STRUCTURAL STEEL OBSERVATIONS REPORT
Report Number:M7221137.0006
Service Date:11/29/22 20225 Cedar Valley Rd Ste 110
Report Date:11/29/22 Lynnwood, WA 98036-6365
425-742-9360
Client Project
City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T)
Attn: Alan J. Wyatt 1201 Lake Washington Blvd N
1055 S Grady Way Renton, WA
Renton, WA 98057-3232
Project Number: M7221137
Services: Special Inspections / Materials Testing
Mayes/Terracon Rep.: Thomas Cain
Reported To:Aaron, American Construction
Contractor:American Construction
Report Distribution:
(1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, John
Blair(1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________
(1) WSP USA Inc, Garth Nelson, P.E. Dennis Sanborn
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
DM027, 04-29-22 Rev.5 Page 1 of 1
General Information
City of Renton requested Terracon be on site for the following services: Welding Observation. Structural steel is being constructed by American Construction. The results of observation(s) for today were reported to Aaron, American Construction . The Terracon representative arrived on site at 1000 and departed at 0000.
The construction documents referenced for this observation include: The structural plans, Revision 1. Permit No. C21005257
Welding Observation
Welding was performed prior to Terracon’s arrival. Welding procedures have been reviewed. Welder qualifications have been reviewed.
Inspection Type Elevation/Location Connection Type Type of Weld Referenced Documents Applicable Code Compliance Status*
Final (1) At tops of piles, North abutment weld corrections and three piles at south
abutment
#8 A706 headed rebar dowels welded to inside of piles
Flare-Bevel 2/S-9 AWS D1.4 Complies
* See below for details
Additional Comments
North abutment weld corrections from inspection on 9-28-22 M7221137 (D. Candelaria)
Compliance Statement
Based on our observations, structural steel construction activities at the above-referenced locations appeared to be completed in general
accordance with the project plans and specifications.
DRA
F
T
Photo Log
Report Number:M7221137.0006
Service Date:11/29/22 20225 Cedar Valley Rd Ste 110
Report Date:11/29/22 Lynnwood, WA 98036-6365
425-742-9360
City of Renton WAAttn: Alan J. Wyatt
CT0001, 10-16-13, Rev.10 Page 1 of 1
(P1) Headed rebar dowel welds
DRA
F
T
STRUCTURAL STEEL OBSERVATIONS REPORT
Report Number:M7221137.0006
Service Date:11/29/22 20225 Cedar Valley Rd Ste 110
Report Date:11/29/22 Lynnwood, WA 98036-6365
425-742-9360
Client Project
City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T)
Attn: Alan J. Wyatt 1201 Lake Washington Blvd N
1055 S Grady Way Renton, WA
Renton, WA 98057-3232
Project Number: M7221137
Services: Special Inspections / Materials Testing
Mayes/Terracon Rep.: Thomas Cain
Reported To:Aaron, American Construction
Contractor:American Construction
Report Distribution:
(1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, John Blair(1) Mayes Testing Engineers, Inc,
Belinda Rix
(1) Mayes Testing Engineers, Inc, Jim
Kay Reviewed By:__________________________________
__(1) WSP USA Inc, Garth Nelson, P.E. Dennis Sanborn
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.CT0001, 10-16-13, Rev.10 Page 1 of 1
Permit No.:
GENERAL INFORMATION
COMPLIANCE STATEMENT
Choose a compliance statement