HomeMy WebLinkAboutM7221137.0021.1.060623REINFORCING STEEL OBSERVATIONS REPORT
Report Number: M7221137.0021 Service Date: 06/06/23 20225 Cedar Valley Rd Ste 110
Report Date: 06/06/23 Lynnwood, WA 98036-6365
425-742-9360
Client Project
City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T)
Attn: Alan J. Wyatt 1201 Lake Washington Blvd N
1055 S Grady Way Renton, WA
Renton, WA 98057-3232
Project Number: M7221137
Services: Special Inspections / Materials Testing
Mayes/Terracon Rep.: Craig Williams
Reported To: Aaron, American Construction
Contractor: American Construction
Report Distribution:
(1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron McMahill
(1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By: ____________________________________
(1) WSP USA Inc, Garth Nelson, P.E. Barry Tuttle
Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
DM022, 04-29-22 Rev.7 Page 1 of 1
General Information
Aaron, American Construction requested Terracon to be on site for reinforcing steel observation of the following elements: slab-on-deck. These elements are being constructed by American Construction. The results of observation(s) for today were reported to Aaron, American Construction. The construction documents referenced for this observation include: Approved plans and documents. Permit No: C21005257.
Reinforcing Steel
Terracon observed reinforcing steel detailed below for the following items (as applicable): grade, configuration, size, lap length, quantity, spacing,
tying, clearances, steel condition and embedded items.
Element Location Referenced Documents Status Comments
Railing Slab East & West side of Pedestrian
Bridge
D/S.6 Complies
Compliance Statement
Based on our observations, reinforcing steel at the above-referenced locations appeared to be completed in general accordance with the project
plans and specifications.