HomeMy WebLinkAboutNOA-LUA23-000321-20230920DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED DETERMINATION OF
NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic Development
(CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary
Public Approvals.
DATE OF NOTICE OF APPLICATION September 20, 2023
PROJECT NAME/NUMBER: PR21-000432 LEW SFR Addition/Remodel, Lew
Boatlift LUA23-000321, ECF, SM
PROJECT LOCATION: 3101 Mountain View Ave N Renton, WA 98056-
2514 (APN 3342103895)
APPLICANT/PROJECT CONTACT
PERSON:
Zion Napier, Seaborn Pile Driving/ 206-236-1700/
permits@seabornpiledriving.com/1080 W Ewing Pl
#300, Seattle, WA 98119
LOCATION WHERE APPLICATION
MAY BE REVIEWED:
Applicant documents are available online through the City of Renton Document
Center website. See also https://rb.gy/zt04j
PROJECT DESCRIPTION: The applicant is requesting a Shoreline Substantial Development Permit (SM)
and Environmental (SEPA) Review for the installation of a new boat lift for the property owners of 3101 Mountain View
Ave N on an existing dock. The project site and adjacent properties are zoned as R-8. The site is on the shoreline of Lake
Washington (Reach E) within the Shoreline Residential and Aquatic designations. The proposed boat lift would be located
approximately 144’ waterward of the ordinary high-water mark on the south side of the dock. The boat lift would be 12’-
2” wide by 15’-11” long. The bunk of the boat lift would extend 18” above the ordinary high-water mark and the lift will
sit on the lake bed of Lake Washington on foot pads. No dredging, fill, or excavation would be done for the project.
DATE OF APPLICATION: September 19, 2023
NOTICE OF COMPLETE
APPLICATION:
September 20, 2023
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that
significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the
RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued.
Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no
comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only
opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance
of the DNS.
PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit
OTHER PERMITS WHICH MAY BE
REQUIRED:
Letter of Permission from the U.S Army Corps of Engineers and Hydraulic Project
Approval (HPA) from the Washington State Department of Fish and Wildlife (WDFW)
REQUESTED STUDIES: Lake Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Residential Medium Density (RMD) on the City of
Renton Comprehensive Land Use Map and Residential-8 (R-8) on the City’s Zoning
Map.
Environmental Documents
that Evaluate the Proposed
Project:
Environmental (SEPA) Checklist
Development Regulations
Used For Project Mitigation:
The project will be subject to the City’s SEPA ordinance, Shoreline Master Program
(RMC 4-3-090) and other applicable codes and regulations as appropriate.
NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR21-000432 LEW SFR Addition/Remodel, LUA23-000321, ECF, SM
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
Proposed Mitigation
Measures:
No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on October 20, 2023. Per RMC 4-9-
190.E.6, a thirty (30) day public comment is required for all Shoreline Development Permit applications. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton,
CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA)
or project address in your comments. Anyone who submits written comments will automatically become a party of
record and will be notified of any decision on this project.
CONTACT PROJECT PLANNER: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov