FIELD REPORT
Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0911
Date Mon 9/11/2023 Weather 70°F Clear
Arrival/Departure Time(s) 9AM; 9:30AM Travel Time (hr)1.0
Project Name Canopy Property
Location 413 Lincoln Ave NE, Renton
ESNW Rep. & Phone Willem Scherwin | 206 793 8569
Client Info/Contact Century Communities | Stacia Bloom
General Contractor Info/Contact
Contractor #2 Info/Contact
Reviewed By LAC
Initials/Date
RAC
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was onsite to observe and test water main backfill.
Water Main Backfill
Upon arrival, ESNW rep observed the contractor had excavated approximately 4’ into native tan sandy
silt with gravel to place water main. ESNW rep observed the contractor had bedded the water main with
coarse sand and backfilled in lifts with native structural soil. The soil was compacted with a hoe pack.
ESNW rep took compaction tests and observed adequate compaction of at least 95% of the modified
proctor at the tested locations. Please see map and table below.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
192 Water Main Backfill SG 9 128.5 10.5 121.7 95
193 Water Main Backfill SG 9 128.5 10.8 123.2 96
Report ID 7945.04 E 2023 0911 Page 2 of 3
Earth Solutions NW, LLC
Report ID 7945.04 E 2023 0911 Page 3 of 3
Earth Solutions NW, LLC
192
193