Loading...
HomeMy WebLinkAboutFabrication Shop Observation.City of Renton Gene Coulon Memorial Beach Park (T).C21005257.2023-01-10.M7221137.0013FABRICATION SHOP OBSERVATION REPORT Report Number:M7221137.0013 Service Date:01/10/23 20225 Cedar Valley Rd Ste 110 Report Date:01/16/23 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Mark Vassallo Reported To:American Construction Company Inc Contractor:American Construction Company Inc Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron McMahill(1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:__________________________________ __(1) WSP USA Inc, Garth Nelson, P.E. Mark Gordon Department Manager III The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.CT0001, 10-16-13, Rev.10 Page 1 of 1 Permit No.: C21005257 GENERAL INFORMATION At Rainier Welding in Anacortes, WA for ultrasonic and visual welding inspection in accordance with AWS D1.1 specifications. Inspected piece mark SA-2 per shop drawings. A total of (16) plates and splices were tested and found acceptable. See attached Ultrasonic Examination Reports for details. COMPLIANCE STATEMENT Based on our observations and testing, the above noted items appear to be in general accordance with the project documents. Page 1 of 1 MTE 1521-2C, Rev 1, 9/16/09 Ultrasonic Examination Report Project No.:M7221137 Date:1/10/23 Project:Gene Coulon Memorial Beach Park Specification:AWS D1.1 Weld Process:SMAW X FCAW GMAW SAW UT Equipment:Long Transducer:Shear Transducer:Calibration Block Model USMGO+Freq.:Freq.:2.25 X IIW DSC Serial No.: GOPLS22100078 Size:Size:5/8 X 5/8 Other: Location Weld Indication NumberTransducer AngleDecibels Discontinuity (Inches)AcceptRejectRemarks Indication Level Reference LevelAttenuation LevelIndication RatingIndication Level Sound Path Length Depth DistanceabcdXY Truss SA-2 Tf 70 69 X End #1 7' of Weld Truss SA-2 Tf 70 69 X Splice #1 Truss SA-2 T,B,W 70 69 X Splice #2 Truss SA-2 T,B,W 70 69 X Splice #3 Truss SA-2 Tf 70 69 X End #2 7' of Weld Remarks: An ultrasonic inspection was performed per AWS D1.1 on the above listed welds. Not all welds could be fully examined due to normal geometry of the welds. All welds were acceptable per plans and specifications at the time of inspection. Inspector:Mark Vassallo Level:II 20225 Cedar Valley Road,Suite 110 Lynnwood,WA 98036 P 425.742.9360 F 425.745.1737