Loading...
HomeMy WebLinkAbout7945.04 E 2023 0822Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 4 Report ID 7945.04 E 2023 0822 Date Tue 8/22/2023 Weather 60 F Cloudy Arrival/Departure Time(s) 2:00 PM; 2:45 PM Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Miles Gori | 425 943 0010 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe sewer backfill and wall backfill. Sewer Backfill Observations: While on-site, ESNW rep observed had backfilled approximately 4-feet-deep sewer utilities. ESNW rep was not able to get density tests at this time due to a nearby excavation taking place at the same time. Contractor was observed excavating approximately 10-feet-deep to set storm utilities and had placed the excavated soil on the sewer utility. ESNW rep will return daily to observe sewer utility backfill. Wall Backfill Observations: While on-site, ESNW rep observed contractor setting an approximately 10-foot-tall wall on the east face of the site. ESNW rep observed contractor laying 1 ¼ inch diameter clean crushed rock behind the wall panels. ESNW rep will return daily to observe wall backfill. Report ID 7945.04 E 2023 0822 Page 2 of 4 Earth Solutions NW, LLC Report ID 7945.04 E 2023 0822 Page 3 of 4 Earth Solutions NW, LLC Report ID 7945.04 E 2023 0822 Page 4 of 4 Earth Solutions NW, LLC