N CONDITIONS OF APPROVAL
r 1. THE APPLICANT SHALL REVISE THE SHORT PLAT MAP AND RESOLVE THE ENCROACHMENT ISSUES WITH THE ADJACENT
(y PROPERTY OWNERS PRIOR TO FINAL SHORT PLAT APPLICATION. IF A TRANSFER OF LAND OCCURS BETWEEN THE
SUBJECT PARCEL AND ANY ADJACENT PROPERTY OWNERS, THE APPLICANT SHALL SUBMIT A NEW TITLE REPORT TO
I CONFIRM THE LEGAL DESCRIPTIONS OF THE INVOLVED PARCELS. THE FINAL SHORT PLAT MAP AND TITLE REPORT
O SHALL BE REVIEWED AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO SHORT PLAT
RECORDING.
0 2. THE APPLICANT SHALL OBTAIN A DEMOLITION PERMIT AND COMPLETE ALL REQUIRED INSPECTIONS FOR THE REMOVAL
OF THE EXISTING STRUCTURES ON THE SUBJECT PROPERTY PRIOR TO THE RECORDING OF THE SHORT PLAT.
w 3. THE APPLICANT SHALL PROVIDE A NOTE ON THE FINAL PLAT MAP INDICATING THE FRONT YARD FOR LOT 1 AND LOT
8 SHALL ABUT THE PROPOSED NEW STREET AND THE SECONDARY FRONT YARD FOR LOT 1 AND LOT 8 SHALL ABUT
ABERDEEN AVE NE. THE FRONT YARD NOTE DESIGNATION SHALL BE REVIEWED AND APPROVED BY THE CURRENT
PLANNING PROJECT MANAGER PRIOR TO SHORT PLAT RECORDING.
4. THE APPLICANT SHALL RECORD A NOTE ON THE FACE OF THE SHORT PLAT THAT EXECUTES A SHARED MAINTENANCE
AGREEMENT FOR EQUAL OWNERSHIP AND MAINTENANCE RESPONSIBILITIES FOR IMPROVEMENTS AND LANDSCAPING IN
TRACT A. A DRAFT VERSION OF A SHARED MAINTENANCE AGREEMENT OR HOMEOWNERS ASSOCIATION (HOA)
COVENANTS, CONDITIONS, AND RESTRICTIONS (CC&RS) MUST BE SUBMITTED FOR REVIEW AND APPROVAL BY THE
CURRENT PLANNING PROJECT MANAGER PRIOR TO SHORT PLAT RECORDING.
5. THE APPLICANT SHALL RETAIN A CERTIFIED ARBORIST TO ENSURE TREES ARE SUFFICIENTLY PROTECTED FROM
DEVELOPMENT ACTIVITIES. AN UPDATED ARBORIST REPORT SHALL BE SUBMITTED WITH THE CIVIL CONSTRUCTION
PERMIT APPLICATION THAT INCLUDES ANALYSIS REGARDING THE IMPACT OF DEVELOPMENT TO THE OFF -SITE TREES. IF
THE ARBORIST DEEMS THE CRITICAL ROOT ZONE (CRZ) OF THE TREES TO BE IMPACTED BY THE PROPOSED
RETAINING WALLS, THE APPLICANT SHALL UPDATE THE GRADING AND DRAINAGE PLAN TO DEMONSTRATE THAT THE
RETAINING WALLS HAVE BEEN MOVED OUT OF THE DRIPLINE OF ALL ADJACENT TREES. THE UPDATED GRADING AND
DRAINAGE PLAN SHALL BE REVIEWED AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER AT TIME OF
CIVIL CONSTRUCTION PERMIT APPLICATION. IF RETAINING WALLS ARE CONSTRUCTED WITHIN TREE DRIPLINES, A SURETY
DEVICE SHALL BE REQUIRED TO ENSURE SATISFACTORY TREE HEALTH FOR A MINIMUM OF FIVE (5) YEARS AFTER THE
RETAINING WALLS HAVE BEEN INSTALLED.
6. THE APPLICANT SHALL UPDATE THE FINAL LANDSCAPE PLAN TO RELOCATE THE STREET TREES ALONG ABERDEEN AVE
NE FROM LOTS 1 AND 8 INTO THE LANDSCAPE STRIP IN THE ROW. THE FINAL LANDSCAPE PLAN SHALL BE REVIEWED
AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO CIVIL CONSTRUCTION PERMIT APPROVAL.
7. THE APPLICANT SHALL SUBMIT A FINAL LANDSCAPE PLAN WITH THE CIVIL CONSTRUCTION PERMIT APPLICATION THAT
IDENTIFIES THE REPLACEMENT TREES MEETING THE REPLACEMENT REQUIREMENTS OF RMC 4-4-130 INCLUDING
CLEAR INDICATION OF THE TO 50-PERCENT CREDIT LIMITATION FOR THOSE TREES THAT ARE REQUIRED LANDSCAPING
AS INDICATED IN THE REPLACEMENT RATIO OF RMC 4-4-130H.1 E.I. THE FINAL LANDSCAPE PLAN SHALL BE REVIEWED
w AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO CIVIL CONSTRUCTION PERMIT APPROVAL.
8. THE APPLICANT SHALL SUBMIT A REVISED DRAINAGE AND GRADING PLAN WITH THE CIVIL CONSTRUCTION PERMIT
O APPLICATION THAT IDENTIFIES RETAINING WALLS COMPLIANT WITH THE SIZE REQUIREMENTS IN RMC 4-4-040C.3 OR
OBTAIN MODIFICATION APPROVAL TO REDUCE THE MINIMUM REQUIREMENTS. THE REVISED FINAL DRAINAGE AND
0 GRADING PLAN OR MODIFICATION SHALL BE REVIEWED AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER
PRIOR TO CIVIL CONSTRUCTION PERMIT APPROVAL.
9. THE APPLICANT SHALL PROVIDE A NOTE ON THE FINAL PLAT MAP INDICATING THE PRIMARY ENTRY OF THE HOMES
z ON LOT 1 AND LOT 8 SHALL BE ORIENTED TOWARD THE SECONDARY FRONT YARD ALONG ABERDEEN AVE NE.
ACCESS TO THE LOTS SHALL REMAIN VIA THE FRONT YARD ALONG THE NEW STREET. THE REVISED FINAL PLAT MAP
SHALL BE REVIEWED AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO SHORT PLAT
0 RECORDING.
10.THE APPLICANT SHALL RECORD A NOTE ON THE FACE OF THE SHORT PLAT RESTRICTING VEHICULAR ACCESS FOR
LOTS 1 AND 8 TO BE FROM THE NEW ROAD. FINAL SHORT PLAT MAP SHALL BE REVIEWED AND APPROVED BY THE
Q CURRENT PLANNING PROJECT MANAGER PRIOR TO CIVIL CONSTRUCTION PERMIT ISSUANCE.
11. THE APPLICANT SHALL OBTAIN MODIFICATION APPROVAL TO REDUCE THE MINIMUM STREET WIDTH REQUIREMENTS OR
SUBMIT A REVISED SHORT PLAT MAP WITH THE CIVIL CONSTRUCTION PERMIT APPLICATION THAT SHOWS A DEDICATION
OF
11.5 FEET OF STREET FRONTAGE. THE MODIFICATION OR FINAL SHORT PLAT MAP SHALL BE REVIEWED AND APPROVED BY
THE CURRENT PLANNING PROJECT MANAGER PRIOR TO CIVIL CONSTRUCTION PERMIT APPROVAL.
12. THE APPLICANT SHALL REVISE THE SHORT PLAT MAP TO INCLUDE PEDESTRIAN BULB -OUTS ALONG ABERDEEN AVE NE
AND ALONG THE SOUTH SIDE OF THE PROPOSED STREET. PARKING WILL BE PROHIBITED ON THE NORTH SIDE OF
THE PROPOSED STREET, SEE FOF 19: POLICE AND FIRE, THEREFORE A PEDESTRIAN BULB -OUT WILL NOT BE NEEDED
ON THE NORTH SIDE OF THE PROPOSED STREET. THE REVISED SHORT PLAT MAP SHALL BE REVIEWED AND
APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO CIVIL CONSTRUCTION PERMIT APPROVAL.
13. THE APPLICANT SHALL UPDATE THE SHORT PLAT MAP TO SHOW "NO PARKING - ANY TIME" SIGNAGE ON THE NORTH
SIDE OF THE DEAD-END STREET TO ENSURE ADEQUATE FIRE APPARATUS ACCESS IS PROVIDED TO THE HOMES. THE
FINAL SHORT PLAT MAP SHALL BE REVIEWED AND APPROVED BY THE CURRENT PLANNING PROJECT MANAGER PRIOR
TO CIVIL CONSTRUCTION PERMIT ISSUANCE.
14. THE APPLICANT SHALL SUBMIT A SAFE ROUTE TO SCHOOL ANALYSIS WITH THE CIVIL CONSTRUCTION PERMIT
APPLICATION THAT CONFIRMS THERE IS A SAFE WALKING ROUTE TO THE NEARBY SCHOOLS AND BUS STOPS. IF A
SAFE ROUTE TO SCHOOL CANNOT BE IDENTIFIED, THE STUDY SHALL OFFER RECOMMENDED IMPROVEMENTS THAT
WOULD FACILITATE A SAFE ROUTE. THE SAFE ROUTE TO SCHOOL ANALYSIS SHALL BE REVIEWED AND APPROVED BY
THE CURRENT PLANNING PROJECT MANAGER PRIOR TO CIVIL CONSTRUCTION PERMIT ISSUANCE.
15. THE APPLICANT SHALL REVISE THE TECHNICAL INFORMATION REPORT TO SHOW COMPLIANCE WITH SPECIAL
REQUIREMENT #6 OF THE SURFACE WATER DESIGN MANUAL. TREATMENT LINERS MAY BE REQUIRED FOR ALL
INFILTRATION FACILITIES (DRYWELLS AND PERMEABLE ROADWAY) LOCATED IN THE AQUIFER PROTECTION AREA, ZONE 2.
THE REVISED TECHNICAL INFORMATION REPORT SHALL BE REVIEWED AND APPROVED PRIOR TO CIVIL CONSTRUCTION
PERMIT ISSUANCE.
16. THE APPLICANT SHALL SUBMIT A FINAL LANDSCAPE PLAN THAT CLEARLY DEMONSTRATES THAT THE PROPOSED STORM
WATER IMPROVEMENTS WILL NOT DISPLACE THE REQUIRED STREET FRONTAGE LANDSCAPING OR INTERFERE WITH THE
CRITICAL ROOT ZONE (CRZ) OF ANY EXISTING OR PROSPECTIVE TREES NEEDED TO COMPLY WITH LANDSCAPING
REQUIREMENTS. IF ADEQUATE LANDSCAPING, AS DETERMINED BY THE CURRENT PLANNING PROJECT MANAGER, CANNOT
COMINGLE WITH THE PROPOSED STORMWATER IMPROVEMENTS ABUTTING THE LANDSCAPE STRIP, THEN THE APPLICANT
SHALL MODIFY AND/OR RELOCATE THE STORMWATER IMPROVEMENT TO ENSURE ADEQUATE STREET FRONTAGE
LANDSCAPING IS PROVIDED. THE FINAL LANDSCAPE PLAN SHALL BE REVIEWED AND APPROVED BY THE CURRENT
PLANNING PROJECT MANAGER PRIOR TO CIVIL CONSTRUCTION PERMIT APPROVAL.
GENERAL SITE DEVELOPMENT NOTES:
1. THE GENERAL CONTRACTOR SHALL OBTAIN AND HAVE AVAILABLE COPIES OF THE
AS-BUILTS CONDITIONS OF APPROVAL AND ROAD SECTIONS R/W
OF
I PAVEMENTBRENNON LANDING(VAUGHN TRUST PROPERTY) A PORTION OF SECTION 057 TOWNSHIP 23 N., RANGE 05 E., W.M.
SOILS REPORT NOTES CITY OF RENTON KING COUNTY WASHINGTON
1. THE FOLLOWING SOILS REPORT FOR THE > >
SITE SHALL BE CONSIDERED PART OF THESE
CONSTRUCTION DOCUMENTS:
SOILS REPORT: GEOTECHNICAL ENGINEERING STUDY
VAUGHN SHORT PLAT
PROJECT NUMBER: ES-7334
DATE: MARCH 16, 2021
PREPARED BY: EARTH SOLUTIONS NW, LLC R/W
15365 N.E. 90TH STREET
SUITE 100
REDMOND, WA 98052
(425) 449-4704
2. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO ENSURE THAT ALL
PROVISIONS OF THE SOILS REPORT FOR
THE SITE BE OBSERVED AND COMPLIED WITH
DURING ALL PHASES OF THE SITE
PREPARATION, GRADING OPERATIONS,
FOUNDATION, SLAB, AND PAVING
CONSTRUCTION.
3. ANY PROVISIONS OF THE SOILS REPORT
WHICH CONFLICT WITH INFORMATION SHOWN
ELSWHERE ON THESE DRAWINGS, OR WHICH
REQUIRE FURTHER CLARIFICATION, SHALL BE
BROUGHT TO THE ATTENTION OF THE CITY
AND ENGINEER FOR DETERMINATION.
4. A REPRESENTATIVE OF THE SOILS ENGINEER
SHALL BE AVAILABLE TO OBSERVE AND
APPROVE THE EARTHWORK OPERATIONS AND
TO VERIFY FIELD CONDITIONS AS WORK
PROCEEDS. THE SOILS ENGINEER SHALL
SUBMIT FIELD REPORTS CERTIFYING THAT
THE METHODS AND MATERIALS OF THE
EARTHWORK OPERATIONS WERE IN
ACCORDANCE WITH THE RECOMMENDATIONS
OF THE SOILS INVESTIGATION AND THAT THE
WORK WAS PERFORMED TO HIS/HER
SATISFACTION.
5. THE SOILS ENGINEER SHOULD BE NOTIFIED
AT LEAST FIVE (5) WORKING DAYS PRIOR TO
ANY SITE CLEARING OR GRADING.
6. SOILS PLACED IN STRUCTURAL AREAS
SHOULD BE PLACED IN LOOSE LIFTS OF 12
INCHES OR LESS AND COMPACTED TO A
RELATIVE COMPACTION OF 90 PERCENT,
BASED ON THE LABORATORY MAXIMUM DRY
DENSITY AS DETERMINED BY THE MODIFIED
PROCTOR METHOD (ASTM D-1557). FOR
SOIL PLACED IN UTILITY TRENCHES
UNDERLYING STRUCTURAL AREAS,
COMPACTION REQUIREMENTS ARE DICTATED
BY THE LOCAL CITY, COUNTY, OR UTILITY
DISTRICT, AND IN GENERAL ARE SPECIFIED
AS 95 PERCENT RELATIVE COMPACTION.
STRUCTURAL FILL PLACED WITHIN THE
UPPER 12 INCHES OF SLAB -ON -GRADE
AND PAVEMENT SUBGRADE AREAS SHOULD
BE COMPACTED TO A RELATIVE COMPACTION
OF AT LEAST 95 PERCENT.
FIRE SPRINKLER NOTE
ALL LOTS TO BE EQUIPPED WITH
AUTOMATIC FIRE SPRINKLERS
5'-7'f
I �
3
U)
I
EXISTING
GROUND
q R/W
30' EX R/W
30' EX R/W
4:
R/W
L VRIIVV P114V VVLRLMI
Li
Z
J
Z) J
0
ao
VARIES
30' EX
16'
NEW 10-11' PAVEMENT
I
VARIES
R/W
I
I
30' EX
16'
NEW 10-11' PAVEMENT
R/W
I
I
O
2.0%
4:
Z-ffiP11��11�1ITi=11l=111 III�MqXOI�_� -r;=1II-II ; 4" THICK CEMENT
6" COMPACTED DEPTH HMA CLASS B ASPHALT CONCRETE SIDEWALK WITH N
4 CRUSHED ROCK BASE
1 1/2" COMPACTED DEPTH TOP COURSE V
4 1/2" BASE COURSE
COMPACTED SUBGRADE, FREE OF FINE GRAINED OR ORGANIC SOILS V
ABERDEEN AVE NE
FRONTAGE ROADWAY SECTION STA 30+82 - 31 +51
NOT TO SCALE
4" THICK CEMENT
6" COMPACTED DEPTH HMA CLASS B ASPHALT CONCRETE SIDEWALK WITH
1 1/2" COMPACTED DEPTH TOP COURSE 4 CRUSHED ROCK BASE
4 1/2" BASE COURSE
COMPACTED SUBGRADE, FREE OF FINE GRAINED OR ORGANIC SOILS
ABERDEEN AVE NE
FRONTAGE ROADWAY SECTION STA 28+24 - 30+82
NOT TO SCALE
5' 8'
WALK PLANTER
15%
R/W
i 1'-5' GRAVEL 1
EX 11'-18' PAVEMENT WALKWAY
9'-12' 6'
MATCH 1
APPLICABLE GOVERNING AGENCY STANDARDS AT THE JOB SITE DURING THE RELATED
7. PRIOR TO ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY THE CONTRACTOR SHALL
z
L`I
EG EXISTING
CONSTRUCTION OPERATIONS.
CONTACT THE AGENCY AND/OR UTILITY INSPECTION PERSONNEL AND ARRANGE ANY
J
0
GROUND
REQUIRED PRE -CONSTRUCTION MEETING(S). CONTRACTOR SHALL PROVIDE 72 HRS MIN.
VARIES
w
2. GENERAL CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN
_
ADVANCE NOTIFICATION TO OWNER, FIELD ENGINEER AND ENGINEER OF _
_ _
_
- - - - - - - -
OBTAINED PRIOR TO COMMENCING WORK.
PRE -CONSTRUCTION MEETINGS.
_
------__=-=
1' BLOCK HIGH
3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR WORKER AND SITE SAFETY AND
KEYSTONE WALL
DIMENSION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION WHETHER
SHALL COMPLY WITH THE LATEST OSHA STANDARDS AND REGULATIONS, OR ANY OTHER
2�� TOP COARSE
SHOWN ON THESE PLANS OR NOT. UTILITIES OTHER THAN THOSE SHOWN MAY EXIST
AGENCY HAVING JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE
NE 16TH ST
4" BASE COARSE
ON THIS SITE. ONLY THOSE UTILITIES WITH EVIDENCE OF THEIR INSTALLATION VISIBLE
CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE MEANS AND METHODS'
AT GROUND SURFACE OR SHOWN ON RECORD DRAWING PROVIDED BY OTHERS ARE
REQUIRED TO MEET THE INTENT AND PERFORMANCE CRITERIA OF OSHA, AS WELL AS
OFFSITE ROADWAY
SECTION
SHOWN HEREON. EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE
ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING
STA 40+31 - 41+30
APPROXIMATE ONLY AND ARE SUBJECT TO A DEGREE OF UNKNOWN VARIATION. SOME PROCEDURES.
UNDERGROUND LOCATIONS SHOWN HEREON MAY HAVE BEEN TAKEN FROM PUBLIC
RECORDS. BARGHAUSEN CONSULTING ENGINEERS, INC. ASSUMES NO LIABILITY FOR THE 9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE
ACCURACY OF PUBLIC RECORDS OR RECORDS OF OTHERS. IF CONFLICTS SHOULD SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER q R/W
OCCUR, THE CONTRACTOR SHALL CONSULT THE CITY AND BARGHAUSEN CONSULTING NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND
ENGINEERS, INC., TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED
CONSTRUCTION. BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY
INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH 1
4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS LANE OF TRAFFIC AFFECTED.
AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE
INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE
NOT TO SCALE
R/W
30' EX R/W
V-5' GRAVEL 1
EX 11'-18' PAVEMENT WALKWAY,
9'-12'
DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE CODES, IT IS THE
10. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ALL 1
Lv
-
-
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN
ADJACENT PUBLIC AND PRIVATE PROPERTIES AT ALL TIMES DURING CONSTRUCTION.
z
J
w
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING UTILITY
=
c�
NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL
SERVICES THAT ARE TO REMAIN OPERATIONAL WITHIN THE CONSTRUCTION AREA
�'
ow
¢
00
�
�
RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED
WHETHER SHOWN OR NOT SHOWN ON THE PLANS. -
VARIES
- - - - - ��
1.5%
BY THE DRAWINGS AND IN FULL COMPLIANCE WITH LOCAL REGULATIONS AND CODES.
11. TWO (2) COPIES OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
5. IT SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE
CONSTRUCTION IS IN PROGRESS. ONE (1) SET WITH RECORDS OF AS -BUILT
APPROPRIATE UTILITIES INVOLVED PRIOR TO CONSTRUCTION.
INFORMATION SHALL BE SUBMITTED TO BARGHAUSEN CONSULTING ENGINEERS, INC. AT
2" TOP
COARSE
COMPLETION OF PROJECT.
NE 16TH ST
4" BASE
COARSE
6 INSPECTION OF SITE WORK BE BY A OF THE
GOVERNING JURISDICTION. INSPLL
ECTION OF PRIVATEDFACILTIES WILLEBEATIVE
ACCOMP ACCOMPLISHED
12. GENERAL CONTRACTOR SHALL OBTAIN SERVICES OF A LICENSED LAND SURVEYOR TO
OFFSITE ROADWAY
SECTION
STAKE HORIZONTAL CONTROL FOR ALL NEW IMPROVEMENTS. STAKING CONTROL SHALL
STA 41+30 - 43+83
BY A REPRESENTATIVE OF THE OWNER. IT SHALL BE THE CONTRACTORS BE TAKEN FROM ELECTRONIC PLAN FILES PROVIDED BY BCE.
RESPONSIBILITY TO NOTIFY THE INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING
ALL CONSTRUCTION.
1 RECORD DRAWINGS AS BUILT
2 REVISION PER COMMENTS DATED
DATUM FBENCHMARK„ FOUND BRASS DOME IN MONUMENT IN MONUMENT IN CASE MARK I ,BRASS
C WITH XAT DISC
16TH ST.
HORIZONTAL DATUM: VERTICAL DATUM: CASE WITH 'T 0.65' BELOW GRADE OBSERVED (NAD 83/11) 0.6' BELOW GRADE OBSERVED (NAD 83/11) N0. REVISION
NAD '83/'91 NAVD '88 N: 186463.16, E: 1304865.21 N: 187664.64, E: 1304879.99
NOT TO SCALE
RK
5/4/22
BJT
SURVEYED.
RK
7/7/23
BJT
DEM .
RK
DRAWN. RK
cHE BJT
BY
DATE
APPR
wP� BJT
SCALE:
N/A
ONE INCH
AT FULL SCALE
IF NOT ONE IN
SCALE ACCORDINGLY
R/W
26.5' R/W 26.5' R
.�h w YS v
4115I �i/1 7. �. �
��S..�S.���.,�/S.��S��.�/rS�%'T��S�S.��S.�/S.��S.,�/S.�
L�•,� nh:r,
1
NOT TO SCALE
VERnaa_ NAw I
HORRNU OLNAD : 1983 1991
DATU M
q R/W
30' EX
8'
PLANTER
4" THICK CEMENT
CONCRETE SIDEWALK WITH
4" CRUSHED ROCK BASE
CONSTRUCTION RECORD
(c)
DRAWING
c'
THIS CONSTRUCTION RECORD DRAWING IS A COPY
0
OF THE APPROVED CONSTRUCTION DRAWINGS
0
PREPARED BY BARGHAUSEN CONSULTING
0
ENGINEERS, INC AND HAS BEEN EDITED TO
I
REFLECT ASBUILT CONDITIONS. THE INFORMATION
PROVIDED ON THESE RECORD DRAWINGS IS A
N
COMBINATION OF THE FIELD SURVEYED INFORMATION
AND DOCUMENTED FIELD REVISIONS.
Q
J
w
Z
5 J
WALK
1
R/W
EX 11.5' PAVEMENT NEW 6' PAVEMENT 5.5' 0. 5' 1
WALK Z
J 6»
EX MATCH 1
CURB EG
- - - - VAS - N MATCH
EG f 1'S% MFX
'1 M,ak
i l_il 4 THICK CEMENT
CONCRETE SIDEWALK WITH
4" CRUSHED ROCK BASE
6" COMPACTED DEPTH HMA CLASS B ASPHALT
1 1/2" COMPACTED DEPTH TOP COURSE
4 1/2" BASE COURSE
NE 16TH ST COMPACTED SUBGRADE, FREE OF FINE GRAINED OR ORGANIC SOILS
OFFSITE ROADWAY SECTION STA 51+29 - 51+64
NOT TO SCALE
CALL BEFORE YOU DIG:
1-800-424-5555
AoRtIL
CITY OF
RENTON
Planning/Building/Public Works Dept.
ON Sf
WAS
ti O
o
�20100 41�
FSS T DNA L
7/7/202-3
V
i
O
v
..
C
4)
. E
O
�
(0
C
W
c
O
N
M
<
co N
m
�aP
0)
tn
L\
Lr)
W
V
r
Y
R-421202
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
AS-BUILTS CONDITIONS OF
APPROVAL AND ROAD SECTIONS
VAUGHN PROPERTY
MAINVUE WA, LLC
121 3RD AVENUE
KIRKLAND, WA 98033
I
H
H
I..LI
OM
T
� N
z%0
DATE: `
7/7/2023 m
FlELDB001C 0
PAGE: a
DRAWING NO:
J uLi
SET: ^ U
HE
L L}V m