Loading...
HomeMy WebLinkAbout2022-7-27_502405722-EV Charger Renton.pdf4411 4601ANACORTES AVE NE318691-167264 750 kVA 277/480V (ABC) 45 kVA 208V (ABC) 318700-167266 PARKING LOT 4601 CUSTOMER OWNED, INSTALLED & MAINTAINED 4-RUNS OF 600MCM SVC CABLE PRE 14 NE SU N S E T B L V D R/W 60' 318666-167249 150 kVA 208V (ABC) 318659-167248 50 kVA (A)318659-167275 318659-167249 PSE INST.1-4" SCHL 80 CONTINUOUS PVC CONDUIT ±370' IN CUST. PROVIDED TRENCH PSE INST. 1-RUN 3Ø PRI. 12KV1/0 UG JKT CABLE ±390' (AØEIV689) (BØEIV690) (CØEIV691) CUST. PROVIDED 4' X 4' WORKPIT CUST. PROVIDED 11' X 11' WORKPIT W/ 6" BEDDING OF CRUSH ROCK ±310'90° R=60"±360' CUST. SUPPLIED 1 CU. YD. OF 5/8 MINUS GRAVEL SITE PLAN N Vicinity Map 47.504594, -122.159065 Owner / Developer Contact Info officeATTN: EVgo Service LLC 11835 W. Olympic Blvd Los Angeles, CA. 90064 Gerald Cabrera 925-639-4505 UNDERGROUND MAP SCALE 1"=50' CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-14 3/8/2022 429 441 413 58.77 58.77 58.77 487.77 499.77 471.77 Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Jenny Chau 253-208-9480 jenny.chau@pse.com SCALE: 1" = 50'105100809THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 105100809 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Jenny Chau 253-208-9480 2/28/2022 Ray Reynolds 253-262-7409 2/28/2022 N/A N/A N/A Ray Reynolds -2/28/2022 RW-126843 RENTON RENTON EV CHARGER 3Ø LINE EXTENSION, 3Ø XFMR INSTALL 4601 NE SUNSET BLVD. RENTON, WA. 98059 N/A N/A N/A 105100809 AS NOTED 1 OF 2 KING N/A N/A CSPSKEPM SW-3 -23-5 N/A N/A 2305E011 2305E040 2305E011 PRE-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 502405722 Perm. Service Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy Standards & Local Municipality (See PSE Electric Service Handbook for more details). 1.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 2.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 3.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 4.Roads shall be paved or have a compacted , crushed rock base in place. 5.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 6. All work is to be done in accordance with local municipal and county permit requirements as applicable. 7.Inclement weather conditions may cause delays in construction times and dates. 8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 9.EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice 0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction requirements. (Local jurisdiction may have additional requirements including notes detailing where erosion or sediment control structures are to be installed, cross section details of the typical erosion structures, & special requirements for work in sensitive areas.) 10.Customer is required to have meter inspected and approved by L&I/City prior to construction. Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 750kVA 277/480v 6259300 V01 318691-167264 104346459513072489 PSE Locates Req'd Developer Locates Req'd Yes No Yes YesFlagging Req'd Outages Req'd POWER GENERAL NOTES - COMMERCIAL PROJECT All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 1. 2. SITE SPECIFIC NOTES J01 EXISTING 3187659-167266: - EXISTING VAULT TO REMAIN - REMOVE EXISTING (3) 3-POS J-BOX - INSTALL NEW (3) 4-POS J-BOX(MID: 7625900) - INSTALL (3) L/B ELBOW ELB10J, 6041.1000 V01 GRID# 318691-167264 NEW: - INSTALL 7' X 7' X 4' VAULT w/ 60" x 24" ACCESS / 8' SQ COVER PM3P15M, 6045.5000 - SET 750KVA, 277/480V PM XFMR (MID: 6259300) - INSTALL (3) L/B ELBOWS ELB10J, 6041.1000 - INSTALL (4) SECONDARY CONNECTOR BARS (MID:7651003 ) - INSTALL (12) BOLT KITS (MID:7651008) - CUSTOMER TO OWNED, INSTALLED, AND MAINTAINED 4 - RUNS OF 600MCM CABLE - INSTALL GRID # M01 INSTALL NEW METER AT 1600A METERBASE SPAN SPECIFIC NOTES SEE SITE PLAN, TABLES, AND ONE-LINES FOR INSTALL OVERHEAD CIRCUIT MAP SCALE: 6" = 1Mi CUSTOMER NOTES FAULT CURRENT TABLE 3Ø PM TRANSFORMERS (480Y/277V) 277V WINDINGS 480V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V02 750KVA 0.1 --5.30 17,000 AMPS LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A 1600A N/A 797 65 4.6% 0.4% CIRCUIT FEET ADDED: 150' 00 1"2" 00 50'100' CONDUIT & CABLE ONE-LINE Vault & Equipment Table Work Location Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-Complete LB DC V01 318691-167264 PM3P15M (7'x7'x4')PAD-3P-12-277/480- 750 (750 kVA)3 JOB SITE JOB SITE JOB SITE CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -PROVIDE A 11' X 11' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT V01. -PROVIDE A 4' X 4' WORK PIT AT J01. TRENCHING & CONDUIT. -INSTALL ±370' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM V01 TO M01 . -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . Primary Cable & Conduit Table (Foreman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY Check applicable box DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed (Conduit & Cable) J01 V01 4"1 370'X 1 0 0 0 369 544.2 PRI 12KV 1/0 UG 390'EIV689 EIV690 EIV691 SCALE: NTS UG Misc 594150455 Meter Set 513072571 3001942781 105100809Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. PRIMARY TRENCH DETAIL FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. GUARD POST INSTALLATION NOT TO SCALE 0700.1600-02 CONCRETE GUARD POST INSTALLATION MIN 6" PAINTED YELLOW MIN 2'-6" 6" 3'-6" 6'-0" LENGTH DEVELOPER NOTE: Developer to install bollards per this detail if transformers cannot be placed a minimum of 5' from drivable surfaces. GUARD POST LOCATIONS 10' MIN. REQUIRED ROAD OR PARKING AREA GUARD POSTS 5' MIN WORK SPACE 5' MAX 5' MAX 5' MAX 5' MIN 5' MIN CURB OR EDGE OF PAVEMENT CURB OR EDGEOF PAVEMENTPAD & FRONT GUARD XFMR 3' MIN TYPICAL MIN 18"18" MIN MIN 3' CUSTOMER ENTRY LOCATION PSE ENTRY LOCATION BUTTERFLY DETAIL AT J02 Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL Not to scale UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Jenny Chau 253-208-9480 2/28/2022 Ray Reynolds 253-262-7409 2/28/2022 N/A N/A N/A Ray Reynolds -2/28/2022 RW-_____RENTON RENTON EV CHARGER 3Ø LINE EXTENSION, 3Ø XFMR INSTALL 4601 NE SUNSET BLVD. RENTON, WA. 98059 N/A N/A N/A 105100809 AS NOTED 2 OF 2 KING N/A N/A CSPSKEPM SW-3 -23-5 N/A N/A 2305E011 2305E040 2305E011 PRE-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2" Excavation - 20 cubic yards 8'-0" or 10'-0" 7'-0" 8'-0"8" 4'-2" SIDE VIEW 4'-6"Crushed 6" Rock 11' 11' TOP VIEW 3'-6" 7'-0" 6045.5000Not to scale VAULT & EXCAVATION DETAIL PM XFMR VAULT B-FLY DETAIL (V01) SCALE: NONE Customer Owned Services Prop 4" (J01) Prop 4" (J02) Prop 4" Exist Used 4" Legend Exist 4" Exist 4"Exist 4" Prop 4" Legend