL POLE EQUIPMENT SCHEDULE PUSH BUTTON SCHEDULE SIGN SCHEDULE Rainier Ave S DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANIK 1-X-2018Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGNALIZATION PLAN RAINIER AVE S & S 3RD ST WIRING DIAGRAM 214 14087A JULY 2022 285214 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF STP(UL) -1615(005)TRAFFIC SIGNAL CONTROLLER CABINETGPS-1 POLE #3 POLE #2 INPUT OUTPUT POLE #5 POLE #7 EXISTING POLE #6 (AT POLE BASE) SCHEMATIC FIELD WIRING DIAGRAM (NOT TO SCALE) EXISTING POLE #10 POLE #4 (AT POLE BASE) POLE #1 (AT POLE BASE) POLE #8(AT POLE BASE) EVPE SCHEDULE SCHEDULE VIDEO DETECTION PHASE SEQUENCE DIAGRAM EXISTING POLE #9 DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S S 2ND STNUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K 1-X-2018Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGNALIZATION PLAN RAINIER AVE S & S 2ND ST 215 14087A JULY 2022 285215 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF STP(UL) -1615(005) PLAN EXISTING TRAFFIC SIGNAL SYSTEM SHALL REMAIN FULLY OPERATIONAL UNTIL DAY OF CHANGEOVER WHEN UNIFORMED POLICE OFFICER SHALL DIRECT TRAFFIC. SIGNAL HEAD ASSIGNMENTS EVPE SCHEDULE SCHEDULE VIDEO DETECTION PHASE SEQUENCE DIAGRAM GENERAL NOTES DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANIK Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGNALIZATION PLAN RAINIER AVE S & S 2ND ST NOTES 216 14087A JULY 2022 285216 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF SIGN SCHEDULE CONSTRUCTION NOTES STP(UL) -1615(005) WIRE NOTES SIGNAL POLE EQUIPMENT SCHEDULE PUSH BUTTON SCHEDULE LEGEND ONEWAYONEWAY DO NOT ENTER ONLY INTERSTATE 405 TO CROSSWALK USE CROSSWALK USE S 2nd St Rainier Ave S DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANIK Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGNALIZATION PLAN RAINIER AVE S & S 2ND ST WIRING DIAGRAM 217 14087A JULY 2022 285217 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF STP(UL) -1615(005) INPUT OUTPUT TRAFFIC SIGNAL CONTROLLER CABINETPOLE #2 POLE #8 GPS-2 EVPE SCHEDULE SCHEDULE VIDEO DETECTION POLE #6 POLE #7 PHASE SEQUENCE DIAGRAM POLE #5 (AT POLE BASE) POLE #1 (AT POLE BASE) POLE #3 (AT POLE BASE) SCHEMATIC FIELD WIRING DIAGRAM (NOT TO SCALE) POLE #4 DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S SW VICTORIA STHAY E S PL S W NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG03.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 218 285 JULY 2022 14087A 218 RAINIER AVE S & SW VICTORIA ST SIGNALIZATION PLAN PLAN EH DE JC EVPE SCHEDULE LEGEND CONSTRUCTION NOTES CROSSWALK STOP ON RED STOP ON FLASHING IF NO THEN PROCEED STP(UL) -1615(005) WIRE NOTES SIGN SCHEDULE CITY OF RENTON STANDARD PLAN NOTES PUSH BUTTON SCHEDULE DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG03.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 219 285 JULY 2022 14087A 219 RAINIER AVE S & SW VICTORIA ST WIRING DIAGRAM SIGNALIZATION PLAN EH DE JC STP(UL) -1615(005) GPS-3 POLE #2 POLE #3 (AT POLE BASE) POLE #1 (AT POLE BASE) INPUT OUTPUT TRAFFIC SIGNAL CONTROLLER CABINETSCHEMATIC FIELD WIRING DIAGRAM (NOT TO SCALE) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S AIRPORT WAYRAINIER AVE NRENTON AVE EXT NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG04_PHASECHANGE.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022EXISTING TRAFFIC SIGNAL SYSTEM SHALL REMAIN FULLY OPERATIONAL UNTIL DAY OF CHANGEOVER WHEN UNIFORMED POLICE OFFICER SHALL DIRECT TRAFFIC. SIGNALIZATION PLAN RAINIER AVE S & AIRPORT WAY 220 14087A JULY 2022 285220 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF STP(UL) -1615(005) SIGNAL HEAD ASSIGNMENTS PLAN PHASE SEQUENCE DIAGRAM DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG04_PHASECHANGE.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGN SCHEDULE CONSTRUCTION NOTESWIRE NOTES RAINIER AVE S & AIRPORT WAY NOTES 221 14087A SIGNALIZATION PLAN JULY 2022 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 285221 (S 3RD ST TO NW 3RD PL)DE EH JC JF STP(UL) -1615(005) SIGNAL POLE EQUIPMENT SCHEDULE PUSH BUTTON SCHEDULE GENERAL NOTES LEGEND CONCURRENT PHASE SCHEDULE EVPE SCHEDULE SCHEDULE VIDEO DETECTION Rainier Ave S Renton Ave ExtAirport Way Airport WayRenton Ave Ext DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG04_PHASECHANGE.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGNALIZATION PLAN RAINIER AVE S & AIRPORT WAY WIRING DIAGRAM 222 14087A JULY 2022 285222 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF STP(UL) -1615(005) INPUT OUTPUT TRAFFIC SIGNAL CONTROLLER CABINETGPS-4 POLE #9 POLE #10 POLE #11 POLE #8 POLE #2 POLE #5 POLE #4 POLE #6 POLE #7 (AT POLE BASE) POLE #12 (AT POLE BASE) SCHEMATIC FIELD WIRING DIAGRAM (NOT TO SCALE) POLE #3 (AT POLE BASE) POLE #1 (AT POLE BASE) EVPE SCHEDULE SCHEDULE VIDEO DETECTION PHASE SEQUENCE DIAGRAM DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE NNW 3RD PLNUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG05.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 223 285 JULY 2022 14087A 223 RAINIER AVE N & NW 3RD PL SIGNALIZATION PLAN EH DE JC STP(UL) -1615(005) EVPE SCHEDULE CROSSWALK STOP ON RED STOP ON IF NO THEN PROCEED SIGN SCHEDULE CONSTRUCTION NOTES PLAN WIRE NOTES FLASHING CITY OF RENTON STANDARD PLAN NOTES LEGEND PUSH BUTTON SCHEDULE DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG05.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 224 285 JULY 2022 14087A 224 RAINIER AVE N & NW 3RD PL WIRING DIAGRAM SIGNALIZATION PLAN EH DE JC STP(UL) -1615(005) INPUT TRAFFIC SIGNAL CONTROLLER CABINETPOLE #2 POLE #1 (AT POLE BASE) POLE #3 (AT POLE BASE) GPS-5 POLE #1 (AT POLE BASE) SCHEMATIC FIELD WIRING DIAGRAM (NOT TO SCALE) OUTPUT POLE #4 DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST POLE ORIENTATION AND ATTACHMENT POINT DETAIL NOTES SIDEWALK THICKENED EDGE AROUND FOUNDATION DETAIL NTS SIGNAL STANDARD DETAIL CHART RAINIER AVE S & S 3RD ST VIDEO DETECTION CAMERA SIGNAL MAST ARM MOUNT DETAIL POLE BASE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIGDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANIK Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGNAL POLE SPECIFICATIONS 225 14087A JULY 2022 285225 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST SIGNAL STANDARD DETAIL CHART RAINIER AVE S & S 2ND ST RAINIER AVE S & AIRPORT WAY RAINIER AVE S & SW VICTORIA ST RAINIER AVE S & S 3RD ST RAINIER AVE N & NW 3RD PL NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIGDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGN IHSAWFOETATS ERN EPRFO E NNALIO E S IGS 39324JANCIGANIK Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022SIGNAL POLE SPECIFICATIONS 226 14087A JULY 2022 285226 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST 227 285 DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• • • ••••••••••••••• •••• • •••••••••••••••••••••••••• • ••• •••••• •••••••••••••• ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••• •• ••• ••• •• ••• ••• •• ••• ••• •• ••• ••• •••••••••••••••••••••••••••••••••••••••••• •••••••••••• •• • ••• •• • •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• ••••••••••••••••••••• ••••••••••••••••••••• RAINIER AVE S SW SUNSET BLVDS 3RD STO'REILLY AUTO PARTSFIRESTONE SHELL 7-ELEVEN HERTZ/LYFT WALGREENS HE R T Z / L Y F T SAF E W A Y GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS SIGN SCHEDULE PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022CHANNELIZATION & SIGNING PLAN STA 11+00 TO STA 15+00 228 14087A JULY 2022 285228 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF RBD KPF KPF STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST RAINIER AVE S WALGREENS MIDAS SANSONINA HERTZ/LYFT WENDY'S TACO TIMESAFEWAY GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS SIGN SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 229 285 JULY 2022 14087A 229 STA 15+00 TO STA 18+25 CHANNELIZATION & SIGNING PLAN PLAN KPF KPF RBD STP(UL) -1615(005) R3-7R (MOD) STANDARD SIGN INFO STANDARD SIGN INFO DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST •••••••••••••••••••••••••••••••••••••••••••••••••••••••RAINIER AVE S S 2ND STBIG ISLAND POKE METRO PCS SOUTH LAKE EUROPEAN AUTOZONE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS SIGN SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 230 285 JULY 2022 14087A 230 STA 18+25 TO STA 22+50 CHANNELIZATION & SIGNING PLAN PLAN KPF KPF RBD STP(UL) -1615(005) U-TURN ARROW DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST SW VICTORIA STHAY E S P L S W RAINIER AVE S GRAVITY SPORTS WATSON SECURITY WEST WIND MOTEL ROYAL ORCHID FORMULA 1 FAST LUBE TOMMY'S CAFE BROWN BEAR CAR WASH GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS SIGN SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH01.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 231 285 JULY 2022 14087A 231 STA 22+50 TO STA 27+00 CHANNELIZATION & SIGNING PLAN PLAN KPF KPF RBD STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS••••••••••••••••BROWN BEAR RAINIER AVE S BROWN BEAR CAR WASH CHEVRON MCDONALD'S TOMMY'S CAFE S TOBIN STSIGN SCHEDULE PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022CHANNELIZATION & SIGNING PLAN STA 27+00 TO STA 31+00 232 14087A JULY 2022 285232 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF RBD KPF KPF STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST ••••••• • • • ••••••••• • • • ••••• • ••••••••••••••••••••RENTON AVE EXTAIRPORT WAYBANNER BANK ARCO AM/PM RENTON LAUNDRY RAINIER AVE N MCDONALD'S RAINIER AVE S GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS SIGN SCHEDULE SIGN SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 233 285 JULY 2022 14087A 233 STA 31+00 TO STA 35+50 CHANNELIZATION & SIGNING PLAN PLAN KPF KPF RBD STP(UL) -1615(005) SLOW BIKE DETAIL DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST MATHEWSON'S AUTOMOTIVE N E L S O N P L N W RAINIER AVE N GENERAL CHANNELIZATION & SIGNING NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS SIGN SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-CH02.dwg BID DOCUMENT Public Works Department CITY OF RENTON REGISTE R E D NOTGNIHSAWFOETATS ERNEPRFO E NNALIO E S IGS 47649KARINA P. FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13 -2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 234 285 JULY 2022 14087A 234 STA 35+50 TO STA 39+00 CHANNELIZATION & SIGNING PLAN PLAN KPF KPF RBD STP(UL) -1615(005) DocuSign Envelope ID: ED11A2E1-DBB3-400C-ADE2-AA437739BE4C 12/22/2022 | 4:08 PM PST