HomeMy WebLinkAboutFabrication Shop Observation.City of Renton Gene Coulon Memorial Beach Park (T).Not Applicable.2022-11-23.M7221137.0004FABRICATION SHOP OBSERVATION REPORT
Report Number:M7221137.0004
Service Date:11/23/22 20225 Cedar Valley Rd Ste 110
Report Date:11/28/22 Lynnwood, WA 98036-6365
425-742-9360
Client Project
City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T)
Attn: Alan J. Wyatt 1201 Lake Washington Blvd N
1055 S Grady Way Renton, WA
Renton, WA 98057-3232
Project Number: M7221137
Services: Special Inspections / Materials Testing
Mayes/Terracon Rep.: Michael Virgilio
Reported To:City of Renton
Contractor:American Construction Company Inc
Report Distribution:
(1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, John Blair
(1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________
(1) WSP USA Inc, Garth Nelson, P.E. Dennis Sanborn
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not
necessarily indicative of the properties of other apparently similar or identical materials.
DM010, 04-29-22 Rev.3 Page 1 of 1
Permit No.: Not Applicable
GENERAL INFORMATION
Terracon Consultants performed Visual and Ultrasonic Inspection of structural steel for the Gene Coulon Memorial project at
Rainier Welding I Anacortes WA.
SUMMARY OF TESTING
Visual Inspection was performed on the following piece marks:
Columns
C-809 C-817 C-818 C-819 C-820
C-821 C-825 C-826
Beams
B-827
Braces
B-822 B-823 B-824 B-828 B-829
B-830
Inspection found welds on these members in compliance with AWS D1.1.
Ultrasonic Testing was performed on columns C-809 and C-819.
Ultrasonic Testing found welds on these members in compliance with AWS D1.1.
See attached UT report for details.
COMPLIANCE STATEMENT
Based on our observations and testing, the above noted items appear to be in general accordance with the project
documents.
MTE 1521-2C, Rev 1, 9/16/09
Page 2 of 2
Ultrasonic Examination Report
Project No.M7221137 Date:11/23/2022
Project Gene Coulon Park
Specification:AWS D1.1 Weld Process: SMAW FCAW GMAW SAW
UT Equipment:Long Transducer:Shear Transducer:Calibration Block:
Model USMGO+Freq.:2.25 Freq.:2.25 IIW DSC
Serial No.: GOPLS16010180 Size:1"Size:.75 x.75 Other:
Decibels Discontinuity
Location Weld Indication NumberTransducer Angle Indication Level Reference Level Attenuation Level Indication RatingSound
Path Length Depth X Y AcceptRejectRemarks
C-809 70 40 X Piece 809 to p1136
C-819 70 40 X piece 819 to p1138
Inspector:Michael Virgilio Level:III