Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_230825_v1 July 26, 2023 Project No. 22052 CITY OF RENTON CONSTRUCTION MITIGATION REPORT MOUNTAIN VIEW GARDE NS The following is a report of expected construction dates and times, as well as proposed hauling/transportation routes, ESC measures and traffic control plan. Proposed Construction Dates: Clearing, Grading, Utilities and Roads Summer 2024-Spring 2025 Hours and Days of Operation: Normal site hours of operation will be in compliance with the allowable working hours in the City of Renton which are as follows: For new single-family residences and non-residential construction, the permitted work hours are 7:00am-8:00pm Monday through Friday, 9:00am-8:00pm Saturday, and no work shall be permitted on Sunday. Proposed Hauling/Transportation Routes: East on S 21st Street, north on Benson Drive S (SR-515) which connects to Interstate 405. ESC Measures: The Erosion and Sedimentation Control Design elements as listed in SECTION VIII of the Technical Information Report shall be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics during Site construction. Special hours: No special hours proposed for construction at this time. Preliminary Traffic Control Plan: See attached IN COMPLIANCE WITH CITY OF RENTON STANDARDS MOUNTAIN VIEW GARDENS 2103 TALBOT ROAD S RENTON, WASHINGTON 98055 MOUNTAIN VIEW GARDENSDRS PROJECT NO. 22052MOUNTAIN VIEW GARDENSAAANNNNNNNPRELIMINARY SHORT PLAT GRAPHIC SCALE 0 20 40 80 1 INCH = 40 FT. PRELIMINARY TRAFFIC CONTROL PLAN