Report Number:M7221137.0015
Service Date:03/20/23 20225 Cedar Valley Rd Ste 110
Report Date:03/22/23 Lynnwood, WA 98036-6365
425-742-9360
Client Project
City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T)
Attn: Alan J. Wyatt 1201 Lake Washington Blvd N
1055 S Grady Way Renton, WA
Renton, WA 98057-3232
Project Number: M7221137
Services: Special Inspections / Materials Testing
Mayes/Terracon Rep.: Michael Virgilio
Reported To:American Construction Company
Contractor:American Construction Company Inc
Report Distribution:
(1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron
McMahill
(1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________
(1) WSP USA Inc, Garth Nelson, P.E. Mark Gordon
Department Manager III
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not
necessarily indicative of the properties of other apparently similar or identical materials.
DM010, 04-29-22 Rev.3 Page 1 of 1
Permit No.: Not Applicable
GENERAL INFORMATION
Mayes/Terracon Consultants performed Visual and Ultrasonic testing for complete penetration welds on the City
of Renton Gene Coulon Memorial Park Bridge at Rainier welding in Anacortes WA.
Testing was performed on complete penetration welds on the plated sides of built-up beam members B111,
B112, and B130.
Inspection found the welding on these joints in compliance with AWS D1.1.
See attached UT report for details.
COMPLIANCE STATEMENT
Based on our observations and testing, the above noted items appear to be in general accordance with the
project documents.
MTE 1521-2C, Rev 1, 9/16/09
Page 2 of 3
Ultrasonic Examination Report
Project No.M7221137 Date:3/20/2023
Project Rento Coulon Bridge
Specification:AWS D1.1 Weld Process: SMAW FCAW GMAW SAW
UT Equipment:Long Transducer:Shear Transducer:Calibration Block:
Model USMGO+Freq.:2.25 Freq.:2.25 IIW DSC
Serial No.: GOPLS16010180 Size:1"Size:.75 x.75 Other:
Decibels Discontinuity
Location Weld Indication NumberTransducer Angle Indication Level Reference Level Attenuation Level Indication RatingSound
Path Length Depth X Y AcceptRejectRemarks
B111 70 37 X Piece p1021 to added plate-1
B111 70 37 X added plate-1 to p1018-1
B111 70 37 X p1018-1 to p1018-2
B111 70 37 X p1018-2 to p1012
B111 70 37 X p1009 to p1007-1
B111 70 37 X p1007-1-to p1007-2
B111 70 37 X p1007-2 to added plate-2
B111 70 37 X added plate-2 to p1008
B112 70 37 X p1055 to p1054-1
B112 70 37 X p1050 to p1022-1
B112 70 37 X p1050 to added plate -1
B112 70 37 X added plate -1 to p1057-1
B112 70 37 X p1057-1 top1057-2
B112 70 37 X p1022-2 to p1052
B112 70 37 X p1022-1 to p1022-2
B112 70 37 X p1022-2 to added plate 2
B130 70 37 X p10001 to p1004-1
B130 70 37 X p1004-1 to p1004-2
B130 70 37 X p1004-2 to added plate-1
Inspector:Michael Virgilio Level:III
20225 Cedar Valley Road,Suite
110 Lynnwood,WA 98036
10029 S.Tacoma Way,Suite E-2
Tacoma,WA 98499
P 425.742.9360
F 425.745.1737
P 253.584.3720
F 253.584.3707
b c d
Distance
a
MTE 1521-2C, Rev 1, 9/16/09
Page 3 of 3
Ultrasonic Examination Report
Project No.M7221137 Date:3/20/2023
Project Rento Coulon Bridge
Specification:AWS D1.1 Weld Process: SMAW FCAW GMAW SAW
UT Equipment:Long Transducer:Shear Transducer:Calibration Block:
Model USMGO+Freq.:2.25 Freq.:2.25 IIW DSC
Serial No.: GOPLS16010180 Size:1"Size:.75 x.75 Other:
Decibels Discontinuity
Location Weld Indication NumberTransducer Angle Indication Level Reference Level Attenuation Level Indication RatingSound
Path Length Depth X Y AcceptRejectRemarks
B130 70 37 X added plate-1 to p1002
B130 70 37 X p1004 to added plate-2
B130 70 37 X added plate -2 to p1003-1
B130 70 37 X p1003-1 to p1003-2
B130 70 37 X p1003-2 to p1002
B130 70 37 X p1002 to p1005
Inspector:Michael Virgilio Level:III
20225 Cedar Valley Road,Suite
110 Lynnwood,WA 98036
10029 S.Tacoma Way,Suite E-2
Tacoma,WA 98499
P 425.742.9360
F 425.745.1737
P 253.584.3720
F 253.584.3707
b c d
Distance
a