Loading...
HomeMy WebLinkAboutFabrication Shop Observation.City of Renton Gene Coulon Memorial Beach Park (T).2023-05-12.M7221137.0016FABRICATION SHOP OBSERVATION REPORT Report Number:M7221137.0016 Service Date:05/12/23 20225 Cedar Valley Rd Ste 110 Report Date:05/18/23 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Virgilio Reported To:American Construction Company Contractor:American Construction Company Inc Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron McMahill (1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________ (1) WSP USA Inc, Garth Nelson, P.E. Barry Tuttle Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM010, 04-29-22 Rev.3 Page 1 of 1 Permit No.: GENERAL INFORMATION Terracon Consultants performed Pre-Installation verification of high strength bolts for the City of Renton Gene Coulon Memorial park Bridge at Redmond welders in Anacortes WA. Pre-Installation verification for high strength bolts was performed on ASTM A325 bolts at the Redmond Welders fabrication shop for the following bolts: Grade Diameter Length Lot No. A325 3/4"2-1/2"E911I1 A325 1"2-3/4"E023K1 The testing was performed using the Skidmore Wilhelm Load Test Cell Model ML Serial No. ML13347 calibration date due 3/28/2024. The test results and details are listed in the attached Bolt test report. COMPLIANCE STATEMENT Based on our observations and testing, the above noted items appear to be in general accordance with the project documents. MTE 1521-2C, Rev 1, 9/16/09 Page 2 of 2 Project No.:M7221137 Date:05/12/23 Project:City of Renton Gene Coulon Park High Strength Bolt Tension Verification Test Skidmore-Wilhelm ID No.:MS13347 Calibration Date:3/28/2023 Torque Wrench ID No.:N/A Calibration Date:N/A Sample No.Bolt Grade Lot No. Bolt Diameter Bolt Length Measured Tension (kips) DTI Compression Rotation 1 ASTM A325 E911I1 3/4"2-1/2"32, 33, 32 N/A 1/3 2 ASTM A325 E023K1 1"2-3/4"66, 66, 59 N/A 1/3 Comments: Minimum TensionRequirements (kips) Bolt Size A-325 A-490 1/2"13 16 5/8"20 25 3/4"29 37 7/8"41 51 1"54 67 20225 CedarValley Road,Suite110Lynnwood,WA98036 10029 S.Tacoma Way,SuiteE-2Tacoma,WA 98499 P 425.742.9360 F 425.745.1737 P 253.584.3720 F 253.584.3707