Loading...
HomeMy WebLinkAbout7945.04 E 2023 0823Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 4 Report ID 7945.04 E 2023 0823 Date Wed 8/23/2023 Weather 75°F Clear Arrival/Departure Time(s) 9AM; 9:45AM Travel Time (hr)1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe the Redi Rock wall keyway and drainage. Redi Rock Wall Observations ESNW rep was onsite to observe wall keyway. ESNW rep observed the contractor had excavated a keyway approximately 5 feet in width into native grey silt with gravel. ESNW rep used a ½” steel T-probe to probe the keyway and observed it to be very dense, firm, unyielding, and suitable for proposed Redi Rock wall. ESNW rep also observed drainpipe along the back of the wall along the base. An 18” column of drain rock was placed directly behind the wall blocks to the top of wall. Report ID 7945.04 E 2023 0823 Page 2 of 4 Earth Solutions NW, LLC Report ID 7945.04 E 2023 0823 Page 3 of 4 Earth Solutions NW, LLC Report ID 7945.04 E 2023 0823 Page 4 of 4 Earth Solutions NW, LLC