HomeMy WebLinkAbout2022-7-27_502405722-EV Charger Renton.pdf4411
4601ANACORTES AVE NE318691-167264
750 kVA 277/480V (ABC)
45 kVA 208V (ABC)
318700-167266
PARKING LOT
4601
CUSTOMER OWNED, INSTALLED &
MAINTAINED 4-RUNS OF 600MCM SVC CABLE
PRE
14
NE SU
N
S
E
T
B
L
V
D
R/W 60'
318666-167249
150 kVA 208V (ABC)
318659-167248
50 kVA (A)318659-167275
318659-167249
PSE INST.1-4" SCHL 80 CONTINUOUS PVC
CONDUIT ±370' IN CUST. PROVIDED TRENCH
PSE INST. 1-RUN 3Ø PRI. 12KV1/0 UG JKT
CABLE ±390'
(AØEIV689)
(BØEIV690)
(CØEIV691)
CUST. PROVIDED
4' X 4' WORKPIT
CUST. PROVIDED 11' X 11' WORKPIT
W/ 6" BEDDING OF CRUSH ROCK
±310'90°
R=60"±360'
CUST. SUPPLIED
1 CU. YD. OF 5/8 MINUS GRAVEL
SITE PLAN
N
Vicinity Map
47.504594, -122.159065
Owner / Developer Contact Info
officeATTN:
EVgo Service LLC
11835 W. Olympic Blvd
Los Angeles, CA. 90064
Gerald Cabrera 925-639-4505
UNDERGROUND MAP
SCALE 1"=50'
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
3/8/2022
429 441 413
58.77 58.77 58.77
487.77 499.77 471.77
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Jenny Chau
253-208-9480
jenny.chau@pse.com
SCALE: 1" = 50'105100809THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
105100809
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 2/28/2022
Ray Reynolds 253-262-7409 2/28/2022
N/A N/A N/A
Ray Reynolds -2/28/2022
RW-126843 RENTON
RENTON EV CHARGER
3Ø LINE EXTENSION, 3Ø XFMR INSTALL
4601 NE SUNSET BLVD. RENTON, WA. 98059
N/A N/A
N/A 105100809
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
SW-3 -23-5 N/A N/A
2305E011 2305E040 2305E011 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
502405722
Perm. Service
Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy
Standards & Local Municipality (See PSE Electric Service Handbook for more details).
1.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to
commencing work to get the underground facilities located.
2.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole,
sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the
Project Manager.
3.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or
construction materials which would restrict construction and/or equipment access, before work can begin.
4.Roads shall be paved or have a compacted , crushed rock base in place.
5.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or
guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away
from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when
crossing them.
6. All work is to be done in accordance with local municipal and county permit requirements as applicable.
7.Inclement weather conditions may cause delays in construction times and dates.
8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The
customer will provide any and all shoring or they will side slope the trench to 1:1.
9.EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice
0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction
requirements. (Local jurisdiction may have additional requirements including notes detailing where
erosion or sediment control structures are to be installed, cross section details of the typical erosion
structures, & special requirements for work in sensitive areas.)
10.Customer is required to have meter inspected and approved by L&I/City prior to construction.
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
750kVA 277/480v
6259300
V01
318691-167264
104346459513072489
PSE Locates Req'd
Developer Locates Req'd Yes
No
Yes
YesFlagging Req'd
Outages Req'd
POWER GENERAL NOTES - COMMERCIAL PROJECT
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
1.
2.
SITE SPECIFIC NOTES
J01 EXISTING 3187659-167266:
- EXISTING VAULT TO REMAIN
- REMOVE EXISTING (3) 3-POS J-BOX
- INSTALL NEW (3) 4-POS J-BOX(MID: 7625900)
- INSTALL (3) L/B ELBOW ELB10J, 6041.1000
V01 GRID# 318691-167264 NEW:
- INSTALL 7' X 7' X 4' VAULT w/ 60" x 24" ACCESS / 8' SQ COVER PM3P15M, 6045.5000
- SET 750KVA, 277/480V PM XFMR (MID: 6259300)
- INSTALL (3) L/B ELBOWS ELB10J, 6041.1000
- INSTALL (4) SECONDARY CONNECTOR BARS (MID:7651003 )
- INSTALL (12) BOLT KITS (MID:7651008)
- CUSTOMER TO OWNED, INSTALLED, AND MAINTAINED 4 - RUNS OF 600MCM CABLE
- INSTALL GRID #
M01
INSTALL NEW METER AT 1600A METERBASE
SPAN SPECIFIC NOTES
SEE SITE PLAN, TABLES, AND ONE-LINES FOR INSTALL
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1Mi
CUSTOMER NOTES
FAULT CURRENT TABLE
3Ø PM TRANSFORMERS (480Y/277V)
277V WINDINGS 480V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V02 750KVA 0.1 --5.30 17,000 AMPS
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
N/A
1600A
N/A
797
65
4.6%
0.4%
CIRCUIT FEET ADDED: 150'
00 1"2"
00 50'100'
CONDUIT & CABLE ONE-LINE
Vault & Equipment Table
Work
Location
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-Complete
LB DC
V01 318691-167264 PM3P15M (7'x7'x4')PAD-3P-12-277/480-
750 (750 kVA)3 JOB SITE
JOB SITE
JOB SITE
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-PROVIDE A 11' X 11' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT V01.
-PROVIDE A 4' X 4' WORK PIT AT J01.
TRENCHING & CONDUIT.
-INSTALL ±370' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM V01 TO M01 .
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE (gal.)AS BUILT INFORMATION
From To Size
(in)
Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev
(lbs)
Cable
Size
Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY
Check applicable box
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed
(Conduit & Cable)
J01 V01 4"1 370'X 1 0 0 0 369 544.2
PRI
12KV
1/0 UG
390'EIV689 EIV690 EIV691
SCALE: NTS
UG Misc 594150455
Meter Set 513072571 3001942781
105100809Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
PRIMARY TRENCH DETAIL
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
The following styles of guard posts are approved for Puget Sound Energy transformers:
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a minimum compressive strength of 3000 psi after 28 days.
The exposed portion of the post shall be painted traffic yellow.
- 6 ft x 9 in. diameter precast steel-reinforced concrete post.
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
GUARD POST INSTALLATION
NOT TO SCALE 0700.1600-02
CONCRETE
GUARD POST INSTALLATION
MIN
6"
PAINTED
YELLOW
MIN
2'-6"
6"
3'-6"
6'-0"
LENGTH
DEVELOPER NOTE:
Developer to install bollards per this detail if transformers
cannot be placed a minimum of 5' from drivable surfaces.
GUARD POST LOCATIONS
10' MIN. REQUIRED
ROAD OR PARKING AREA
GUARD
POSTS
5'
MIN
WORK SPACE
5'
MAX
5'
MAX
5'
MAX
5'
MIN
5'
MIN
CURB OR EDGE
OF PAVEMENT
CURB OR EDGEOF PAVEMENTPAD &
FRONT
GUARD
XFMR
3' MIN
TYPICAL
MIN
18"18"
MIN
MIN
3'
CUSTOMER ENTRY LOCATION
PSE ENTRY LOCATION
BUTTERFLY DETAIL AT J02
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
J- BOX CABLE ENTRY DETAIL
Not to scale
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 2/28/2022
Ray Reynolds 253-262-7409 2/28/2022
N/A N/A N/A
Ray Reynolds -2/28/2022
RW-_____RENTON
RENTON EV CHARGER
3Ø LINE EXTENSION, 3Ø XFMR INSTALL
4601 NE SUNSET BLVD. RENTON, WA. 98059
N/A N/A
N/A 105100809
AS NOTED 2 OF 2
KING N/A N/A CSPSKEPM
SW-3 -23-5 N/A N/A
2305E011 2305E040 2305E011 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
2"
Excavation - 20 cubic yards
8'-0"
or 10'-0"
7'-0"
8'-0"8"
4'-2"
SIDE VIEW
4'-6"Crushed
6"
Rock
11'
11'
TOP VIEW
3'-6"
7'-0"
6045.5000Not to scale
VAULT & EXCAVATION DETAIL
PM XFMR VAULT B-FLY DETAIL (V01)
SCALE: NONE
Customer Owned Services
Prop 4" (J01)
Prop 4" (J02)
Prop 4"
Exist Used 4"
Legend
Exist 4"
Exist 4"Exist 4"
Prop 4"
Legend