Loading...
HomeMy WebLinkAboutField Density Testing.City of Renton Gene Coulon Memorial Beach Park (T).C21005257.2023-07-20.M7221137.0028FIELD DENSITY TESTING REPORT Report Number:M7221137.0028 Service Date:07/20/23 20225 Cedar Valley Rd Ste 110 Report Date:07/21/23 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Paul Lobaugh Reported To:American Construction Company Contractor:American Construction Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron McMahill (1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________ (1) WSP USA Inc, Garth Nelson, P.E. Barry Tuttle Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM010, 04-29-22 Rev.3 Page 1 of 1 Permit No.: C21005257 GENERAL INFORMATION Rob with American Construction requested Terracon be on site for field density testing, fill placement observation. Earthwork is being performed by American Construction. The results of observations for today were reported to Rob with American Construction. The construction documents referenced for this inspection included: G-4 dated 1/28/2022. OBSERVED LOCATIONS North and south sides of bridge SUBGRADE REVIEW Prior to the placement of fill the subgrade was reviewed and consisted of sand with gravel . The subgrade was observed to be firm and stable. FILL PLACEMENT Fill Type Placed Proctor No.(s)Fill Description Source of Fill Aggregate Base 22L Sand with gravel Imported from pit The fill was observed to be placed in an approximately 4-inch-thick lift. Compactive efforts were applied with the following equipment: jumping jack, hand operated vibratory plate. The fill placed appeared firm and stable during the application of compactive efforts. DENSITY TEST RESULTS Field density tests were conducted on the fill placed today utilizing the nuclear method (ASTM D6938). Two(2) field density tests were performed. The test results met the minimum specified 95% compaction requirement as compared to ASTM D 1557 test method. Refer to the attached field density test summary for individual test data. COMPLIANCE STATEMENT Based on our observations and testing, the above noted items appear to be in general accordance with the project documents. FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: M7221137.0028 07/20/23 07/21/23 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360 Client City of Renton WA Attn: Alan J. Wyatt 1055 S Grady Way Renton, WA 98057-3232 City of Renton Gene Coulon Memorial Beach Park (T) 1201 Lake Washington Blvd N Renton, WA Project - M7221137 Permit No.: C21005257 (%) Compaction (%) Content Water No. Mat. Material Information Density Max. Lab (%) Content Opt. Water Ref. No. Proctor Laboratory Classification and Description (pcf)Test Method Project RequirementsLab Test Data Min 951137.98.8M7221137.0022L Sandy gravel ASTM D1557 Field Test Data No.Test Location Elev.No. Test Lift /Mat.Depth Density Probe Wet Content Water (%) Content Water Density Dry (%) Percent Compaction (in)(pcf)(pcf)(pcf) 1 15’ north of bridge Subgrade 1 BS 145.2 12.1 9.1 133.1 97 2 South side of bridge Subgrade 1 BS 142.5 11.4 8.7 131.1 95 Comments: Datum:Other - See comments Std. Cnt. M:Std. Cnt. D:1556673 Test and/or retest results on this report meet project requirements as noted above. Subgrade Last Cal. Date:Model:Make:S/N:19564 (T-16)Troxler 3430 04/07/2023 Special Inspections / Materials TestingServices: Reported To: Contractor: American Construction Company American Construction Barry Tuttle Project Field Manager Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron McMahill (1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay (1) WSP USA Inc, Garth Nelson, P.E. Reviewed By: Mayes/Terracon Rep.: Paul Lobaugh ASTM D698, ASTM D1557, ASTM D2216, ASTM D6938Test Methods: The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 03-31-22, Rev.8 Page 1 of 1 Photo Log Report Number:M7221137.0028 Service Date:07/20/23 20225 Cedar Valley Rd Ste 110 Report Date:07/21/23 Lynnwood, WA 98036-6365 425-742-9360 City of Renton WAAttn: Alan J. Wyatt CT0001, 10-16-13, Rev.10 Page 1 of 1 (P1) Compacting material