HomeMy WebLinkAboutCM_Construction_Mitigation_230825_v1
July 26, 2023
Project No. 22052
CITY OF RENTON
CONSTRUCTION MITIGATION REPORT
MOUNTAIN VIEW GARDE NS
The following is a report of expected construction dates and times, as well as
proposed hauling/transportation routes, ESC measures and traffic control plan.
Proposed Construction Dates: Clearing, Grading, Utilities and Roads
Summer 2024-Spring 2025
Hours and Days of Operation: Normal site hours of operation will be in
compliance with the allowable working hours in the City of Renton which are as
follows:
For new single-family residences and non-residential construction, the permitted
work hours are 7:00am-8:00pm Monday through Friday, 9:00am-8:00pm Saturday,
and no work shall be permitted on Sunday.
Proposed Hauling/Transportation Routes: East on S 21st Street, north on
Benson Drive S (SR-515) which connects to Interstate 405.
ESC Measures: The Erosion and Sedimentation Control Design elements as listed
in SECTION VIII of the Technical Information Report shall be implemented to
minimize dust, traffic and transportation impacts, erosion, mud, noise, and other
noxious characteristics during Site construction.
Special hours: No special hours proposed for construction at this time.
Preliminary Traffic Control Plan: See attached
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
MOUNTAIN VIEW GARDENS
2103 TALBOT ROAD S
RENTON, WASHINGTON 98055 MOUNTAIN VIEW GARDENSDRS PROJECT NO. 22052MOUNTAIN VIEW GARDENSAAANNNNNNNPRELIMINARY SHORT PLAT
GRAPHIC SCALE
0 20 40 80
1 INCH = 40 FT.
PRELIMINARY TRAFFIC CONTROL PLAN