HomeMy WebLinkAboutConcrete Observation.City of Renton Gene Coulon Memorial Beach Park (T).C21005257.2022-12-07.M7221137.0008CONCRETE OBSERVATION REPORT
Report Number:M7221137.0008
Service Date:12/07/22 20225 Cedar Valley Rd Ste 110
Report Date:12/08/22 Lynnwood, WA 98036-6365
425-742-9360
Client Project
City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T)
Attn: Alan J. Wyatt 1201 Lake Washington Blvd N
1055 S Grady Way Renton, WA
Renton, WA 98057-3232
Project Number: M7221137
Services: Special Inspections / Materials Testing
Mayes/Terracon Rep.: Barry Tuttle
Reported To:American Construction Company
Contractor:American Construction
Report Distribution:
(1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron
McMahill
(1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________
(1) WSP USA Inc, Garth Nelson, P.E. Dennis Sanborn
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not
necessarily indicative of the properties of other apparently similar or identical materials.
DM010, 04-29-22 Rev.3 Page 1 of 1
Permit No.: C21005257
GENERAL INFORMATION
Aaron with American Construction requested Terracon be on site for Reinforcing Steel and Concrete Observation of the
following elements: Isolated footing. These elements are being constructed by American Construction.
The construction documents referenced for this inspection included: Structural plan.
REINFORCING STEEL
Terracon observed reinforcing steel detailed below for the following items (as applicable): Grade, Configuration, Size, Lap
Length, Quantity, Spacing, Tying, Clearances, Steel Condition and Embedded Items.
Element Location Referenced
Documents Status Comments
Isolated
footing
(2) North and south
bridge abutment
S-1 S-3, S-9 S-10 Complies Corrective action missing
reinforcement from Mayes Terracon
report #0007 was corrected by RFI
#28.
CONCRETE PLACEMENT
Terracon observed concrete placement as follows:
Element Location Yardage Supplier Mix ID Mix Description
Isolated
footing
(1) North and south
bridge abutment
13yds Cadman P2D36476 Normal Weight, 5000-psi,
air-entrained concrete
Placement Method: Bucket and Lift Consolidation Method: Mechanical Vibrator Protection Method: Concrete
Blanket(s)
TESTS PERFORMED
Cast (5) 4x8” lab cure cylinders for compressive strength testing.
COMPLIANCE STATEMENT
Based on our observations and testing, the above noted items appear to be in general accordance with the project
documents.
Photo Log
Report Number:M7221137.0008
Service Date:12/07/22 20225 Cedar Valley Rd Ste 110
Report Date:12/08/22 Lynnwood, WA 98036-6365
425-742-9360
City of Renton WAAttn: Alan J. Wyatt
CT0001, 10-16-13, Rev.10 Page 1 of 1
(P1) South abutment