Loading...
HomeMy WebLinkAboutFabrication Shop Observation.City of Renton Gene Coulon Memorial Beach Park (T).Not Applicable.2023-05-17.M7221137.0017FABRICATION SHOP OBSERVATION REPORT Report Number:M7221137.0017 Service Date:05/17/23 20225 Cedar Valley Rd Ste 110 Report Date:05/18/23 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Michael Virgilio Reported To:American Construction Company Contractor:American Construction Company Inc Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron McMahill (1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________ (1) WSP USA Inc, Garth Nelson, P.E. Barry Tuttle Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM010, 04-29-22 Rev.3 Page 1 of 1 Permit No.: Not Applicable GENERAL INFORMATION Terracon Consultants performed Inspection of high strength bolts for the City of Renton Gene Coulon Memorial park Bridge at Redmond welders in Anacortes WA. Inspection consisted of verification of the Turn of the Nut Tensioning as specified by the RCSC Bolt specification and the Washington Department of transportation (WSDOT) Construction Specification. The specification for the bolt installation and tensioning are noted on the General note 7 and Metals Fabrication note 7 on drawing S-1. Bolting was performed on the three major bridge members fabricated in the Anacortes facility. The members are connected by Galvanized angle iron and Channel Iron members. Inspection verified the installed 3/4” and 1” diameter bolts were fully tensioned using the turn of the nut method. Inspection was performed by verification of Match Marks used in the Turn of the Not method as described in the RCSC specification for high strength bolt. Inspection of this bolting was found in compliance with the structural and shop drawings. Jam nuts are planned to be installed at the erection site. COMPLIANCE STATEMENT Based on our observations and testing, the above noted items appear to be in general accordance with the project documents.