Loading...
HomeMy WebLinkAbout11-29-22 Coulon Park Bridge rebar weldsDRA F T STRUCTURAL STEEL OBSERVATIONS REPORT Report Number:M7221137.0006 Service Date:11/29/22 20225 Cedar Valley Rd Ste 110 Report Date:11/29/22 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Thomas Cain Reported To:Aaron, American Construction Contractor:American Construction Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, John Blair(1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________ (1) WSP USA Inc, Garth Nelson, P.E. Dennis Sanborn Senior Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM027, 04-29-22 Rev.5 Page 1 of 1 General Information City of Renton requested Terracon be on site for the following services: Welding Observation. Structural steel is being constructed by American Construction. The results of observation(s) for today were reported to Aaron, American Construction . The Terracon representative arrived on site at 1000 and departed at 0000. The construction documents referenced for this observation include: The structural plans, Revision 1. Permit No. C21005257 Welding Observation Welding was performed prior to Terracon’s arrival. Welding procedures have been reviewed. Welder qualifications have been reviewed. Inspection Type Elevation/Location Connection Type Type of Weld Referenced Documents Applicable Code Compliance Status* Final (1) At tops of piles, North abutment weld corrections and three piles at south abutment #8 A706 headed rebar dowels welded to inside of piles Flare-Bevel 2/S-9 AWS D1.4 Complies * See below for details Additional Comments North abutment weld corrections from inspection on 9-28-22 M7221137 (D. Candelaria) Compliance Statement Based on our observations, structural steel construction activities at the above-referenced locations appeared to be completed in general accordance with the project plans and specifications. DRA F T Photo Log Report Number:M7221137.0006 Service Date:11/29/22 20225 Cedar Valley Rd Ste 110 Report Date:11/29/22 Lynnwood, WA 98036-6365 425-742-9360 City of Renton WAAttn: Alan J. Wyatt CT0001, 10-16-13, Rev.10 Page 1 of 1 (P1) Headed rebar dowel welds DRA F T STRUCTURAL STEEL OBSERVATIONS REPORT Report Number:M7221137.0006 Service Date:11/29/22 20225 Cedar Valley Rd Ste 110 Report Date:11/29/22 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Thomas Cain Reported To:Aaron, American Construction Contractor:American Construction Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, John Blair(1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:__________________________________ __(1) WSP USA Inc, Garth Nelson, P.E. Dennis Sanborn Senior Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.CT0001, 10-16-13, Rev.10 Page 1 of 1 Permit No.: GENERAL INFORMATION COMPLIANCE STATEMENT Choose a compliance statement